Pollutant Loads to the Bay: Measuring the L in TMDL Lester McKee Sources Pathways and Loadings Workgroup and Watershed Program Manager SFEI RMP Annual.

Slides:



Advertisements
Similar presentations
The Clean Estuary Partnership and the RMP Comparing two stakeholder programs producing science in support of policy James M. Kelly, Chair Bay Area Clean.
Advertisements

AN OVERVIEW Jay A. Davis San Francisco Estuary Institute.
Exposure & Effects Pilot Study (EEPS) RMP Objective #4 RMP Objective #4 Measure pollution exposure and effects on selected parts of the Estuary ecosystem.
4.26 CEP/RMP Sediment Core Plan Draft & Comments CFWG Sept 2005.
Slide 1 Item #6 Watershed Modeling at SFEI John J. Oram, Lester J. McKee, Mikolaj Lewicki SPLWG December 2007.
Guadalupe River Hg Monitoring WY 2010 Jen Hunt Sources, Pathway, and Loading Work Group May 27, 2009 Item #3.
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
Guadalupe River Small Tributaries Loading Study: Do we continue? If so How!! Lester McKee San Francisco Estuary Institute, Oakland, CA San Francisco Estuary.
Contaminant Fate WG 5 Year Plan RMP CFWG Meeting January 15, 2008.
RMP Dioxin Strategy Susan Klosterhaus Sources Pathways and Loadings Workgroup Item #9.
PCBs in San Francisco Bay Area Municipal Wastewater Effluents Donald Yee*, Jon Leatherbarrow, Jay Davis.
1 Update on Small Tributaries Loading Strategy Richard Looker, Chris Sommers, Arleen Feng, Jay Davis, and Lester McKee Sources Pathways and Loadings Workgroup.
Concentrations and loads of PCBs and OC pesticides in the urbanized Guadalupe River watershed Presented to: RMP Sources, Pathways, and Loadings Workgroup.
1 WATERSHED SPECIFIC AND REGIONAL SCALE SUSPENDED SEDIMENT LOAD ESTIMATES FOR BAY AREA SMALL TRIBUTARIES Mikołaj Lewicki and Lester McKee Sources Pathways.
Sources Pathways and Loadings 5-year Work plan Received and discussed special and pilot studies proposals at WG meetings Small tributaries reconnaissance.
Exposure & Effects Pilot Study (EEPS) RMP Objective #4 Measure pollution exposure and effects on selected parts of the Estuary ecosystem (including humans)
Developing Water Quality Solutions for SF Bay
Contaminants at the Estuary Interface Jon Leatherbarrow 1 Rainer Hoenicke 2 Lester McKee 1 1 San Francisco Estuary Institute 2 California Resources Agency.
Outline 1.Brief overview of multibox model (John) 2.Results of independent testing (Katherine) 3.Next steps for development (?)(John) 4.Overview of planned.
Concentrations and loads of PCBs and OC pesticides in the Guadalupe River watershed Jon Leatherbarrow 1,2, Lester McKee 1, John Oram 1 1 San Francisco.
Suspended Sediment Loads from Bay Area Small Tributaries Mikolaj Lewicki and Lester McKee Sources Pathways and Loading Workgroup May 14 th 2008 Item #3a.
Sources Pathways and Loading Workgroup Announcements Item #1.
Draft Strategy Revised RMP Modeling Strategy John Oram Jay Davis Item #8.
1 PCBs and PBDEs on the Guadalupe River WYs 2003 – 2006 John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings Workgroup November.
Measurements of Mercury Concentrations and Loads in a Large River System Tributary to San Francisco Bay, California, USA Nicole David, SFEI Lester McKee,
High Flow Studies (WY 2005) Lester McKee Sources Pathways and Loadings Workgroup.
Dioxin Sources, Loadings, and Inventory Data for San Francisco Bay RMP Technical Review Committee Meeting March 18 th, 2008.
Item #4 Slide 1 A Mass Budget of Polybrominated Diphenyl Ethers in San Francisco Bay, CA John J. Oram, Lester J. McKee, Christine E. Werme, Mike S. Connor,
Draft Strategy RMP Modeling Strategy John Oram Jay Davis.
Small Tributary Loads The Guadalupe River Study Lester McKee, John Oram, Jon Leatherbarrow SFEI Autumn Bonnoma, Mark Stephenson, Wes Heim MLML.
1 PCB and PBDE Loads in Coyote Creek: Conceptual models and Estimates of Regional Small Tributaries Loads Lester McKee, John Oram and, Jon Leatherbarrow.
Comparative Analysis of Loads of Mercury in Coyote Creek and Guadalupe River Lester McKee RMP SPLWG Chair San Francisco Estuary Institute
Mercury and PCBs TMDL Implementation Tom Mumley San Francisco Bay Regional Water Quality Control Board.
Regional Board Monitoring and Special Studies Related to 303d Listing and TMDLs Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
The RMP Mercury Strategy Jay A. Davis San Francisco Estuary Institute Presented at: The RMP Mercury Coordination Meeting Feb 2008.
1 Trace element loads in urbanized watersheds and the potential for treatment of NPS loads Lester McKee Sources Pathways and Loadings Workgroup May 22.
Mercury Transport to San Francisco Bay through the Sacramento-San Joaquin River Delta. Nicole David, Lester J. McKee, Jon E. Leatherbarrow December 15,
River Loads The Mallard Island Study Nicole David, John Oram, Lester McKee, SFEI Russ Flegal, UCSC.
The South Bay Salt Pond Restoration Project and Bay Water Quality SFEI Letitia Grenier, Jay Davis, Robin Grossinger.
In Pursuit of Urban Runoff in an Urbanized Estuary: Losing sleep over troubled water In Pursuit of Urban Runoff in an Urbanized Estuary:Losing sleep over.
1 PCB and PBDE loads at Mallard Island on the Sacramento River: WYs John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings.
RMP Program Objectives & Management Questions Question 3: Describe sources, pathways, loadings, and processes leading to pollutant-related impairment in.
1 Guadalupe Watershed Model Year 2 update Presentation to SPLWG May 27, 2009 Michelle Lent, John Oram, Lester McKee Item #7.
Starting a New Small Tributaries Loads Study WY 2007: Zone 4 Line A - Progress to-date Lester McKee and Rand Eads Sources Pathways and Loadings Workgroup.
Progress in Estimating Loads at Mallard Island Nicole David Lester McKee Item #4.
1 Guadalupe Small Tributaries Loads Study WYs (PCBs and PBDEs) John Oram and Lester McKee Sources Pathways and Loadings Workgroup November 13 th.
Mallard Island and the Largest Flood Event Since 1997 Nicole David Lester McKee San Francisco Estuary Institute.
Advances in Understanding Pollutant Mass Loadings Lester McKee Jon Konnan, Richard Looker, Nicole David, Jay Davis Article on Page 77 of the Pulse.
The Wisconsin River TMDL: Linking Monitoring and Modeling Ann Hirekatur, Pat Oldenburg, & Adam Freihoefer March 7, 2013 Wisconsin River TMDL Project Team.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
RMP NOV 08 Watershed Monitoring and the RMP Lester McKee and Meg Sedlak Presentation to North Bay Watershed Association September 10 th, 2010.
1 Small Tributaries Loading Study #2: Zone 4 Line A, Cabot Blvd. Hayward Year 1 – Draft FINAL report Lester McKee and Alicia Gilbreath Sources Pathways.
The RMP Mercury Strategy: Studies Underway. Talk Presents Multiple Data Sets Katie Harrold, Aroon Melwani, Andy Jahn, Jay Davis, John Oram, Shira Bezalel,
Benefits of the Redesigned RMP to Regional Board Decision Making Karen Taberski Regional Water Quality Control Board San Francisco Bay Region.
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
A Watershed Year for RMP & CEP: Sources Pathways & Loadings 2002/03 Lester McKee & Jon Leatherbarrow May 2003.
Small Tributary Loads The “Guadalupe River Study” Lester McKee, John Oram, Jon Leatherbarrow SFEI Autumn Bonnoma, Mark Stephenson, Wes Heim MLML Item #8.
Item 3b Guadalupe River Monitoring WY 2010 Jen Hunt, Ben Greenfield, Sarah Lowe, Lester McKee Sources, Pathway, and Loading Work Group May 6th, 2010.
1 Regional Data Review : What have we learned in eight years? Lester McKee Sources Pathways and Loadings Workgroup Monday December 8 th 2008 San Francisco.
1 Richard Looker 2008 RMP Annual Meeting October 7, 2008 The Water Board’s Regulatory Approach and the RMP Mercury Strategy Hg.
Preliminary Scoping Effort. Presentation Objectives Identify need for additional sources of future funding Provide background on how elements were identified.
Water Quality in San Francisco Bay J.A. Davis San Francisco Estuary Institute.
1 Develop/update spreadsheet model for regional loading and trends Michelle Lent, John Oram, and Lester McKee Sources Pathways and Loadings Workgroup May.
1 Dynamic modeling in a representative watershed (Guadalupe) Michelle Lent, John Oram, and Lester McKee Sources Pathways and Loadings Workgroup May 6 th.
1 Optimizing sampling methods for pollutant loads and trends in San Francisco Bay urban stormwater monitoring Aroon Melwani, Michelle Lent, Ben Greenfield,
Sources, Pathways, and Loadings Regional Monitoring Program for Trace Substances Annual Meeting, March 23 rd 2002 Lester McKee Watershed Program Manager.
John J. Oram, Lester J. McKee, Christine E. Werme, Mike S
Lester McKee RMP Sources Pathways and Loadings Work Group Chair
SETAC North America 28th Annual Meeting
PCB Impairment Assessment/ Conceptual Model
Presentation transcript:

Pollutant Loads to the Bay: Measuring the L in TMDL Lester McKee Sources Pathways and Loadings Workgroup and Watershed Program Manager SFEI RMP Annual Meeting, May 10 th 2005

SPLWG Achievements 13 technical reports over the past 5 years including reports on urban drainage, atmospheric inputs, and sediment loads 13 technical reports over the past 5 years including reports on urban drainage, atmospheric inputs, and sediment loads Developed conceptual models and designed evaluation strategies for monitoring Hg, PCBs and OC pesticides in stormwater runoff Developed conceptual models and designed evaluation strategies for monitoring Hg, PCBs and OC pesticides in stormwater runoff Implemented stormwater monitoring studies at Mallard Is. and Guadalupe R. Implemented stormwater monitoring studies at Mallard Is. and Guadalupe R. SPLWG - The leading source of loads information SPLWG - The leading source of loads information Forum for discussion Forum for discussion RMP Annual Meeting 2005

SPLWG - Systematic Plan A.Watershed Characterization B.Conceptual Model Development C.Develop Evaluation Strategies D.Establish Regional Network of Observation Watersheds E.Extrapolate to Other Watersheds RMP Annual Meeting 2005 Davis et al., 1999, 2000

The Pathways of L… Loads enter the Bay from 5 main pathways: Loads enter the Bay from 5 main pathways: 1. Urban stormwater 2. New Almaden mining area 3. Atmospheric deposition 4. Urban and industrial wastewater 5. Large Rivers RMP Annual Meeting Total Mercury Inputs

Why Else Study Loads? Improve understanding of variation (both spatial and temporal) Improve understanding of variation (both spatial and temporal) Estimate loads in unmeasured places (extrapolation and modeling) Estimate loads in unmeasured places (extrapolation and modeling) Measure change over time in relation Measure change over time in relation to management activities RMP Annual Meeting 2005

Recent SPLWG Highlights Completed technical reports on the Mallard Is. and Guadalupe River field studies Completed technical reports on the Mallard Is. and Guadalupe River field studies Submitted three papers to scientific journals Submitted three papers to scientific journals Began discussions on how to choose a location for another small tributaries loading study Began discussions on how to choose a location for another small tributaries loading study Received 6 special and pilot studies proposals Received 6 special and pilot studies proposals Initiated the development of a new 5-year work plan Initiated the development of a new 5-year work plan RMP Annual Meeting 2005

Special and Pilot Studies Proposals #1: Small Tributaries Loading study (number two) #2: Design of a watershed RMP #3: Improving Bay Area hydrography for characterization and modeling stormwater flow modeling stormwater flow #4: Storm drain outfall sediment characterization #5: Determining the ability for loadings studies to observe change change #6: Enhanced isohyetal analysis of the SF Bay Area RMP Annual Meeting 2005

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

SPLWG 5-Yr Work Plan ( ) RMP Annual Meeting 2005 Activity Funding Sources Workgroup meetings and external coordinationRMP ASASASASAS $22k Mallard Island Large River Loadings StudyRMP$51k$60kContingency$120k Guadalupe Small Tributaries Loadings Study CEP, RMP, USACE, SCVURPPP$173k$50k??? Reconnaissance Survey of Loading Study SitesRMP$7.5k Additional small tributaries loadings studies???In-kind???? Extrapolations / regional loading estimates??? ??? Development of the next five- year planRMP $10k

Next Steps and Philosophy Receive written comments on the draft work plan Receive written comments on the draft work plan Revise work plan to reflect oral and written comments Revise work plan to reflect oral and written comments Systemically update the work plan as new information is generated (i.e. a living document) Systemically update the work plan as new information is generated (i.e. a living document) RMP Annual Meeting 2005

Field Studies WY 2005 Highlights Mallard Island Large Rivers Loading Study Mallard Island Large Rivers Loading Study Guadalupe River Small Tributaries Loading Study Guadalupe River Small Tributaries Loading Study

The Mallard Island Study SFEI: Management/sampling assistance/report SFEI: Management/sampling assistance/report USGS SSC/turbidity data collection USGS SSC/turbidity data collection RWQCBX-section variability RWQCBX-section variability UCSC Sample collection/Hg and SSC analysis UCSC Sample collection/Hg and SSC analysis AXYS Organic contaminant analysis AXYS Organic contaminant analysis RMP Annual Meeting 2005 Funding: RMP

The Mallard Island Study Location Map RMP Annual Meeting 2005

Suspended Sediment Loads RMP Annual Meeting Mt

Sampling for Trace Contaminants RMP Annual Meeting 2005

Total Mercury Loads RMP Annual Meeting 2005

Total Mercury Loads RMP Annual Meeting kg

PCB Loads RMP Annual Meeting 2005

The Guadalupe Small Tributaries Loads Study SFEIManagement/trace contaminant sampling/report SFEIManagement/trace contaminant sampling/report USGSSuspended sediment and bed loads USGSSuspended sediment and bed loads MLMLTrace element analysis of water and sediment MLMLTrace element analysis of water and sediment AXYSOrganic contaminant analysis AXYSOrganic contaminant analysis RMP Annual Meeting 2005 Funding: RMP, CEP, USACE/SCVWD, SCVURPPP

The Guadalupe Small Tributaries Loads Study SFEI WY 2005 field team SFEI WY 2005 field team Nicole David Nicole David Jennifer Hayworth Jennifer Hayworth Jennifer Hunt Jennifer Hunt Kristen Larned Kristen Larned Jon Leatherbarrow Jon Leatherbarrow Aroon Melwani Aroon Melwani Sarah Pearce Sarah Pearce 51% Samples collected outside of work time

The Guadalupe Small Tributaries Loads Study Location Map RMP Annual Meeting 2005

Suspended Sediment Load RMP Annual Meeting 2005 Preliminary

Sampling for Trace Contaminants RMP Annual Meeting 2005

Total Mercury Loads RMP Annual Meeting 2005 Max annual: 900 – 1,100 kg 5-yr mean: 6 – 440 kg

PCB Loads RMP Annual Meeting 2005

Closing Comments SPLWG efforts over the past 5 years has had a profound influence our perceptions of Bay functions SPLWG efforts over the past 5 years has had a profound influence our perceptions of Bay functions This emerging understanding has strongly influenced the development of the mercury and PCB TMDLs This emerging understanding has strongly influenced the development of the mercury and PCB TMDLs To complete the circle, the TMDL recommendations are now influencing the planning process for new SPLWG studies To complete the circle, the TMDL recommendations are now influencing the planning process for new SPLWG studies Without the dedicated field team at SFEI, much of this information would not have been generated Without the dedicated field team at SFEI, much of this information would not have been generated RMP Annual Meeting 2005