Mercury Transport to San Francisco Bay through the Sacramento-San Joaquin River Delta. Nicole David, Lester J. McKee, Jon E. Leatherbarrow December 15,

Slides:



Advertisements
Similar presentations
EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Advertisements

1 A B C
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Worksheets.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
Guadalupe River Small Tributaries Loading Study: Do we continue? If so How!! Lester McKee San Francisco Estuary Institute, Oakland, CA San Francisco Estuary.
Concentrations and loads of PCBs and OC pesticides in the Guadalupe River watershed Jon Leatherbarrow 1,2, Lester McKee 1, John Oram 1 1 San Francisco.
Zone 4 Line A Preliminary Suspended Sediment Load Estimates HY08 Rand Eads RiverMetrics LLC Sources.
Mallard Island cross-sectional variability: low-flow, moderate-flow, and high-flow events SF Bay Sediment Project U.S. Geological Survey Sacramento, CA.
1 PCBs and PBDEs on the Guadalupe River WYs 2003 – 2006 John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings Workgroup November.
Measurements of Mercury Concentrations and Loads in a Large River System Tributary to San Francisco Bay, California, USA Nicole David, SFEI Lester McKee,
High Flow Studies (WY 2005) Lester McKee Sources Pathways and Loadings Workgroup.
Pollutant Loads to the Bay: Measuring the L in TMDL Lester McKee Sources Pathways and Loadings Workgroup and Watershed Program Manager SFEI RMP Annual.
Small Tributary Loads The Guadalupe River Study Lester McKee, John Oram, Jon Leatherbarrow SFEI Autumn Bonnoma, Mark Stephenson, Wes Heim MLML.
1 PCB and PBDE Loads in Coyote Creek: Conceptual models and Estimates of Regional Small Tributaries Loads Lester McKee, John Oram and, Jon Leatherbarrow.
Comparative Analysis of Loads of Mercury in Coyote Creek and Guadalupe River Lester McKee RMP SPLWG Chair San Francisco Estuary Institute
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
1 Trace element loads in urbanized watersheds and the potential for treatment of NPS loads Lester McKee Sources Pathways and Loadings Workgroup May 22.
River Loads The Mallard Island Study Nicole David, John Oram, Lester McKee, SFEI Russ Flegal, UCSC.
1 PCB and PBDE loads at Mallard Island on the Sacramento River: WYs John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings.
1 Guadalupe Watershed Model Year 2 update Presentation to SPLWG May 27, 2009 Michelle Lent, John Oram, Lester McKee Item #7.
Starting a New Small Tributaries Loads Study WY 2007: Zone 4 Line A - Progress to-date Lester McKee and Rand Eads Sources Pathways and Loadings Workgroup.
Progress in Estimating Loads at Mallard Island Nicole David Lester McKee Item #4.
1 Guadalupe Small Tributaries Loads Study WYs (PCBs and PBDEs) John Oram and Lester McKee Sources Pathways and Loadings Workgroup November 13 th.
Mallard Island and the Largest Flood Event Since 1997 Nicole David Lester McKee San Francisco Estuary Institute.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
Year 6 mental test 10 second questions
County-level Estimates of Leisure Time Physical Inactivity among Adults aged 20 years old Trends
Break Time Remaining 10:00.
The basics for simulations
PP Test Review Sections 6-1 to 6-6
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Regression with Panel Data
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
When you see… Find the zeros You think….
25 seconds left…...
: 3 00.
Static Equilibrium; Elasticity and Fracture
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Advances in Understanding Pollutant Mass Loadings Lester McKee Jon Konnan, Richard Looker, Nicole David, Jay Davis Article on Page 77 of the Pulse.
1 Small Tributaries Loading Study #2: Zone 4 Line A, Cabot Blvd. Hayward Year 1 – Draft FINAL report Lester McKee and Alicia Gilbreath Sources Pathways.
A Watershed Year for RMP & CEP: Sources Pathways & Loadings 2002/03 Lester McKee & Jon Leatherbarrow May 2003.
Small Tributary Loads The “Guadalupe River Study” Lester McKee, John Oram, Jon Leatherbarrow SFEI Autumn Bonnoma, Mark Stephenson, Wes Heim MLML Item #8.
Item 3b Guadalupe River Monitoring WY 2010 Jen Hunt, Ben Greenfield, Sarah Lowe, Lester McKee Sources, Pathway, and Loading Work Group May 6th, 2010.
1 Regional Data Review : What have we learned in eight years? Lester McKee Sources Pathways and Loadings Workgroup Monday December 8 th 2008 San Francisco.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 6 th 2010 Rand Eads RiverMetrics.
1 Optimizing sampling methods for pollutant loads and trends in San Francisco Bay urban stormwater monitoring Aroon Melwani, Michelle Lent, Ben Greenfield,
Sources, Pathways, and Loadings Regional Monitoring Program for Trace Substances Annual Meeting, March 23 rd 2002 Lester McKee Watershed Program Manager.
Presentation transcript:

Mercury Transport to San Francisco Bay through the Sacramento-San Joaquin River Delta. Nicole David, Lester J. McKee, Jon E. Leatherbarrow December 15, 2005 Item #7

Sampling Event 2005 January 3 through 6, 2005

Sampling Event 2005 Max dayflow 58,000 cfs (Max dayflow so far 150,000 cfs)

Sampling Event 2005 Max HgT ng/L

Relationship between total Hg and SSC

Relationship between total Hg and SSC influenced by salinity

Annual Mercury Loads Water YearFlow (Mm 3 )Sediment (Mt)Mercury (kg) , ± ± , ± ± , ± ± , ± ± , ± ± , ± ± , ±0.0852± , ±0.1058± , ±0.1797± , ± ± *14, ±0.1164±22 Average27, ± ±61

Organic Contaminants *four samples collected in May 2003 had TPCB concentrations ranging from 890 – 6700 pg/L Item #7

Preliminary Loading Estimates Loads are preliminary and were estimated using Regression (REG) and Flow Weighted Mean Concentrations (FWMC). Preliminary estimates of errors are approximately ± 25%. PCBs PAHs FWMC Item #7

Project Sampling Schedule WY 2006: Collect first flush data and sample storm event over 150,000 cfs WY 2007: Sample storm event over 150,000 cfs only* WY 2008: Sample storm event over 150,000 cfs only* WY 2009: Sample all floods * With RMP contingency money

Project Reporting Schedule 2006 Final Report: 2002–2005 data 2009 Report sampling results and reinterpret existing data Item #7