Sources Pathways and Loadings Workgroup

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Three Steps To Graphical Analysis Graphs are one of the tools of the trade for Physicists. There are three basic things you can do with a graph. 1. You.
BA, Secondary Port Practice, April, 14, : 1115 / 1130 : 1215
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
OPTN Modifications to Heart Allocation Policy Implemented July 12, 2006 Changed the allocation order for medically urgent (Status 1A and 1B) patients Policy.
1 Small Tributaries Loadings Study #2: Zone 4 Line A, Cabot Blvd. Hayward Year 3 – Proposed Analyses Lester McKee Sources Pathways and Loadings Workgroup.
Mallard Island Large Rivers Loading: Monitoring WY 2010 Nicole David Sources, Pathway, and Loading Work Group May 27, 2009 Item #4.
1 Small Tributaries Loading Study #2: Zone 4 Line A, Cabot Blvd. Hayward Lester McKee Sources Pathways and Loadings Workgroup May 22 nd 2007 Item #5b San.
Zone 4 Line A Preliminary Suspended Sediment Load Estimates HY08 Rand Eads RiverMetrics LLC Sources.
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
1 PCBs and PBDEs on the Guadalupe River WYs 2003 – 2006 John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings Workgroup November.
San Francisco Estuary Institute Small Tributaries Loading Study #2 Zone 4 Line A, Cabot Blvd. Hayward Year 2 – Draft Data To-date Sources Pathways and.
1 Trace element loads in urbanized watersheds and the potential for treatment of NPS loads Lester McKee Sources Pathways and Loadings Workgroup May 22.
1 Small Tributaries Loading Study #2: Zone 4 Line A, Cabot Blvd. Hayward Lester McKee Sources Pathways and Loadings Workgroup December 12 th 2007 Item.
1 PCB and PBDE loads at Mallard Island on the Sacramento River: WYs John Oram, Jon Leatherbarrow, and Lester McKee Sources Pathways and Loadings.
RMP Program Objectives & Management Questions Question 3: Describe sources, pathways, loadings, and processes leading to pollutant-related impairment in.
Starting a New Small Tributaries Loads Study WY 2007: Zone 4 Line A - Progress to-date Lester McKee and Rand Eads Sources Pathways and Loadings Workgroup.
1 Guadalupe Small Tributaries Loads Study WYs (PCBs and PBDEs) John Oram and Lester McKee Sources Pathways and Loadings Workgroup November 13 th.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 2008 Lester McKee 1, Alicia Gilbreath.
Mallard Island and the Largest Flood Event Since 1997 Nicole David Lester McKee San Francisco Estuary Institute.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
Population Change: 2005 versus 2004 More than 2% 1% to 2% 0% to 1% Less than 0% US: 0.94%
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Break Time Remaining 10:00.
SWTTail Season Conjunctions 1 UCB, Dec THEMIS SCIENCE WORKING TEAM MEETING Tail 1 Conjunctions Sabine Frey University of California - Berkeley.
Equations, Tables and Graphs Graphing Activity. Warm UP xy InputOutput Determine if the following relations are functions.
Oil & Gas Final Sample Analysis April 27, Background Information TXU ED provided a list of ESI IDs with SIC codes indicating Oil & Gas (8,583)
15. Oktober Oktober Oktober 2012.
We are learning how to read the 24 hour clock
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
SIMOCODE-DP Software.
Edwards Aquifer Forecasts for 2014 Jim Winterle—EAA modeling supervisor HCP Stakeholder Committee May 28,
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
Riding the Storm Out Bruce Vandal, Education Commission of the States September 20, 2012.
25 seconds left…...
: 3 00.
5 minutes.
Equations of Circles. Equation of a Circle The center of a circle is given by (h, k) The radius of a circle is given by r The equation of a circle in.
Week 1.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Castro Valley Creek Stormwater Quality Monitoring Brake Pad Partnership Meeting June 22, 2005.
1 Regional Data Review : What have we learned in eight years? Lester McKee Sources Pathways and Loadings Workgroup Monday December 8 th 2008 San Francisco.
1 Zone 4 Line A Rand Eads RiverMetrics LLC Sources Pathways and Loadings Workgroup May 14, 2008.
San Francisco Estuary Institute Small Tributaries Loading Study Zone 4 Line A Sources Pathways and Loadings Workgroup May 6 th 2010 Rand Eads RiverMetrics.
1 Optimizing sampling methods for pollutant loads and trends in San Francisco Bay urban stormwater monitoring Aroon Melwani, Michelle Lent, Ben Greenfield,
Presentation transcript:

Sources Pathways and Loadings Workgroup Item #3a Zone 4 Line A Sources Pathways and Loadings Workgroup December 12, 2007 Rand Eads RiverMetrics LLC www.rivermetrics.com rivermetrics@gmail.com 503-435-7516

Location – Cabot Blvd, Hayward Item #3a

Zone 4 Line A Instrumentation Boom Stage Sensor Housing Campbell Data logger TTS Software Rain Gage Solar Panel ISCO Pumping Sampler Boom Stage Sensor Housing Turbidity Sensor

Sampling Summary HY07 11/10/06 – 02/06/07 10-min. records Item #3a Sampling Summary HY07 11/10/06 – 02/06/07 10-min. records 02/06/07 – 04/30/07 5-min. records Season rainfall 10.38 inches Max stage 3.02 ft., Max Q 308 cfs 21 storms identified 120 SSC samples collected, 84 analyzed Highest est. SSC = 3,463 mg/L, highest measured SSC = 2,744 mg/L

Item #3a

Item #3a

Item #3a

Item #3a

Item #3a

Item #3a

Item #3a Storm 4

Item #3a Storm 4

Item #3a

Item #3a

Item #3a Storm 20

Item #3a Storm 20

Item #3a

Item #3a

Item #3a