TYNDP 2013-2022 SJWS #3 Demand TYNDP 2013-2022 – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
University College London Complex Built Environment Systems Bartlett School of Graduate Studies 1 Using ESDS data for Energy and Environment Modelling.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, November 2008.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
Concept of Data Collection Vincent Scherrer Junior Adviser, System Development ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
Ort, Datum Autor UNFCCC General and cross-cutting issues - summary of the discussions - Workshop on emissions projection Bonn, Germany 6-8 September 2004.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
M ICHIGAN P UBLIC S ERVICE C OMMISSION Transformation of the Electric Power Industry: Value of Regulatory Impact Assessments Greg R. White Commissioner.
Cost-Benefit Analysis Modelling: indicators & Monetization TYNDP/CBA SJWS 6 – 13 May 2014.
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
Market Integration & SoS Initial proposals for SJWS #5 ENTSOG offices – Brussels Stakeholder Joint Working Session – 20 March 2012.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
TA Project: “Improving Emissions Control” Session 2 Scenarios for Emissions Management Dr Russell C Frost Project Team Leader.
TYNDP SJWS #1 Infrastructure Projects -- Supply & Demand TYNDP st SJWS 24 January 2012 ENTSOG offices -- Brussels.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
TYNDP SJWS #2 Security of Supply – Market Integration TYNDP – 2 nd SJWS 15 February 2012 ENTSOG offices -- Brussels.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
Generation Portfolio Options Study Philip O’Donnell Manager, Generation Analysis 14 October 2009.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
TYNDP concept SJWS #7 – conclusion on TYNDP concept TYNDP Stakeholder Joint Working Session – 29 May 2012.
TYNDP SJWS #5 Demand & Supply – Infrastructure Projects TYNDP – 5 th SJWS 20 April 2012 ENTSOG offices -- Brussels.
EIONET E NERGY M EETING Renewable energy in Europe – Technical Report Mihai Tomescu Project Manager – Energy ACC3, EEA 05 March 2016.
1 Global Wind Figures Global Wind Energy Outlook 2006 Source: GWEC The Scenarios – Main Assumptions “Reference” scenario: most conservative scenario,
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Alaa Alhamwi, David Kleinhans, Stefan Weitemeyer, Thomas Vogt 3rd European Energy Conference - E2C 2013 October 29 th, 2013 Optimal Mix of Renewable Power.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 ERGEG Opinion on the ENTSO-E pilot TYNDP.
Cost-Benefit Analysis Economic Performance Indicators TYNDP/CBA SJWS 6 – 13 May 2014.
Comparison of GHG mitigation efforts between Annex 1 countries Markus Amann International Institute for Applied Systems Analysis (IIASA)
Workshop on Energy-related National and EU-Wide Projections of Greenhouse Gas Emissions 27 to 28 februari 2002 Emissions of CO 2 from the energy sector.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Transparency Platform Project introduction Panagiotis Panousos Business Area Manager, System Operation ENTSOG’s Transparency Workshop Brussels – 11 September.
CO 2 emissions on a quarterly basis Maarten van Rossum and Sjoerd Schenau Presented by Ellen Brinksma.
Renewable Energy Statistics Keep-on-Track! 1 st Policy Workshop 23 January
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
CAFE Baseline dissemination workshop 27/09/2004 Dr. Leonidas Mantzos E3M-LAB/ICCS NTUA contact: Energy projections as input to the.
Implementation of the CHP Directive - overview and outlook Talking competitiveness! New perspectives for CHP/DHC EHP Annual Conference Brussels
European Ten Year Network Development Statement Volker Schippers GTE+ Senior Adviser GTE+ Workshop on GTE+ Work Programme 24 June 2008.
HIGH LEVEL FORUM “SECURITY OF ELECTRICITY SUPPLY IN KOSOVO” ENERGY POLICY FRAMEWORK IN KOSOVO LUAN MORINA, HEAD OF DEPARTMENT FOR ENERGY PRISHTINA, MARCH,01,2016.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
Workshop on the Criteria to establish projections scenarios Sectoral projection guidance: industrial processes Mario Contaldi, TASK-GHG Emanuele Peschi,
SLED Electricity Modelling results – Serbia László Szabó, András Mezősi
Workshop on the Criteria to establish projections scenarios Sectoral projection guidance: Residential and services Mario Contaldi, TASK-GHG Emanuele Peschi,
| Paul Lucas 1 Future energy system challenges for Africa: Insights from Integrated Assessment Models 1 st Africa Sustainable Development Forum.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Dr. Benoît ESNAULT (CRE) and Dr. Stefanie NEVELING (BNetzA)
CLIMATE CHANGE POLICY SCENARIOS - BULGARIA
Gas Regional Investment Plans
Brussels, 29th April 2009 Presentation by Martin Altstätter
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Peak demand Cases Peak case #1 Peak case #2 Peak case #3
Incentives for electricity infrastructure – ERGEG view
Contact: Third stakeholder meeting on CAFE Baseline 30 April 2004 Issues related to the energy baseline Dr. L. Mantzos, M. Zeka-Paschou.
Projects of Common Interest
SUMMER OUTLOOKS 2019 Lea Dehaudt, Moderator ENTSO-E
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Projects of Common Interest
Presentation transcript:

TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels

TYNDP Feedback 2 Climatic criteria and alternatives > Seasonal scenarios are more meaningful than yearly ones > Additional top-down scenarios considering macro-economic indicators (population, GDP) the implementation of environmental and energy policy and alternative fuel mixes > Impact of intermittent renewable power generation on gas demand > Inclusion of third-countries as Norway and Turkey > Higher transparency on the (individual) TSO’s underlying assumptions > Consistent TSOs’ underlying assumptions Comparative approach with other outlooks > Coordination with ENTSO-E needs to be ensured > Other outlooks could be also used in the modelled scenarios > Analysis would have to be developed in order to check the consistency with renewable energy on a country-specific basis

Previous Discussion TYNDP > Current report covers: Demand scenario coming from TSOs (best estimates) An Average Daily Demand A High Daily Demand (1-in-20 in most countries) Annual demand scenarios coming from Eurogas, IEA and Primes An Average Daily Demand > Only TSOs and Primes scenarios provide data on a country basis SJWS#1 Input > ENTSOG should introduce an additional demand scenario based on MSs’ demand forecasts > A list of criteria should be defined for consideration by TSOs when forecasting demand, incl. a check list for national Renewables Action Plans (NREAPs) > Transparency of assumptions and the origin of the forecast may be more important than a common set of criteria > It is necessary to combine bottom-up and top-down approach 3

Improvement directions 1. Upgrade the consistency and transparency in the assumptions and methodologies 2. Attention to power generation dynamics: link between electricity and gas systems 3. Consideration of the EU political goals 4

Scenario > A demand scenario defines the gas demand evolution during the forecasting horizon, consequence of the assumptions taken for a certain number of variables explaining the environment on which, the gas demand is evolving. A demand scenario may include one or several demand cases. Case > A demand case defines the gas demand level on a temporary basis (yearly, seasonal, daily, …). Different daily demands under different conditions (temperature, working day….) are demand cases under a single demand scenario. 5 Demand Scenario vs. Demand Case

6 Definition of Scenarios and Cases Consistency and transparency in the defined scenarios > The TSOs bottom-up scenario will be the main demand scenario considered in TYNDP. > The clarification of the underlying assumptions in the TSOs demand forecasts has been identified as the feasible improvement target. It’s possible extent and level of detail is being analysed, and will be discussed in following SJWSs. > Other demand issues that will be investigated and further discussed in the future are: The introduction of additional top-down scenarios The collection and inclusion of the gas demands projected in the NREAPs. Definition of demand cases > The implementation of the consistency and transparency targets may be approached through the definition of demand cases under harmonized levels of risk.

7 High daily (peak) Cases The high daily demand in TYNDP > The EU high daily demand forecast has been limited to the aggregation of the high daily demand level for each country. > These high daily demand levels are estimated by TSO under different risk levels according to the national standards. > These values define the network requirements in terms of transmission capacity determining the network development needs. Therefore have to be understood as the most influential value of any TSO’s demand estimations. The perceived lack of consistency > The diverse levels of risk – defined under national standards – may have induced the perception of lack of consistency. > The demand figures in TYNDP should be consistent with the demand figures used in the national plans  The determination of consistent demand cases will be done in addition and will not replace the demand level defined under the national standards.

8 High daily (peak) Cases Simultaneity of occurrence > A priori, assuming the simultaneous occurrence of the peak demand in every country may seem an unrealistic scenario. > A deeper analysis of the gas demand simultaneity will be required. Gas Demand for power generation > The gas demand for power generation must be treated independently. > Consistency is required between ENTSOE’s and ENTSOG’s TYNDPs. > Electricity generation scenarios > Installed capacities of gas fired power generation facilities > The installed capacities ma give an idea of the potential gas consumption of the power generation facilities, but it will be probably far from the expected peak demand consumptions. > The analysis of electricity generation scenarios is out of the scope of gas TSOs

9 High daily (peak) Cases > A complete approach of the high daily demand will have to track: > consistency between the figures in TYNDP and National Plans > consistency between the figures from different countries > consistency with the electricity TYNDP > the lack of simultaneity in the occurrence of the high daily demands

10 High daily (peak) Cases DC: Design Case > The design case is the high level of demand calculated according to the national standards that is used by TSO’s to assess the network capacities and needs of development. The design case is the high daily demand considered in the national plans. It is disaggregated between gas for power generation, and gas demand for other uses. UP: Undiversified Peak > The undiversified peak is the high level of demand calculated by TSOs under a harmonized level of risk, following a common methodology – when possible. This demand case considers the simultaneous occurrence of the so calculated high level of demand in every country. DP: Diversified Peak > The diversified peak is a demand case derived from the UP level. In the diversified peak the lack of simultaneity in the occurrence of the high levels of demand mitigates the demand peak.

11 Average Seasonal Cases > In TYNDP , the average daily demand (1-in-2) was the scenario in which the Market Integration was assessed. > A better description of the system behaviour under normal conditions, could increase the significance of the results. > The replacement of this figure by the average winter and average summer days reflecting the seasonal swing may favour the representativeness of the figures. Average daily demand Winter average Summer average

12 Thank You for Your Attention ENTSOG -- European Network of Transmission System Operators for Gas Avenue de Cortenbergh 100, B-1000 Brussels T: WWW: