Continuation of the analysis of the proposed program-budget for 2014.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Chapter 06: Mortgages: Additional Concepts, Analysis, and Applications
2005/2006 Cornwall Central School District Budget Re-Vote Tuesday, June 14, 2005 At CCMS 6:00 a.m. to 9:00 p.m.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
/ /17 32/ / /
The nominal average wage for non-supervisory workers in the U.S. in 1975 was $4.87 per hour In 2011 dollars, thats $20.16 per hour Todays nominal average.
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 29.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 101.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
1 PROPOSED PROGRAM-BUDGET FOR 2012 Overview and Guide August 26, 2011 Presentation for CAAP.
PROPOSED PROGRAM-BUDGET FOR 2014
Consideration of scenarios for 2014 Program-Budget Ceiling Secretariat for Administration and Finance April 2013.
Analysis - Proposed Program-Budget for 2014 Non-personnel costs:
Proposed Program-Budget for To request the Secretary General that the proposed program-budget for 2014, reflect a proportional across-the-board.
1 PROPOSED PROGRAM-BUDGET FOR 2011 Overview and Guide August 13, 2010 Presentation for CAAP.
1 OAS Financial Management Challenges and Program- Budget Implications 1 SECRETARIAT FOR ADMINISTRATION AND FINANCE October 2008.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Student Loans Someday you might want to earn a college degree, buy a car, or purchase a home. A loan can help you reach those goals. Why might you consider.
Summative Math Test Algebra (28%) Geometry (29%)
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
Tenths and Hundredths.
R + Hadoop = big data analytics Antonio Piccolboni Revolution Analytics.
$100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400 $100 $200 $300 $400.
Job Order and Process Costing
Break Time Remaining 10:00.
The basics for simulations
First Experimental Tests 08/04/20141/18. First Experimental Tests Temperature sensors 08/04/20142/18.
The Camo Bots Hiding Since Team Members Mr. Brian Landry - Advisor Mr. Patrick Farley - Advisor Mr. Marty OHora - Advisor Doug Yatsonsky.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
Solutions to Section 7.1. Prob#Billing Date Previous Balance Finance Charge New Purchases Payments Credits New Balance 38/15$ 600$ 9$ 140$ 100$ /22$
We are learning how to read the 24 hour clock
Your benefits are a reflection of you.
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
Dassel-Cokato Schools 2013 School Support Levy November 5, 2013.
YearMembershipOverall Budget% of Budget Fee Revenue 92-93$186, $142, $162, $146,000$2,800, $155,000$2,500, $
Before Between After.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Subtraction: Adding UP
: 3 00.
5 minutes.
Static Equilibrium; Elasticity and Fracture
ANALYTICAL GEOMETRY ONE MARK QUESTIONS PREPARED BY:
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Vorstand FB Tarif industriAll-Europe, Basic Metals Committee, Luxembourg, Collective Agreements of the European Steel Industry.
Solanco School District Preliminary Budget April 28, 2014.
Doc.: IEEE /0333r2 Submission July 2014 TGaj Editor Report for CC12 Jiamin Chen, HuaweiSlide 1 Date: Author:
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Analysis of the 4th Quarterly Report for 2014 Financial information Regular Fund and specific funds.
Analysis of the Proposed Program- Budget of the Organization for 2016 Working Group to Conduct the Technical Review of the Program-Budget October 28, 2015.
Analysis of the First Semester Resource Management and Performance Report January 1 to June 30, 2016.
Presentation transcript:

Continuation of the analysis of the proposed program-budget for 2014

Scenario mandated by the Permanent Council Difference of 535,900

Non-Personnel Expenses Considerations: Ceiling of 29,556.7 Determining a factor for applying a proportional reduction to each subprogram based on 2013 values. Of the amount approved in 2013 for building maintenance, 500,000 is deducted to repay the loan for remodeling the building. Securing funds to offset the impact of statutory adjustments under the "Pensions and Health Insurance" category, equivalent to 133,000 for Of the remaining amounts, funds from Chapter 12 "Conferences and Meetings" will have to be reassigned for REMJA, Multidimensional Security, CIDI, and CITEL, as well as for special Assembly sessions, and for PC and CIDI committees, with a corresponding reduction in unscheduled meetings. As stated by the SG, make transfer for repayment of the loan to the Fellowships Capital Fund.

ADJUSTMENT FACTOR 3.140% Office of the SG Summits Protocol Legal Services Office of the ASG Office of the GA, MC, and PC Columbus Library Int. Am. Court of HR2, ,577.42,598.4 IACHR1, CIM IIN Inter-Am. Juridical Committee IADB1, ,119.71,115.7 PADF Legal Affairs Dept. of International Law Dept. of Legal Cooperation PROGRAM2013 SCENARIO 1 TOTAL2014

ADJUSTMENT FACTOR 3.140% Multidimensional Security CICAD CICTE Dept. of Public Security Political Affairs SPA Administrative Section0.0 Dept. of Electoral Coop. and Obs Dept. of Sustainable Democracy Dept. Effective Public Management Personnel adjustment0.0 Integral Development SEDI Administrative Section0.0 Dept. Econ. & Social Development Dept. Sustainable Development Dept. Human Dev., Educ. & Cult5, ,300.24,310.9 CIDI Meetings (ministerial) CITEL CIP CITEL Meetings CIDI Meetings Personnel adjustment0.0 PROGRAM2013 SCENARIO 1 TOTAL2014

ADJUSTMEN T FACTOR 3.140% Conferences and Meetings1, , General Assembly Unscheduled meetings Permanent Council Preparatory Committee General Committee CAJP CSH CAAP Special Assembly sessions CISC Offices in member states YABT REMJA and CICAD meetings80.0 Inspector General Board of External Auditors TOTAL30,846.71, , ,020.8 SCENARIO 1 TOTAL2014 PROGRAM2013