Cavity BPMs for Happex and G0 John Musson. Triplet Configuration…X, Y, and I TM 010 Mode for I TM 110 Mode for X & Y –Slugs provide proper excitation,

Slides:



Advertisements
Similar presentations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Advertisements

Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
D. Wei, Y. Huang, B. Garlepp and J. Hein
The World Leader in High-Performance Signal Processing Solutions 1.ADCs - Ping-Pong Architectures 2.ADCs – Driving Them 3.DACs – Sinc Compensation 4.DACs.
Antonin Vacheret DAPNIA/SPhN, CEA Saclay.HAPPEX II Jlab Hall A Electron detectors for HAPPEX2 and He Installation in HRS Linearity tests 4.
Source Outlook High polarization strained-layer photocathodes were activated in both electron guns during the summer shutdown, with usual QE (0.2% at 850.
Beam Monitors Info from John Musson on new cavity receivers Other monitor issues.
Measurements and Their Uncertainty 3.1
Time-of-flight measurement of ion energy Tim Freegarde Dipartimento di Fisica Università di Trento Italy.
Who Wants To Be A Millionaire?
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Introduction to Electronic Circuit Design
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
ECE 495: Integrated System Design I
The basics for simulations
DAM-Île de France Département Analyse, Surveillance, Environnement 06/06/2014 DIF/DASE/B.ALCOVERRO 1 INFRASOUND SENSOR CALIBRATION DEVICE 13/11/2001 Infrasound.
Briana B. Morrison Adapted from William Collins
HINS BPM Overview N. Eddy For Instrumentation Dept.
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
April 28th, 2011Timing Workshop, Chicago Paul Scherrer Institute Limiting factors in Switched Capacitor Arrays Sampling speed, Timing accuracy, Readout.
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Before Between After.
Subtraction: Adding UP
QR026 High Sensitivity VME Tuner Performance Data
Partial Products. Category 1 1 x 3-digit problems.
Interfacing to the Analog World
// RF Transceiver Design Condensed course for 3TU students Peter Baltus Eindhoven University of Technology Department of Electrical Engineering
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Lumi Analysis for HAPPEx III / PREX Presented by: Luis Mercado UMass - Amherst 5/18/2007.
Copyright 2001, Agrawal & BushnellVLSI Test: Lecture 261 Lecture 26 Logic BIST Architectures n Motivation n Built-in Logic Block Observer (BILBO) n Test.
Lorentz force detuning measurements on the CEA cavity
PEDM Review 12/7/091 Beam Position Monitors William Morse.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
TRIUMF Qweak Electronics Des Ramsay Nov Status of Electronics November, 2008  36 VME modules (# 001 and # ) delivered to JLab  001, 003,
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Chris Parkes for VELO software Group VELO Software Overview & Shutdown Planning Organisation Milestones 3 Critical Areas.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Frank Ludwig, DESY Content : 1 Stability requirements on phase and amplitude 2 Available technologies and selection of the detector concept 3 Proposed.
G2p/GEp Beamline Tim Michalski Project Lead. Beamline Overview Slow Raster Tungsten Calorimeter Upside Down Girder (correctors, BCM, superharp) FZ1 Magnet.
Measurement opportunities with the LHC transverse damper W. Hofle, D. Valuch.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
PADS Power Aware Distributed Systems Architecture Approaches USC Information Sciences Institute Brian Schott, Bob Parker UCLA Mani Srivastava Rockwell.
Real-time Acquisition and Processing of Data from the GMRT Pulsar Back- ends Ramchandra M. Dabade (VNIT, Nagpur) Guided By, Yashwant Gupta.
Future FONT BPM Processors C.Perry 25 June Types of Processor Two types of processor: a) present mixer type b) baseband type Both will be made because:
Frank Ludwig, DESY Content : 1 Stability requirements for phase and amplitude for the XFEL 2 Next LLRF system for optimized detector operation 3 Limitations.
Alexei SemenovGeneric Digitizer Generic Digitizer 10MHZ 16 bit 6U VME Board.
CORDIC Algorithm COordinate Rotation DIgital Computer Method for Elementary Function Evaluation (e.g., sin(z), cos(z), tan -1 (y)) Originally Used for.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
HAPPEX DAQ / ADC Tests Luis Mercado UMASS 4/17/09.
CORDIC Algorithm COordinate Rotation DIgital Computer
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
R. Michaels, JLab PREX Mtg, July 2008 Recent Cavity Monitor Tests Credit: John Musson, Anna Boehle, Vince Sulkosky Good position & current for 10 nA to.
CI Lecture Series Summer 2010 An Overview of IQ Modulation and Demodulation Techniques for Cavity LLRF Control.
Firmware Update 29/03/2017 Rebecca Ramjiawan.
A Software Defined Radio for the Masses, Part 4
Low Level RF Status Outline LLRF controls system overview
Feedback Systems Joe Grames Hall A Parity Meeting Jefferson Lab
Low Level RF Status Outline LLRF controls system overview
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Trent Allison Ops StayTreat 2015
BCM test in low current for g2p
Undulator Cavity BPM Status
Breakout Session SC3 – Undulator
Presentation transcript:

Cavity BPMs for Happex and G0 John Musson

Triplet Configuration…X, Y, and I TM 010 Mode for I TM 110 Mode for X & Y –Slugs provide proper excitation, reducing TM010 x-talk –Nominal output: 54nV-uA/um (-132 dBm)…per MAFIA simulations

Cavity Response ___________________ Courtesy Jürgen Schreiber, ECFA/DESY LC workshop, Amsterdam, April 1-4, 2003

I & Q Demodulation I Q DE- MO D 28 Msps ADC 70 MHz LO 90 Degree I & Q 56 Msps ADC COUNTE R RE G ADC70 MHz LO 56 Msps System Clock 14-Bit 2s Complement RE G 28 Msps = +I+Q-I-Q+I+Q-I-Q+I+Q-I-Q+I+Q-I-Q+I+Q-I-Q+I+Q

Receiver

Functional Description

Receiver Parameters Noise Floor: -91 dBm (200 uV) –3690 uA-um per shot (per cavity simulation) Bandwidth = 100 kHz Processing Gain = 6MSPS/100 kHz = 18 dB Best-case Resolution at 50 uA ~ 9 um (at full BW) Additional Integration Gain (16ms): 32 dB DAC Output BW ~ 75 kHz (200 ksps) Calculated resolution for Eff = 50 %: 0.7 um –Hoping for 1 um

EPICS Interface

Happex Run BCM Crosstalk Helicity-correlated position differences, vs stripline,1nm Resolution BCM DD Glitches BCM Linearity Helicity-correlated position difference. xtalk Same plot, better data!

Happex Run Bad News….. Limited Dynamic Range –Required external amps and filters Crosstalk…~45 dB of C-C isolation –BCM signal would corrupt X & Y Software Problems –Register overflow resulted in glitching and Bedposts Synchronous Detection => Dedicated MO –Phase noise and distribution issues (LOL) Data COURTESY l. Kaufman, K. Paschke, R. Michaels

In Addition Setup is a learned behavior! –We devised a procedure, which proved to be more difficult than expected with actual beam. Hall personnel eagerly participated….. –More eyes –Technical understanding of benefits and limitations –Fantastic model for future systems

G0 Improvements Hardware –Crosstalk path identified. IF traps installed on Local Oscillator lines => > 60 dB –Amplifier removed from BCM (I) channel –Additional bench testing to understand Software –Register rollover identified, corrected, and tested. MO –Try asynchronous operation, due to large Phase Noise in Halls Hall personnel also system-savvy! –Data courtesy R. Suleiman

G0 Data

Non-Linear Behavior

Double Bounce at Zero X-ing

Glitching

Known Improvements 50 nA Sensitivity –Currently have 74 mm resolution! Need additional 37 dB to achieve 1 mm. LNA? –I-cavity is not a problem…plenty of signal Shore up all hardware fixes (ie. LO-IF traps) Firmware and Additional tests. Setup Procedure (EPICS) and All-Save Return to Synchronous MO –Must improve MO Distribution to Hall(s) Cavity Investigation on Downstream X&Y –How can we duplicate beam+cavity behavior in the lab? Thank you to all for data, feedback, and especially patience!

CORDIC Algorithm COordinate Rotation DIgital Computer –Jack E. Volder, The CORDIC Trigonometric Computing Technique, IRE Transactions on Electronic Computers, September 1959 –Ray Andraka, A Survey of CORDIC Algorithms for FPGA Based Computers, FPGA '98. Proceedings of the 1998 ACM/SIGDA sixth international symposium on Field programmable gate arrays, Feb , 1998, Monterey, CA. pp Iterative method for determining magnitude and phase angle –Avoids multiplication and division N bits +1 clock cycles per sample Can also be used for vectoring and linear functions (eg. y = mx + b)

Concept Exploits the similarity between 45 o, 22.5 o, o, etc. and Arctan of 0.5, 0.25, 0.125, etc. Multiplies are reduced to shift-and-add operations AngleTan ( )Nearest 2 -N Atan ( )

Y X Binary search, linked to sgn(Y) Successively add angles to produce unique angle vector Resultant lies on X (real) axis Functionally..... with a residual gain of 1.6