Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010.

Slides:



Advertisements
Similar presentations
Hall D Level 1 Trigger Dave Doughty 8/5/03 Hall D Collaboration Meeting.
Advertisements

Technische Universität München A digital calorimetric trigger for the COMPASS experiment at CERN Markus Krämer J. Friedrich, S. Huber, B. Ketzer, I. Konorov,
Update on GEM Activities for the 12 GeV Program in Hall A at JLab
1 JParc-K DAQ System Mircea Bogdan December 9-10, 2006.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
12 GeV Trigger Workshop Session II - DAQ System July 8th, 2009 – Christopher Newport Univ. David Abbott.
EIC Workshop 21 May 2008 Experience with high trigger R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division Topics Cebaf’s Large.
Trigger-less and reconfigurable data acquisition system for J-PET
A N DY Trigger and DAQ System A N DY Review Chris Perkins UC Berkeley/Space Sciences Laboratory Stony Brook University 11/08/2011.
1.Status update from May 2011  FADC250 and Trigger modules  Two crate testing success 2.Schedule  How about those requirements?  What’s happened since.
Outline Experiments Setup and DAQ configuration Fastbus for SBS: performance and status GEn/GMn - trigger and DAQ GEp - trigger and DAQ GEM readout Outline.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
The CMS Level-1 Trigger System Dave Newbold, University of Bristol On behalf of the CMS collaboration.
 Brief status update of DAQ/Trigger production hardware  Firmware development for HPS application  CLAS12 CTP ‘upgrade’ notes  Summary Status of the.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
SBS meeting VETROC application for Cerenkov triggering Alexandre Camsonne March 18 th 2015.
David Abbott CODA3 - DAQ and Electronics Development for the 12 GeV Upgrade.
DAQ Issues for the 12 GeV Upgrade CODA 3. A Modest Proposal…  Replace aging technologies  Run Control  Tcl-Based DAQ components  mSQL  Hall D Requirements.
Data Acquisition for the 12 GeV Upgrade CODA 3. The good news…  There is a group dedicated to development and support of data acquisition at Jefferson.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
1 Trigger and DAQ for SoLID SIDIS Programs Yi Qiang Jefferson Lab for SoLID-SIDIS Collaboration Meeting 3/25/2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
SuperBigbite DAQ and Trigger electronics Alexandre Camsonne Hall A Jefferson Laboratory SBS Review.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
APV25 Electronics for GEMs at UVa and for the 12 GeV Upgrade Program in HallA at JLab RD51 Electronic School, February 3-5, 2014 Kondo Gnanvo University.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Vladimir Zhulanov for BelleII ECL group Budker INP, Novosibirsk INSTR2014, Novosibirsk 2014/02/28 1.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Counting Mode DAQ for Compton
CMS EMU TRIGGER ELECTRONICS
JLAB Front-end and Trigger Electronics
Alexandre Camsonne August 27th 2016 SoLID collaboration meeting
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
Example of DAQ Trigger issues for the SoLID experiment
Hall D Trigger and Data Rates
LHCb Trigger, Online and related Electronics
Alexandre Camsonne January 12th 2016 SoLID collaboration meeting
SoLID DAQ for Transversity and PVDIS
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
PID meeting Mechanical implementation Electronics architecture
August 19th 2013 Alexandre Camsonne
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

Trigger & DAQ Ole Hansen SBS Collaboration Meeting 19 March 2010

GEp(5) Trigger Considerations Very high luminosity, L 8x10 38 cm -2 s -1 Very high luminosity, L 8x10 38 cm -2 s -1 Open detectors, large solid angle Open detectors, large solid angle Challenges Challenges: Trigger setup: Trigger setup: Trigger on calorimeter hits Trigger on calorimeter hits High calorimeter thresholds High calorimeter thresholds Coincidence of e-p angular correlations Coincidence of e-p angular correlations H(e,ep) elastic

GEp(5) Calorimeter Rates HCALECAL Electron rate estimate w/2.5 GeV threshold (85% of E elas ): 60 kHz (CDR section 5.1.7) Hadron rate estimate using SLAC & DESY data, Wiser code: w/4.5 GeV threshold: 1.5 MHz Background rate vs. cut on deposited energy (MC studies in progress) 5 kHz coincidence rate w/ 50 ns window 5 kHz coincidence rate w/ 50 ns window NB: Good resolution 8%/ E 8%/ E

e-p Kinematic Correlation 10 x 20 HCAL blocks 20 x 76 ECAL blocks (CDR section F.3)

Calorimeter Sums 10 x 20 HCAL blocks 20 x 76 ECAL blocks (CDR section F.3) sum-32 4x37 = 148 sum-32 7x17 = 119 sum-16 sum-16

Calorimeter Sectioning HCAL sums of 16: 7x17 = 119 ECAL sums of 32: 4x37 = 148 (CDR section F.3) 7x7 4x10 4x9

Calorimeter Sectioning HCAL sums of 16: 7x17 = 119 ECAL sums of 32: 4x37 = 148 (CDR section F.3) Rate reduction: x5 correlate (40)

ECAL Sums x5 sum-8 to ADCs 3333 to other Electronics exists (used with BigCal in Hall C) 148 x sum-32

HCAL Sums 12-bit pipelined FADCs CPUCPU TITI SMARTTRIGSMARTTRIG x16 x8 x200 16x8 bits/16 ns = 8 Gb/s per FADC (!) x(7x7) = 196 sum-16 logic signals x196

SMART Trigger Module VME Deserializer 13 x 8 Gb/s 2 kB SRAM FIFO FPGA 64 x 8-bit sums & discriminators VERY PRELIMINARY FPGA 64 x 8-bit sums & discriminators Digital Out to coinc. FPGAs Fan-out 192 est. processing time ns

L2 Coincidence Logic For each calorimeter section (4x): CAEN 1495 FPGA VME module (160 inputs) 50 ns latency VME 36 (40) x ECAL sum-32 Smart HCAL sum, 1 µs latency 49 x HCAL sum-16 To L2 trigger OR 1 µs variable delay L1 trigger

Two-Level Trigger Level 1 Level 1 –100 ns latency –Generated by electron arm (60 kHz rate) –Gate for Fastbus & non-pipelined VME Level 2 Level 2 –Assume up to 1 μs latency –FPGA-based coincidence logic –1 kHz physics rate –Fast Clear FB & VME after L2 timeout < 10% DT

DAQ Requirements Data rate driven by Trackers: (assuming 2 bytes/channel – 7 bits address, 9 bits data) Data rate driven by Trackers: (assuming 2 bytes/channel – 7 bits address, 9 bits data) Other detectors, contingency, … design for 100 MB/s data rate Other detectors, contingency, … design for 100 MB/s data rate

12 GeV Upgrade Electronics Under development by JLab DAQ group Under development by JLab DAQ group Fully pipelined Fully pipelined 200 kHz L1 trigger rate capability 200 kHz L1 trigger rate capability Synchronous trigger distribution, 250 MHz ref. clock Synchronous trigger distribution, 250 MHz ref. clock VME64x front-end crates with support for VME64x front-end crates with support for –High-speed readout modes (2eVME, 2eSST) up to 200 MB/s –On-module event buffering - up to 200 events –Gigabit uplinks to event builder CODA 3 software CODA 3 software Will use some of this technology + custom modules Will use some of this technology + custom modules

Future Front Ends (graphics from Dave Abbott) Trigger Interface (TI) CODA 2 & 3 support FADCF1TDC CPU: Intel or Motorola Linux or vxWorks Dual GigE >200 MB/s CODA 2 & 3 ROC Clock/Trigger Signal Distribution (SD) Crate Trigger Processor (CTP) (optional) VME64x/VXS Crate Trigger & Clock (via fiber) Data (via Gigabit Ethernet)

Hall A Data Path ROC Gigabit Switch ADAQL Event Builder 1x (or 2x) GigE

Trigger & DAQ Responsibilities New Hampshire New Hampshire –ECAL analog calorimeter summing logic Rutgers Rutgers –CAEN v1495 coincidence logic INFN Rome & Genova INFN Rome & Genova –GEM readout electronics & DAQ interface Jefferson Lab Jefferson Lab –HCAL digital summing electronics –DAQ setup Norfolk State Norfolk State –2 nd and 3 rd tracker front-end electronics

Near-Term Plans Test 10x10 cm 2 GEMs during PREX (spring 2010) Test 10x10 cm 2 GEMs during PREX (spring 2010) GEM VME readout prototypes expected ready in spring or summer 2010 (maybe for PREX) GEM VME readout prototypes expected ready in spring or summer 2010 (maybe for PREX) Ongoing tests & prototyping with CAEN v1495 FPGAs at Rutgers Ongoing tests & prototyping with CAEN v1495 FPGAs at Rutgers v1495 radiation hardness test during PREX v1495 radiation hardness test during PREX

CAEN 1495 FPGA Prototyping (Rutgers) Have 3 v1495s for Fermilab E906 Have 3 v1495s for Fermilab E906 Programming & testing of E906 trigger conditions (256 inputs) in progress Programming & testing of E906 trigger conditions (256 inputs) in progress Gaining experience with hardware and software Gaining experience with hardware and software

Summary GEp(5) Trigger requires some R&D GEp(5) Trigger requires some R&D –Digital summing logic for HCAL –FPGA coincidence logic Data Acquisition fairly challenging, but doable Data Acquisition fairly challenging, but doable –100 MB/s data up to 5 kHz trigger rate –12 GeV DAQ architecture, CODA 3 –Pipelined electronics –Custom modules First prototyping & testing underway First prototyping & testing underway