Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration.

Slides:



Advertisements
Similar presentations
Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Advertisements

Understanding the Three-Body Nuclear System: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia For the E Collaboration.
Polarized 3 He Target Lab Update Presented by Xiaohui Zhan MIT Hall A Collaboration Meeting, Dec. 14, 2007.
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
Design Items and Tasks for pol. 3 He Remain design items: Support structure Main support Tube/oven (90% complete) Temp. support in the target lab Target.
The Spin Structure of 3 He and the Neutron at Low Q 2 : A Measurement of the Extended GDH Integral Vincent Sulkosky (for the JLab Hall A Collaboration)
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Spectrometer Solenoid Report and Coupling Coil Update Michael S. Zisman MICE Operations Manager Center for Beam Physics Lawrence Berkeley National Laboratory.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
1 Zachary Wolf 1 Undulator Tuning Status June 9, 2009 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, D. Jensen,
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Polarized 3 He Target System Overview Design Vertical Polarization Spin-Flip Oven/Ladder/Enclosure/Access Laser/Optics/Cells Polarimetry Safety/Documents.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Yi Qiang Duke University for the Workshop on Hadron Physics in China and Opportunities with 12 GeV JLab July 31, /31/ Neutron Transversity.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
CMS FPIX Reinstallation/Commissioning Lorenzo Uplegger 4/20/091.
PIP Update April 30 th Agenda Summary Update – Current Activities/Updates – Nathan Eddy – Booster Longitudinal Damper.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
Jin Huang M.I.T. For Transversity Collaboration Meeting Sept 24, JLab.
COMPTON POLARIMETRY Collected data Cavity power Status on counting methods Systematic errors and hardware issues.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, August 15, 2012, JLab  Experiments and requirements  Target performance from previous experiments.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Considerations for the Optimal Polarization of 3 He Targets Brielin C. Brown University of Virginia October 10, 2008 SPIN 2008.
Jin Huang PhD Candidate, MIT For Hall A Collaboration Meeting June 10, JLab.
Thursday Lab Projects ELCT 201 Spring 2011 Laser Light Show Water Test Stand Automation MSD Automated Demonstration.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
CALVA : A test facility for Lock Acquisition F.Cavalier 1 on behalf of CALVA team : M.-A.Bizouard 1, V.Brisson 1, M.Davier 1, P.Hello 1, N.Leroy 1, N.Letendre.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
Spin Injection June 5, 2015 APEX Meeting H. Huang, P. Oddo, V. Ptitsyn.
The polarized target for G E n Gordon D. Cates, Jr. University of Virginia Professor of Physics and Radiology G E n, - October 24, 2003.
Jin Huang MIT For target group discussion. May 07 EPR/Pumping Chamber Pol. Table Updates May 03 First Gradient Model Fitting May 05 Review & Update on.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
COMPASS polarized target for Drell-Yan Michael Pesek Charles University in Prague On behalf of COMPASS PT group PSPT, Charlottesville, Virginia
Target tests 1 st – 2 nd Nov. Chris Booth Sheffield 7 th December 2006.
Shiuan-Hal,Shiu To-do-list and schedule 1. Things need to do before beam comes 2 Generate new trigger matrix for test beam base on the final geometry.(1)
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
1 COBRA Magnet Status W.Ootani MEG Experiment Review Meeting, Jul W.Ootani MEG Experiment Review Meeting, Jul
Target Lab. Update Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Transversity Collaboration.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
LIGO-G v1 Searching for Gravitational Waves from the Coalescence of High Mass Black Hole Binaries 2014 LIGO SURF Summer Seminar August 21 st, 2014.
Preliminary result of the target polarization 2004 Kaori Kondo COMPASS target team.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
E Research Update: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia for Jefferson Lab E Collaboration.
Transverse polarization for energy calibration at Z-peak M. Koratzinos With valuable input from Alain Blondel ICFA HF2014, Sunday, 12/10/2014.
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Hall A Collaboration Meeting Slide 0 Measurements of Target Single-Spin Asymmetries in QE 3 He ↑ (e, e’) Update of QE A y (E05-015) experiment.
SANE Magnet Review ● Repaired polarized target magnet was successfully energized and put in persistent mode on 12/18/08 after the review, following the.
ELENA installation and commissioning status
Radiation-safe area for electronics, or laser or
Overview of Polarized 3He Target
Undulator Tuning Status
Target Analysis for Transversity
Polarized 3He target installation
Polarized He3 Target Upgrade (Stage I) for A1n/d2n
Presentation transcript:

Polarized He-3 Target Progress Polarized He-3 Target Progress Chiranjib Dutta (UKY) Joe Katich (W&M) Xiaohui Zhan (MIT) Yi Qiang (DUKE) HALL A Collaboration Meeting Thursday, June 21 st 2007

OUTLINE (Work in our target lab.) Oven/Support structure Oven Test Laser Update Other related stuff Optics Software The real tests

Oven / Support structure Installed the new oven earlier. Installed the new heaters and RTDs UNFORTUNATELY, the structure was BROKEN near the bottom of the air flow tube GOOD NEWS===the oven is still safe and fine The new structure is being designed Waiting on it !!( supposed to be delivered now) Many thanks to Al and Susan

Few snaps :::: The GEn Tube The new oven Earlier broken portion

Oven Test Currently the old GEn air inlet and outlet pipe is being used The GEn air flow system installed Trying to heated up the oven. Successfully heat up to 240 deg. C More tests to be carried out next week to optimize

Laser Update 6 single FAP and 2 Duo FAP All tested and recalibrated One needs to be repaired and will be sent shortly GOOD NEWS :::: COHERENT decided to resume production

Other Aspects New pick up coils/stands ready Vertical coil support design completed and delivered Moving fixture design completed and delivered BB Field clamp design completed and ordered Exit beam line design mostly completed 6 hybrid cells already produced and on track with one in every couple of weeks

Optics New 5 to 1 combiners tested (qty=3) New 75 meter fibers (qty=10) tested ALL LOOK GOOD All of them to be installed in the Hall in summer The Optics line design to be worked on shortly 3 optics line:: Longitudinal,Transverse,Vertical Simulation is being done for the optics lines

Software Combine the spin-flip lab view code with NMR signal analysis and EPR measurement. 1. NMR frequency sweep signal can be extracted and fitted after every spin-flip. Provide quick & continuous cell polarization monitoring. 2. EPR measurement can be controlled automatically by spin-flip program during every spin-flip, also can be controlled manually without affecting the main program. 3. Add counter connected to FG to monitor the frequency sweep process which is crucial to spin-flip. Spin polarization status(+/-) can be monitored continuously by a TTL output signal of the FG together with ADC and scalar. The record of Labview can communicate with EPICS as a complementary method to check the spin status. All of the software programs will be fully tested after the installation.

Real Tests on list in next 3 months The oven is being tested Laser alignment NMR/EPR/SPIN FLIP to be tested All the new related softwares to be tested accordingly Water field and frequency sweep to be tried New vertical coil to be tested in the new lab BB field mapping with the new shielding before moved to HALL C

With 1. All instruments we need 2. All softwares ready 3. Oven working good 4. 3 students and 1 post doc working 5. All experts/experienced people around We will definitely be able to meet the deadline already set before and WE WILL BE READY by January 1st 2008 for installation Towards all four He-3 Experiments starting with TRANSVERSITY

Wolfgang Korsch Jian Ping Chen Todd Averett Jaideep Singh Aidan Kelleher Ameya Kolarkar Acknowledgement :::::::