Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.

Slides:



Advertisements
Similar presentations
Journées Instrumentation du GDR Nucléon 8-9 Avril 2008, CEA Saclay Polarized Positrons at the Jefferson Laboratory (i) Physics motivations (ii) Principe.
Advertisements

10/22/20101 Westar Formula Rate and your bill. 10/22/20102 What we will be going over Transferring the results from the Westar Formula Rate to the SPP.
Hall A collaboration meeting, January 4-5, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Hall A collaboration meeting, December 5-6, 2005, 1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas.
E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
Understanding the Three-Body Nuclear System: Asymmetry Measurements in Quasi-Elastic Ge Jin University of Virginia For the E Collaboration.
Hypernuclei, – N interaction Electroproduction of hypernuclei E experiment UPDATE Experimental equipment and setup Kaon identification RICH detector.
Hall A collaboration meeting, June 22-23, 2006, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Robert J. Feuerbach Jefferson Lab Constructed from contributions from the HAPPEX Collaboration Hall A Collaboration Meeting December 5, 2005 HAPPEX-II.
Hall A collaboration meeting, May 17-18, 2004, 1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas.
Study Neutron Spin Structure with a Solenoid Jian-ping Chen, Jefferson Lab Hall A Collaboration Meeting June 22-23, 2006 Inclusive DIS: Valence quark spin.
Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Deeply Virtual Compton Scattering on the neutron Slides by Malek MAZOUZ June 21 st 2007 Physics case n-DVCS experimental setup Analysis method Results.
Hall A collaboration meeting, June 23-24, 2005, 1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas.
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
Collaboration News and Business John Arrington Chair, Hall A CC Hall A Collaboration Meeting December 13, 2007.
E05-102: Measurement of A x and A z asymmetries in the quasi-elastic 3 He(e,e'd) reaction Hall A Collaboration Meeting Xiaohui Zhan MIT prsented by Measurement.
Extraction of G E n at Q 2 =1 (GeV/c) 2 by Measurements of May 1, 2011 Ge Jin University of Virginia.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Low Q 2 Measurement of g 2 and the LT Spin Polarizability A. Camsonne, J. P. Chen Thomas Jefferson National Accelerator Facility Karl J. Slifer University.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky College of William and Mary, Williamsburg VA Experimental Overview The.
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
Elastic Electron Scattering off He and He (E04-018) Elena Khrosinkova Kent State University Hall A Collaboration Meeting Jefferson Lab, June
1 New target transverse spin dependent azimuthal asymmetries from COMPASS experiment Bakur Parsamyan INFN & University of Turin on behalf of the COMPASS.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
The Spin Structure of 3 He and the Neutron at Low Q 2 : A Measurement of the Extended GDH Integral Vincent Sulkosky (for the JLab Hall A Collaboration)
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Budget Update January 26, Our Priorities have not changed… Students Employees.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
PR : Precision Measurements and Studies of a Possible Nuclear Dependence of R = L / T Simona Malace - contact (JLab) Eric Christy (Hampton U.),
1 Service Level Agreement Service Level Agreement Based on Lines of Business Payroll Processing EmpowHR Pay Tech DPRS CLER.
Introduction Glasgow’s NPE research Group uses high precision electromagnetic probes to study the subatomic structure of matter. Alongside this we are.
New Hope Baptist Church Sunday, January 29, 2012.
Prof.ir. Klaas H.J. Robers, January 16, 2013 Supervising a graduating student 1.
Week 1.
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
Deeply Virtual Compton Scattering on the neutron with CLAS12 at 11 GeV k k’ q’ GPDs nn’ Silvia Niccolai CLAS12 Workshop, Paris, March 8th 2011.
April 06, 2005 JLab 12 GeV upgrade DOE Science Review 1 Fundamental Structure of Hadrons Zein-Eddine Meziani April 06, 2005 DOE Science Review for JLab.
1 The and -Z Exchange Corrections to Parity Violating Elastic Scattering 周海清 / 东南大学物理系 based on PRL99,262001(2007) in collaboration with C.W.Kao, S.N.Yang.
DVCS collaboration meeting, December 15-16, 2008, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
DESY PRC May 10, Beyond the One Photon Approximation in Lepton Scattering: A Definitive Experiment at DESY for J. Arrington (Argonne) D. Hasell,
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Proton Form Factor ratio GEp/GMp with polarization method --on behalf of Jefferson lab GEp3 collaboration Wei Luo Lanzhou University, China April
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Pb Electroweak Asymmetry in Elastic Electron-Nucleus Scattering : A measure of the neutron distribution PREX and CREX 48 Ca Neutron Skin Horowitz.
Thomas Jefferson National Accelerator Facility Hall C Commissioning: The Past (1996) First Exp: “by consensus” What Hampton Univ. wanted What ANL wanted.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
Measuring the Spin Structure of 3 He and the Neutron at Low Q 2 Timothy Holmstrom College of William and Mary For the Jefferson Lab Hall A Collaboration.
Transverse Momentum Dependence of Semi-Inclusive Pion and Kaon Production E : Spokespersons Peter Bosted, Rolf Ent, Hamlet Mkrtchyan 25.5 days.
Jefferson Lab Overview Bob McKeown April 20, 2015.
Thomas Jefferson National Accelerator Facility PAC-25, January 17, 2004, 1 Baldin Sum Rule Hall C: E Q 2 -evolution of GDH integral Hall A: E94-010,
Hall A collaboration meeting, june 13-15, 2002, 1 Operated by the Southeastern Universities Research Association for the U.S. Department Of Energy Thomas.
Hall A Status Hall A Collaboration Meeting Dec 15, 2011 Robert Michaels Acting Hall A Leader Recent Activity Future Projects Scheduling Process Publications.
JLab, October 31, 2008 WACS in 12 GeV era 1 GPDs Wide-Angle Compton Scattering pi-0 photo-production in 12 GeV era B. Wojtsekhowski Outline WACS and other.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
Comparison of GENIE with Garino Data Xin Qian BNL In collaboration with Steve Dytman 1.
Hall A collaboration meeting, December 3-5, 2008, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National.
Comparison of GENIE with Garino Data Xin Qian BNL In collaboration with Steve Dytman 1.
Jefferson Lab Overview
PAC44 Results NUMBER TITLE CONTACT PERSON HALL DAYS REQUESTED
Report to UGBOD Bob McKeown January 14, 2016.
PAC38 Charge 1.) Review new proposals, previously conditionally approved proposals, and letters of intent† for experiments that will utilize the 12 GeV.
Measurement of the Pion Structure Function
View from Lab Management HPS Collaboration Meeting
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Hall A Collaboration Meeting
Life Cycle of a Nuclear Physics Experiment
Presentation transcript:

Hall A collaboration meeting, Junr 21-22, 2007, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility HALL-A STATUS REPORT Hall A Collaboration Meeting December 12-14, 2007 K EES DE J AGER J EFFERSON L ABORATORY Our wine-and cheese gathering is in A110 on Thursday evening, starting at 6:00 pm. Dennis has graciously agreed to chaperone us. If you attend (most of you, I hope) please pay Stephanie the standard 9 $ contribution

Hall A collaboration meeting, Junr 21-22, 2007, 2 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Achievements 2007-I Successfully ran JulyE04-018Elastic scattering off 3,4 HeMakis Petratos Aug-OctAssembly of NaI calorimeterAlexandre Camsonne Installation for Coulomb SumEd Folts Oct-DecE05-110Coulomb SumZein-Eddine Meziani 13(!) proposals submitted to PAC-33 for a total of 281 days with an allocation of 101 days 7 completely new proposals 2 resubmissions to remove conditional approval 1 jeopardy 2 resubmissions to remove deferral 1 resubmission for additional beam time Essential whether new proposals can run in parallel with Qweak GEp and N-> Δ definitely can PV-DIS and n-DVCS can if they take a hit in beam energy (polarization?) G M n, x>2 and WACs probably can B(Q 2 ), 4 He(e,ep), deuteron threshold definitely can not

Hall A collaboration meeting, Junr 21-22, 2007, 3 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Hall A Approved Proposals PAC Experiments completed 42(!) days scheduled for the next 12 months Backlog ~4.7 years (annual average for Hall A is ~60 days at 80% funding)

Hall A collaboration meeting, Junr 21-22, 2007, 4 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Publications (incl. submissions) in 2007-I M. Iodice et al., High Resolution Spectroscopy 12 B λ by Electroproduction, PRL 99, (2007), nucl-ex/ R. Shneor et al., Investigation of proton-proton short-range correlations via the 12 C(e,epp) reaction, PRL 99, (2007), nucl-ex/ G. Ron et al., The Proton Elastic Form Factor Ratio µ p G E p /G M p at Low Momentum Transfer, PRL 99, (2007), nucl-ex/ M. Mazouz et al., Deeply Virtual Compton Scattering off the Neutron, PRL (2007), nucl-ex/ A. Shahinyan et al., The Electromagnetic calorimeter in JLab Real Compton Scattering Experiment, arXiv: Total number of Hall A publications: PRL+PLB 30, PRC 14, NIM 14(+1). Average time from completion of experiment to submission 20 months with 75% within 3 years. At present 5 experiments that have not submitted a manuscript more than 3 years after completion Hall A has been running now for 10+ years, with an average publication output of 4+. Essential that more effort goes into publications, especially archival pubs Top cited Hall A publications: , Please enter all publications into the JLab publication data base on submission

Hall A collaboration meeting, Junr 21-22, 2007, 5 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility PUBLICATIONS-II Archival papers promised to be completed LAST year: -E He(e,ep)complete L/T separation -E91-026deuteron A and B next spring -E93-050VCS -E94-010GDHonly introduction needed -E99-007G E p -II -E99-114WACS Achievements to date: E O(e,ep) published E91-010HAPPEx-I published E N-> published E93-027G E p -I published E94-012H( ) π o published E n -> π - ppublished E95-001G M n published E99-117A 1 n published

Hall A collaboration meeting, Junr 21-22, 2007, 6 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Scheduled Experiments in Hall A ExpTitleContact persons Feb-MarInstallation of BigBite Apr-MayE π 0 electroproductionR. Lindgren May-JulInstallation of Polarized 3 He target Jul-Decrun BigBite plus polarized 3 He experiments E06-010transversityXiaodong Jiang E06-014d 2 n Brad Sawatsky FY09E He SSATodd Averett E05-102Quasi-elastic 3 He Doug Higinbotham 2009HAPPEx-III, Lead Parity, DIS-Parity Schedule on the web through calendar However, there are significant uncertainties about the budget (continuing resolution possibly for full FY08, we might not get the Presidents budget,…). Even if we do get PB08, the present budget allocation to Physics implies a ~200 k$ cut for Hall A. If that sticks, lab management has been informed that we will have to delay the start-up of transversity by 5 weeks. All of this means that the beam schedule can only be trusted through May 2008.

Hall A collaboration meeting, Junr 21-22, 2007, 7 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Hall A Schedule (Very Tentative!) Max energy Qweak will run at is GeV (maybe GeV, then 5 pass ~ 5.7 GeV) Accelerator needs 6 month down prior to the 12 GeV installation

Hall A collaboration meeting, Junr 21-22, 2007, 8 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility 6 GeV Energy Recovery Plan Today

Hall A collaboration meeting, Junr 21-22, 2007, 9 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Long-Term Schedule CEBAF will be limited to ~33 weeks of beam on target in FY08 and following FYs as long as the budget continues as expected. This corresponds to a total of 4 months accelerator down per year. Based on these assumptions Hall A still has a full year of running available for new proposals. However, for the last 18+ months before the accelerator down we would have to run in parallel with Qweak at a fixed energy/pass of 1.1 GeV and possibly severe restrictions in the available current and polarization. Also, resources, both capital and designers, will become scarcer as the 12 GeV activities increase. PAC-33 is last 6 GeV PAC. Summer 2008 PAC will be charged to evaluate long- term schedule (that means that we need to have one by then!)

Hall A collaboration meeting, Junr 21-22, 2007, 10 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility 12 GeV Schedule

Hall A collaboration meeting, Junr 21-22, 2007, 11 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator Facility Summary Hall A continues to have a very active and successful research program, but running the 6 GeV program will continue under serious pressure. Vocalize your concerns when you feel the need. Also, make our achievements known to the scientific community through timely publications. Have to start discussions about the form of the Hall A collaboration in the 12 GeV era. LRP report writing process practically completed, expect final report shortly. Please use your vote in the ongoing DNP election process