Bigbite Frame Modification & Trigger Plane Bigbite Family Readiness Review Xiaohui Zhan MIT March 19, 2007.

Slides:



Advertisements
Similar presentations
How to create a climate graph?. Step One: Draw on three axis.
Advertisements

ThemeGallery PowerTemplate
Partitioning 2-digit numbers
Table de multiplication, division, addition et soustraction.
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Ozone Level ppb (parts per billion)
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
PREX main detector Piotr Decowski Aimee Shore Smith College Piotr Decowski Aimee Shore Smith College Kumar Krishna Jon Wexler Patrick Rogan Vireak Yim.
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
Preparing the Big Bite Hadron Detector Package Gordon Lott, Virginia Tech Mentor: Douglas Higinbotham All the signals from the PMTs are sent via cable.
Graphing Linear Inequalities in Two Variables
UNIVERSITY OF JYVÄSKYLÄ New Topology Management Algorithms for Unstructured P2P Networks Presentation for The Second International Workshop on P2P Systems.
On your paper, graph the following: D (m) T (sec)
Year 10 Exam Revision 2 Groups of 4 Pupil A,B,C,D 1 point for each pupil.
2014 Egg Industry Issues Forum. Building Excellence for over 90 years PREPARING FOR THE FUTURE!
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Hoop House Construction. Parts of the hoop house Frame Hoops Braces Plastic cover.
Lightweight Baseboard Construction Presented at VMRS Meeting 18 September 2013 by John de la Lande Photo Gippsford.
Christian-Doppler-Laboratory for performance-based optimization of flexible pavements Institute for Road Construction and Maintenance – Vienna University.
Scintillator Tile Hadronic Calorimeter Prototype (analog or semidigital) M.Danilov ITEP(Moscow) CALICE Collaboration LCWS04, Paris.
Prototype sPHENIX Calorimeters
My Special Number My Special Number Afrin12/10/2007.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Cabling system components
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
KYMV060C4 2 BY 2 MPDP INSTALLATION GUIDE KINGYOO Electronics., LTD.
HDMI cables May 2009
EXAMPLE 4 Solve a multi-step problem SHOPPING
Development of the FLNR Cyclotron Complex /2009 Priority 1 Dubna,
CO2 Car Specifications By Sean Nguyenle Dragster Body One (1)-piece, all-wood construction. Any type of lamination will result in disqualification.
Xenon Detector Hardware Liquid Xenon Group. 1 Outline Detector in 2008 Operation in 2008 Hardware Upgrade and Schedule Summary.
NEFE High School Financial Planning Program Unit Three – Investing: Making Money Work for You Investing: Making Money Work for You Investing: Making Money.
The table shows the top scores for girls in barrel racing at the 2004 National High School Rodeo finals. The data can be presented in a table or a spreadsheet.
Employer pays monthly fees for all employees Key disadvantage = Pay regardless of usage 100 employees x $15/m = $1,500/month 100 employees x.
Graphic Communication
8 2.
Marks out of 100 Mrs Smith’s Class Median Lower Quartile Upper Quartile Minimum Maximum.
Graphic Communication
Exchange of materials. Cells exchange matter and energy In: Oxygen Nutrients eg glucose (carbon dioxide and light energy in plants) Water Ions Out: Carbon.
Sets Sets © 2005 Richard A. Medeiros next Patterns.
23-8 3x6 Double it Take Away 6 Share By 9 Double it +10 Halve it Beginner Start Answer Intermediate 70 50% of this ÷7÷7 x8 Double it Start Answer.
Aluminium Collection Source & Trade Agency Info:
Number bonds to 10,
2 x0 0 12/13/2014 Know Your Facts!. 2 x1 2 12/13/2014 Know Your Facts!
MEL 4E.  Graphing data can make it easier to quickly see trends. There are different types of graphs which each show and compare data.
Value adding solutions to optical applications High-Power Lasers - Product Presentation.
SURFACE AREA Sue Feemster Texas Middle School Summer 2002.
Multiplication Facts Practice
Graeme Henchel Multiples Graeme Henchel
0 x x2 0 0 x1 0 0 x3 0 1 x7 7 2 x0 0 9 x0 0.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
BigBite Wire Chamber Test Xin Qian Duke University Feb 20th For TRANSVERSITY Collaboration Wire chamber Gas Cerenkov Shower system Scintillator Magnetic.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
Moeller GmbH GB Leistungsschalter Protective note to rule DIN ISO is to be considered The new line of circuit breaker IZM ILS-P / W. Wagner July.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
ZDC inside TAN – Crane position over TAN slot – lifting beam lowered to ZDC ZDC Sarco TAN.
Use original rear consol support/seat belt mountUse supplied console support bracket (front.) Unit Can possibly pop pocket off lower door. IF NOT,
AMS Tracker Meeting17/10/05 Eric Perrin (GE) Tracker mechanics at Uni -Ge Safety issues Assembly Still to be made.
Baby-MIND Modules & Services
Identifying Partners/Licensees
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Presentation transcript:

Bigbite Frame Modification & Trigger Plane Bigbite Family Readiness Review Xiaohui Zhan MIT March 19, 2007

1. Remove upper longitudinal beams2. Remove bottom beams3. Lower the slanted support beams New Frame SRC Frame 4. Add cross steal beams to mount the wire chamber 5. Remove auxiliary plane, reuse the beams in step 2 to construct the base 6. Add 4 new longitudinal beams 7. Add brackets to support the shielding

Connections are made using Kanya T blots, Mc master nuts and washers.

Order List: 1.100x100 Al EXTRUSION MA /1050 x4 2.T BOLTS M8 A35-60 x20 3.T BOLTS M8 A35-20 x12 4.MOUNTING BRACKET A30-40 x4 5.MOUNTING BRACKET A30-00 x4 6.DOUBLE EXTRUSION NUT x12 7.UNIVERSAL CONNECTOR WITH BASE 50 A20-90 x12 Estimated Price: $736

E-E Trigger plane Consist of 24 scintillator bars Dimension 500x86x3 mm 3 ( E) 500x86x30 mm 3 (E) Further Particle Identification Within 1-2 month: test PMT with cosmic ray