SBS Design Status Robin Wines. SBS Design Transfer in process of yoke steel from BNL, but BNL is having issues with their magnet tagging system – update.

Slides:



Advertisements
Similar presentations
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Electrical Issues John Escallier, NSLS-II Project To achieve high quality electrical characteristics for storage.
SHMS Design, Engineering & Construction Status for Hall C Users meeting Paul Brindza January 2010.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Solid Target Studies in the UK Solid Target Studies in the UK Rob Edgecock On behalf of: J.Back, E.Bayham, R.Bennett, S.Brooks R.Brownsword, O.Caretta,
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
Permanent Magnets Y. Iwashita Kyoto University. PMQ with saturated iron pole B=2Br (1-r 1 /r 2 ) cos 2 (π/M) sin(2π/M) /(2π/M)
Electro-Magnetism © David Hoult Magnetic Field Shapes © David Hoult 2009.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
SBS Magnet John J. LeRose. Assembly drawing of 48D48 magnet as used at BNL (vertical field)
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
rd ATF2 project meeting Permanent Magnet Updates Y. Iwashita, M. Ichikawa, Y. Tajima, M.Kumada, C.M. Spencer Kyoto University, NIRS, SLAC Contents:
Magnet Design & Construction for EMMA
PSI Contact PSI visit arranged for Feb 9th –Assessment of activity/contamination Possible remedial action –Seek additional equipment for solenoid Power.
Decay Solenoid – what do we have to do to make it work?
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
SHMS Spectrometer Update Hall C 2008 Users Meeting Paul Brindza January 18, 2008.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
SBS Magnet and Support Status Robin Wines June 2013.
SBS Magnet John J. LeRose. Magnet: 48D cm gap, 2-3 Tesla*m Solid angle is 70 msr at 15 ° GEM chambers with 70 μm resolution Momentum resolution.
MBA Magnets MultiBend Achromat Magnets 8/14/2015 Review By Mark Jaski.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
NUMI Update on Steel, Coils, Fixtures, and Prototyping J.K. Nelson 12/98 MINOS Meeting.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
SBS Budget Situation John J. LeRose 6/27/2012. What I’ve asked for in 2013 SBS Basic: $600k (direct cost) – $355k from original + $245k (power supply.
DON LYNCH DECEMBER 4, AGENDA December 4, BABAR Magnet Update Outer HCal Structural Analysis (Assembly and Support) sPHENIX Project Management.
Design Update Puck and Gun Magnet February 16, 2016.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
1 Muon g-2 Experiment at BNL Presented by Masahiko Iwasaki (Tokyo Institute of Technology) Akira Yamamoto (KEK) for E821 g-2 Collaboration: Boston, BNL,
Neutral Particle Sweeper Magnet Paul Brindza Nov 17, 2014.
E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H
SBS- Counterweight Support and Magnet Assembly - Status
Electro-Magnetism © D Hoult 2008.
PROGRESS REPORT OF A NLNS-FFAG ADS MAGNET
Conceptual Design of CEPC Interaction Region Superconducting Magnets
SoLID Magnet - Engineering and Cost
Magnets and Electromagnets
Magnets and Electromagnets
SHMS Q2 with Beam Line Shield Pipe
Magnets and Electromagnets
CLEO II Magnet in Hall A for SoLID
SHMS Master Layout-Rays
STEEL PLATES.
Magnets and Electromagnets
Magnet, Support and Infrastructure
Super-FRS Dipole magnetics
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
IR Beam Transport Status
IR Magnet Design and Engineering Considerations
PS magnet status D Bodart 25/06/2019.
GEn-RP engineering & design Status
Presentation transcript:

SBS Design Status Robin Wines

SBS Design Transfer in process of yoke steel from BNL, but BNL is having issues with their magnet tagging system – update from BNL on April 23rd Radiation survey has cleared material for transport Shipping arrangements are in process at JLAB Storage location has been allocated at JLAB Rigging company will be contracted when shipping date is known BNL continues to look for steel plates for us to use as counterweight – need radiation clearance Power Supply specification has been reviewed. Giles is getting budgetary estimate to determine if we proceed with bidding or sole source procurement Experiment configurations complete. Magnet steel cutouts defined by magnet simulation.

Integral field strength specified as 2.0T-m and 2.5T-m with pole shims. Analysis at I=2000A results in 1.4 to 1.6 T-m. OK ? Continue to optimize design of field clamps and beam line. Previous analysis models indicate shielded beam line achievable with use of solenoid coils at magnet entrance and exit. Continue design of support and counterweight

SBS Kinematics

Magnet Cutout and Field Clamps

GMn Q^2 =12.0

GEp Q^2 = 5.0