The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)

Slides:



Advertisements
Similar presentations
CALICE Summary of 2006 testbeam for the ECAL
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
n-DVCS/E status report
Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection.
Polarized 3 He Target for A1n-A J. P. Chen, June 11, 2013, Hall A Meeting Overview Design Progress Progress in target lab Progress from users.
Polarized 3 He Target for 12 GeV Experiments J. P. Chen, February 12, 2013, Hall A Meeting Introduction Target performance for 6 GeV experiments 12 GeV.
E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Status Report of the measurement of G E n via 3 He(e,e´ n) Robert J. Feuerbach The College of William and Mary for the E Collaboration.
Polarized 3 He Target Lab Update Presented by Xiaohui Zhan MIT Hall A Collaboration Meeting, Dec. 14, 2007.
BigBite Hadron Detector Status Hall A Collaboration Meeting Xiaohui Zhan On behalf of the E collaboration MIT Jun 21, 2007.
A Parasitic Measurement During E for Target Single-Spin Asymmetry in Inclusive DIS n (e,e Reaction on a Vertically Polarized 3 He Target Tim Holmstrom.
GEn_stat_12-05 Hall A Collaboration Meeting December 5-6, 2005 Status Report: G En G. Cates, K. McCormick, B. Reitz, and B. Wojtsekhowski; spokespersons.
E05-102: Measurement of A x and A z asymmetries in the quasi-elastic 3 He(e,e'd) reaction Hall A Collaboration Meeting Xiaohui Zhan MIT prsented by Measurement.
Target Normal Single-Spin Asymmetry in Inclusive DIS n (e,e with a Polarized 3 He Target Tim Holmstrom with Xiaodong Jiang, Todd Averett, Ron Gilman Hall.
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Half Life. The half-life of a quantity whose value decreases with time is the interval required for the quantity to decay to half of its initial value.
1 1  1 =.
1  1 =.
The 24-hour clock 1 12-hour clock 24-hour clock
Tenths and Hundredths.
Break Time Remaining 10:00.
The CALICE test beam activities Fabrizio Salvatore Royal Holloway University of London (for the CALICE collaboration) ALCPG07, FNAL, Chicago, 22 nd October.
Tentative HIAPER Development Plan Critical Infrastructure Dev. (10/1/04 – 4/30/05) Pilot Proficiency (5/1/05 – 5/15/05) Science Systems Flight Checks (5/15/05.
The CALICE test beam at CERN Fabrizio Salvatore Royal Holloway University of London (on behalf of the Calice Collaboration) SPSC meeting, CERN, Geneva,
Multiplication Tables Test 3 and 5 Times Tables 3 and 5 times tables There are 10 questions. Each one will stay on the screen for 15 seconds. Write down.
Project Scheduling: Lagging, Crashing, and Activity Networks
15. Oktober Oktober Oktober 2012.
Area of triangles.
Created by Mr. Lafferty Maths Dept.
We are learning how to read the 24 hour clock
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
SuperNEMO Thoughts about next generation NEMO experiment Ruben Saakyan UCL.
: 3 00.
5 minutes.
Number bonds to 10,
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Clock will move after 1 minute
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Let’s Add! Click the cloud below for a secret question! Get Started!
Jin Huang PhD Candidate, MIT For MENU 2010 May 31, Williamsburg.
Run Plan Document E04-007: Threshold Pion Production.
G2P Target installation and Beyond. Schedule Pivot before.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
E08-005: A y 0 in Quasi-Elastic 3 He(e,e’n) Scattering Elena Long Hall A Collaboration Meeting December 17 th, /17/2013Hall A Collaboration MeetingElena.
AM Software Review. Hall C after 12 GeV Upgrade Beam Energy: 2 – 11 GeV/c Super High Momentum Spectrometer (SHMS) –Horizontal Bender, 3 Quads, Dipole.
Short Range Correlation in 4 He E07 – 006 Update report presented to the Hall A User group meeting the Hall A User group meeting Igor Korover Tel Aviv.
By Douglas Higinbotham. Added Cherenkov and Sieve Plate.
BigBite Spectrometer Equipment by Douglas W. Higinbotham.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
08-Sep-00PHENIX Upgrades PHENIX has a phased strategy to q Complete the current detector q Enhance its capabilities q Extend its physics reach.
Understanding the 3 He Nuclei: Asymmetry Measurements in Quasi- Elastic Ge Jin University of Virginia For the E Collaboration.
Presentation transcript:

The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)

Why are we having this review? - John Domingo

E04-007: Threshold Pion Production Left Negative (Right Arm Not Required) Cryo-target 20 cm race track plus new 4 cm pancake target BigBite with Wirechamber Hadron Package ( ) –two wire-chambers (one upgraded) –dE/E trigger scintillators –updated frame & cabling 4 He Bag System

E & 11: Transversity Left (S1, S2M, A1, RICH, Gas Cherenkov, Pion Rejector) 30 with Electron Package –three wirechambers (two chambers from Hadron package) –upgraded preshower & shower (scope pending funding) –new gas Cherenkov (critical for d2) –GEN timing scintillators Polarized 3He Target System –transverse field coils –large diameter exit beam pipe Fastbus for Chamber Readout

E06-014: d 2 n Left (S1, S2M, A1, Gas Cherenkov, Pion Rejector) 45 with Electron Package –detectors the same as Transverity Polarized 3 He Target System –change to in-plane polarization

E05-015: A y The Big Hop (Left HRS and BigBite Trade Places) Left - 20 with Negative Polarity Right - 20 with Negative Polarity BigBite with neutron detector for large angle Polarized 3 He Target System –nominal exit beam-line

E05-102: 3 He(e,ed) Left 15 - X with Negative Polarity Right 12.5 with Negative Polarity BigBite with Hadron Package & Hall A Neutron 70 –system check during E Polarized 3 He Target System

Schedule and Milestones Group DAQ Layout Finished DAQ Completed and Tested Begin PreShower / Shower Upgrade –Scope of Upgrade Still Pending Funding –Project Defined By April 1 st Install Chambers In Hadron Package Complete Hadron Package Testing Submit FY08 Requisitions For Transversity & d2 –Local Construction Items –Cherenkov Gas Complete Electron Package Testing –Must Have Chambers Back In Hadron Package Before Christmas Install Threshold Pion Experiment Install Transversity & d 2 n Experiments Complete Neutron Detector Veto Install A y & 3 He(e,ed) Experiments (The Big Hop)

Information Posted On The Internet