Core Test Sites WTF Projects & Applications Sub-Group John Faundeen WGISS-19 March 2005 Cordoba, Argentina.

Slides:



Advertisements
Similar presentations
1 Industry Brief Apr Outline How is Alberta preparing? How is Alberta preparing? Albertas Health Response Albertas Health Response Albertas Operational.
Advertisements

NANC Report Numbering Oversight Working Group (NOWG) November 30, 2006 Co-Chairs: Rosemary Emmer, Sprint Nextel Natalie McNamer, T-Mobile Karen Riepenkroger,
Project and Applications Subgroup Pakorn Apaphant and Kathy Fontaine Annapolis, MD September 11, 2006.
Projects & Applications Subgroup Osamu Ochiai and Pakorn Apaphant Budapest, Hungary May 11 th 2006.
CEOS Working Group on Information Systems and Services - 1 Core Site WGISS Test Facility WGCV & WGISS Efforts John Faundeen & Stu Doescher, USGS WGISS-15.
1 AG-07-03: Data Integration Recommendations The GEOSS Secretariat / ADC to support: –Development of an international moderate (30m) resolution data initiative,
CEOS/WGISS, Cordoba, March 7-11, WTF-CEOP/WGCV WGCV/WGISS Collaboration March 9, 2005 Osamu Ochiai - JAXA Ben Burford - JAXA/RESTEC.
CEOS Working Group on Information Systems and Services - 1 Working Group on Information Systems & Services (WGISS) Trends & Progress in Data & Information.
Joint WGISS-WGCV Session John Faundeen WGCV-23 & WGISS-19 9 March 2005 Cordoba, Argentina.
U.S. Department of the Interior U.S. Geological Survey WTF Core Test Sites Status and Plans WGISS #24, DLR, Oberpfaffenhofen/Munich, Germany October 15,
CEOS Project & Applications Subgroup Hanoi May Global Data Set Task Team Status Wyn Cudlip on behalf of Lorant Czaran BNSC/QinetiQ
WGISS Infrastructure Task Team (WITT) Status Report Stuart Doescher, USGS Dave Hartzell, NASA Ames Allan Doyle, NASA/ EOGEO WGISS – 20 September 12 – 16,
CEOS Plenary-18 Summary Steve Ungar & John Faundeen WGCV-23 & WGISS-19 March 2005 Cordoba, Argentina.
Page 1 WGISS Response to GEO/CEOS-SIT Ken McDonald WGISS/Vice-Chair.
The CEOS Constellations CEOS IP Task Force SIT-18, 21 March 2006.
WGISS Infrastructure Task Team (WITT) Status Report Stuart Doescher, USGS Dave Hartzell, NASA WGISS-18 September 2004 Beijing, China.
CEOS WGISS Joint Subgroup Meeting, Thailand, September CEOS WGISS Subgroup Structure Overview Wyn Cudlip BNSC/QinetiQ
WGISS Infrastructure Task Team (WITT) Status Report Stuart Doescher, USGS Dave Hartzell, NASA / ARC WGISS-19 March 2005 Cordoba, Argentina.
The Working Group on Information Systems and Services (WGISS) Report to the 16th CEOS Plenary DRAFT Version 0.1 Colorado Springs November 2003 Terry Fisher.
WGISS Report to Plenary John Faundeen WGISS-20 September 2005 Kyiv, Ukraine.
USGS Footprint Coverage Server Data Services Task Team John Faundeen WGISS-19 March 2005 Cordoba, Argentina.
CEOS WGISS/WGCV Meeting Cordoba, March, WGISS EO Data Portal Introduction Wyn Cudlip BNSC/QinetiQ Presentation to WGISS.
WGISS #19 Plenary, CONAE, Cordoba, Argentina, March 2005 Cluster and Grid Project: Status & Update Pakorn Apaphant Geo-Informatics and Space Technology.
Projects and Applications Subgroup Pakorn Apaphant Kathy Fontaine WGISS-24 DLR, Oberpfaffenhofen, Germany October.
Projects and Applications Subgroup Pakorn Apaphant Kathy Fontaine WGISS-23 Hanoi, Vietnam May 21, 2007.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
Name ____________________ Date ___________ Period ____.
International Polar Year Announcement of Opportunity IPY AO The IPY AO ( was opened on June 15 th 2006 and closed September 25.
CEOS Working Group on Information Systems and Services - 1 Committee on Earth Observation Satellites (CEOS) Working Group on Information Systems & Services.
CEOS Working Group on Information Systems and Services - 1 Committee on Earth Observation Satellites (CEOS) Working Group on Information Systems & Services.
1 Closing Report on WTF-CEOP Project Team Satoko Horiyama MIURA/JAXA.
1 CEOS GRID Activity Shinichi Sobue/NASDA Kaori Kuroiwa/RESTEC.
CEOS WGISS Organizational Chart Prepared by John Faundeen WGISS Chair September 2004.
Page 1 Various Topics WGISS 17 - Troms Ø May 10, 2004 I.Petiteville, ESA.
Seoul, South Korea. Background Population of 9,794,304 (in 2010) km 2 (233.7 mi 2 ) From a Travel site: “Air quality in Seoul is fine and improving.
CEOS WGISS & Subgroup Meeting Cordoba, March, EO Data Portal Task Team Overview Wyn Cudlip BNSC/QinetiQ Presentation.
CEOS Core Test Sites WGISS Test Facility (WTF) A Collaboration between WGCV & WGISS September 2005 John Faundeen.
GEOSS Architecture for the Use of Satellites for Disaster Management and Risk Assessment Karen Moe/NASA Earth Science Technology Office Presented at CEOS-WGISS-32.
Identify the Gaps Try to Provide Service in the worldwide WGISS User Vice Chairs LIU Chuang ( NRSCC, CAS) Lorant Csaran (UN) 18 WGISS Meeting, Beijing.
CEOS Data Cube Open Source Software Status Brian Killough CEOS Systems Engineering Office (SEO) WGISS-40 Harwell, Oxfordshire, UK September 30, 2015 (remote.
Calendar November 2009 – November 2010 Agenda item: 28 Presented by: Hilcéa Ferreira (INPE) 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Land Product Validation subgroup activity in support of LAI inter-comparison.
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
1 Joint Agency Commercial Imagery Evaluation (JACIE) 7 th Annual Workshop held March 25-27, 2008  USGS, NGA, USDA, and NASA Collaboration Next Workshop.
CEOS/WGISS Global Datasets Task Team - Update Report, Toulouse –12th May Not yet responded to the call for TT web site set up, TT description, will.
WGISS-24 Preparatory meeting Issue 1.1 Sunday Sep. 14, 2007.
WGISS-20 Data Services Task Team John Faundeen U.S. Geological Survey September Kyiv, Ukraine.
Page 1 Various Topics WGISS 18 - Beijing September 6-10, 2004 I.Petiteville, ESA.
Core Test Sites WTF John Faundeen WGCV-23 & WGISS-19 March 2005 Cordoba, Argentina.
WGISS Infrastructure Task Team Web and Mail Services Update Dave Hartzell WGISS WITT 17 Tromso, Norway.
PROJECTS & APPLICATIONS SUBGROUP
Task DA Report Stephen Ungar (WGCV/NASA), POC
Future directions of CEOS WGCV: Incoming chair perspective
Moderate Resolution Sensor Interoperability (MRI) Initiative
WGCapD Report Phila Sibandze, SANSA CEOS Plenary 2017
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
Action Item Review for WGCV-43
WGCV Overview K. Thome WGISS#45 / WGCV#43
Geoscience Australia Report
كشف التغير لغطاء النبات
WGCV Chair’s Report K. Thome NASA/GSFC WGCV 42
NHS Continuing Healthcare
WGISS Working Group for Information Systems & Services
Committee on Earth Observation Satellites
Working Group on Cal/Val Update
Day 2 Summary K. Thome NASA WGCV Plenary # 42 May 16-19, 2017.
EO Data Portal Task Team Status
UCAAT 2015, ready for the launch!
DEM related topics K. Thome NASA WGCV Plenary # 45 CSIRO, Perth
Forest & Biomass (inc GFOI)
Presentation transcript:

Core Test Sites WTF Projects & Applications Sub-Group John Faundeen WGISS-19 March 2005 Cordoba, Argentina

Outline Additions Plans Close Out

Additions Sites (From 5 to 8) Puget Sound – Terrain Mapping SG Railroad Valley – Infrared/Visible Optical SG Brazil SAR Calibration Site – SAR SG Data SPOT VEGETATION AVHRR Lidar

Plans Standardizing Site Minimum Set MODIS SRTM ETM+ Base SPOT Vegetation Via a NASA / GSFC Distributed Link Project Objective! Add Asian Test Site Possibly Gobi Desert and/or Siberia By September 2005 Engage CEOP and UN

Close Out The start of this project began with the acceptance of the original WTF plan by the Team Co-Chairs, which occurred on 15 October The Project is designed to develop prototyping of WGISS components of WTF for WGCV requirements. When the Project Co- Chairs are satisfied that the requirements have been met and the Project has become operational, the Project, Core Site WTF, will cease. The proposed end date for the current WTF is September 30, An operational WTF, with its host agency involvement, needs to be operational by September 1, 2005 to provide a 30-day service overlap and ensure continuity of service. - From Project Plan Probably occur in 2006….