AdV VAC design meeting Cascina, 19 July 2011. Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

UHV gate valve Readiness Review 20Sept2012. Notes/remarks/proposals 1) with standard configuration, seems hard to keep cold the actuator? ( VAT) 2) position.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
11-13/10/2007 ILC BDS Kick-Off Meeting, SLAC, US 1 BDS Vacuum System Dr. Oleg B. Malyshev ASTeC Daresbury Laboratory.
G2P Target installation and Beyond. Schedule Pivot before.
Progress and Plan for Superconducting RF Cavity RF Group.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
MONALISA installation at the ATF2 ATF2 weekly meeting.
Compressor status AWAKE Technical Board meeting 19 May 2015.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Facility Upgrade Status at SSL, UCB Small Prototype Systems – 33mm Demountable Detector Body Parts arrived, cleaned. – 33mm Demountable Detector Test Flange.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
1 VAC – Vacuum system modifications ERC telecon, 24Mar09 A.Pasqualetti for the VAC team.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
NB Cell Changes Kick-off meeting ORE Garching 10/10/2006 A.Tanga.
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
ELENA Vacuum System R. Kersevan, TE-VSC-IVM R. Kersevan, “ELENA Vacuum System”, - ELENA Project Review, Oct14-15, 2013, CERN.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Technology Department LSS2 modifications Impact on the vacuum systems LTEX - 18/01/2011 Eric PAGE – TE-VSC.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
The integration of 420 m detectors into the LHC
Installation of the T600 at Fermilab CSN2, September 22,
VAC – CTRL SYS internal meeting, 14 Dec A list of topics Start of the disassembly works: mid Jan. At first the W arm shall be off- service, then.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
ET Vacuum System 3 x (low frequency cryo-interferometer + high frequency warm-interferometer) Baseline solution Build one detector, the other two will.
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
ELENA installation progress F. Butin / ELENA collaboration.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
Francois and Lau EATM 17 July 2012
1.3-GHz Cavity Vacuum Furnace at IB4
Installation of an Instrument on a CERN machine
Meeting for S1-Global module design Cryomodule and Cryogenics
SPS cryogenic proximity equipment and SM18 validation
M. Alcaide Leon, Paolo Fessia
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
XFEL Vacuum System Commissioning
Test box for ProtoDUNE SP – Integration Test
Hall C Down Stream Beam Pipe And Dump Interface Design
XFEL Collimation and Beam Switchyard Vacuum Issues
Undulator Vacuum System
AdV - Internal Review of VAC subsystem
Periodical meeting about the 'control system ‘
Undulator Vacuum System
‘New stations’ generic Layout Preliminary, NDRC or MSRC?
LCLS Undulator System Production Management
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

AdV VAC design meeting Cascina, 19 July 2011

Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular - is scheduled for Tue19 Jul, from 17h to 18h30. Time will be short, some topics are: 1_ general msrc vacuum design in central area, Antonio + All 2_ pickoff chambers discussion, PR one in particular, Lapp + All technical points: size needed, space constraints, other design options, clean tent, access req.ts, pumping, possible evolution (cryotraps...?) 3_ interface between vac teams / tasks (sharing of works on the platform in particular) All 4_ non VAC works definition, All we shall have a free discussion, slides can be put here: gw.it/ego2/virgo/advanced-virgo/vac/central-area-vacuum-system/19jul-meeting/ The 'meeting room' room is reserved from 16h, so we shall anticipate discussions on technical points of not general interest, such as orings of cryotraps or other details EVO coordinates will followhttps://workarea.ego- gw.it/ego2/virgo/advanced-virgo/vac/central-area-vacuum-system/19jul-meeting/

Measurement Turbo group Ion group Brewster/trap TSP, existing Remote scroll Cryogenic signals M T I ? ti R ? ? R T T C C C I I I I T T M M T T I I MSRC Central area vacuum system: Pumping system on links study is in progress, along with beams definition Try to keep the link PR-BS ‘free’ from apparatus to gain space for the P.O. chamber Some spare ports, big one on PR-BS in particular, for a future ‘cryopump’ Need to discuss DET/INJ links design.

Pressure profile along 3km pipes in an example of MSRC configuration: pay attention to air coming from towers (permeation ). All pumps ON, no cold pump, no INJ brewster, no helicoflex seals...

PR pickoff chamber Good to use one single design if possible… Proposed design seems at limit: a ‘brewster’ section ~ 400mm long should normally be added (here in green): can be integrated ‘inside’ the chamber? A rectangle 1x1.4m is shown here as example. Other constraints to be considered are: valve (maybe inside the oven tbc) cable trays on the floor, ovens additional stiffening bars (see next pic), gauges, towers position tbd (note: ‘oven rotation’ seems not needed )

Single stage sas chamber could be fit below the platform? Drawbacks: difficulties for SAS access? Same design also for INJ lab? Or minitower could be optimized (eventually modifying the end chamber design too)

Vacuum requirements proposal : ~ 1 mbar, static vacuum 1) Better if ready to allow a future pumping system for high vacuum : Turbo and related CTRL system … 2)Keep the possibility to eliminate the ‘brewster window’ in the future? Special ‘trap’, or cryogenic pump would be needed… Space constraints to be considered: a second ‘steering mirror’ chamber could be installed to move away the PR chamber and gain space in a second time? Other possibility is a cryopump on the link... In case the design of the chamber and the inner components have to be UHV compliant

Starting AdV on-site works: First on-site operation is tower displacement, that interfaces with other works within VAC we need discussion about the new vacuum chambers, at first the central hall ones: Envisaged size and required platform modifications (drawings to be circulated) Envisaged installation times procedure non.-vac req.ts clean air flow rate, tent class, They impact also on links,valves, new pumps and related central area modifications. Internal meetings within VAC could be early September.

Non VAC works Platform Ovens modified platform parts Ovens modifications: Cryotraps links Aperture for PR-P.O Platform modifications: Tower displac Apertures for valves Aperture for PR-P.O. ?

Proposed Tasks sharing CryotrapsNikhef Enlarged LinksEGO / TBC Pumping system upgrade EGO Vacuum valves Nikhef New vacuum chambersLapp Towers displacementEGO Control SystemLAL Platform modificationEGO SR towers upgradeLAPP

Possible additional Tasks tbd Cold pump EGO/Genova/tbc Brewster windowsof new chambersLapp Beam dump chamber?tbc