71 th IETF – Philadelphia, USA March 2008 PCECP Requirements and Protocol Extensions in Support of Global Concurrent Optimization Young Lee (Huawei) J-L.

Slides:



Advertisements
Similar presentations
RSVP-TE Extensions for SRLG Configuration of FA
Advertisements

76th IETF – Hiroshima, Japan, November 2009 PCEP Requirements for WSON Impairments Young Huawei Greg
76th IETF – Hiroshima, November 2009 PCEP Requirements and Extensions for the support of Wavelength Switched Optical Networks (WSON) Young
Requirements for PCE Applied in OTN Networks draft-zhang-pce-reqs-for-otn-00.txt Fei Zhang Feng Gao Yuanlin Bao ZTE Corporation.
80th IETF – Prague, March 2011 PCEP Requirements and Extensions for the support of Wavelength Switched Optical Networks (WSON) Young
1 SIP End-to-End Performance Metrics (draft-ietf-pmol-sip-perf-metrics-00.txt)draft-ietf-pmol-sip-perf-metrics-00.txt 71 st IETF Conference PMOL Daryl.
71st IETF Philadelphia, March 2008 ERO Extensions for Path Key draft-bradford-ccamp-path-key-ero-01.txt Richard Bradford : JP Vasseur.
MPLS-TP Lock Instruct MPLS WG, IETF 76, Hiroshima, 9 Nov 2009 draft-dai-mpls-tp-lock-instruct-00draft-dai-mpls-tp-lock-instruct-00 ZTE Corporation Xuehui.
1 IETF 74, 30 Jul 2009draft-ietf-tsvwg-rsvp-security-groupkeying-05.txt Applicability of Keying Methods for RSVP security draft-ietf-tsvwg-rsvp-security-groupkeying-05.txt.
Page th IETF – Beijing, November 2010 A Framework for the Control and Measurement of Wavelength Switched Optical Networks (WSON) with Impairments.
11th Nov th Beijing PCEP-P2MP-MIB draft-zhao-pce-pcep-p2mp-mib-01.txt Quintin Zhao Dhruv Dhody
PCEP extensions for GMPLS
Extensions to the Path Computation Element Communication Protocol (PCEP) for Point-to-Multipoint Traffic Engineering Label Switched Paths draft-ietf-pce-pcep-p2mp-extensions-05.txt.
Extensions to PCEP for Distributing Label across Domains draft-chen-pce-label-x-domains-00 Huaimo Chen Autumn Liu
Requirement and protocol for WSON and non-WSON interoperability CCAMP WG, IETF 81th, Quebec City, Canada draft-shimazaki-ccamp-wson-interoperability-00.
82 nd IETF – Taipei, Taiwan, November 2011 GMPLS OSPF Enhancement for Signal and Network Element Compatibility for Wavelength Switched Optical Networks.
Page th IETF – Dublin, Ireland, July 2008 Framework for GMPLS and PCE Control of Wavelength Switched Optical Networks (WSON) Greg
IETF 69, PCE WG, Chicago Encoding of Objective Functions in PCE Communication and Discovery Protocols draft-leroux-pce-of-01.txt J.L. Le Roux (France Telecom)
WSON Routing WG Drafts 1.Routing and Wavelength Assignment Information Model for WSON 2.General Network Element Constraint Encoding for GMPLS Controlled.
Page th IETF – Philadelphia, March 2008 Signaling Extensions for Wavelength Switched Optical Networks Greg
Extensions to OSPF-TE for Inter-AS TE draft-ietf-ccamp-ospf-interas-te-extension-01.txt Mach Renhai
PCE-based Computation Procedure To Compute Shortest Constrained P2MP Inter-domain Traffic Engineering Label Switched Paths draft-zhao-pce-pcep-inter-domain-p2mp-procedures-02.txt.
Signaling Extensions for Wavelength Switched Optical Networks draft-bernstein-ccamp-wson-signaling-02.txt Greg BernsteinGrotto Networking Young LeeHuawei.
WSON Summary Young Lee Document Relationships Information Gen-constraints Encode WSON Encode Signal Compatibility OSPF Gen-constraints.
1 Requirements for GMPLS-based multi-region and multi-layer networks (MRN/MLN) draft-ietf-ccamp-gmpls-mln-reqs-01.txt CCAMP WG, IETF 66 Jul. 10, 2006 Kohei.
PCE-based Computation for Inter-domain P2MP LSP draft-zhao-pce-pcep-inter-domain-p2mp-procedures-00.txt Quintin Zhao, Huawei Technology David Amzallag,
IETF-74, San Francisco, March 2009 PCE Working Group Meeting IETF-74, March 2009, San Francisco Online Agenda and Slides at:
Draft-oki-pce-vntm-def-00.txt 1 Definition of Virtual Network Topology Manager (VNTM) for PCE-based Inter-Layer MPLS and GMPLS Traffic Engineering draft-oki-pce-vntm-def-00.txt.
LDP extension for Inter-Area LSP draft-decraene-mpls-ldp-interarea-04 Bruno DecraeneFrance Telecom / Orange Jean-Louis Le RouxFrance Telecom / Orange Ina.
69th IETF, Chicago, July 2007 PCE Working Group Meeting IETF-69, July 2007, Chicago Online Agenda and Slides at: bin/wg/wg_proceedings.cgi.
1 SIPREC Protocol (draft-portman-siprec-protocol-05) June 28, 2011 IETF 81 Authors: L. Portman, H. Lum, A. Johnston, A. Hutton.
66th IETF, Montreal, July 2006 PCE Working Group Meeting IETF-66, July 2006, Montreal A Backward Recursive PCE-based Computation (BRPC) procedure to compute.
Draft-ietf-pce-stateful-pce-07 draft-crabbe-pce-pce-initated-lsp-03 Stateful PCE - update Ina Minei Ed Crabbe Jan Medved Robert Varga Siva Sivabalan.
PCE Database Requirements draft-dugeon-pce-ted-reqs-02.txt O. Dugeon, J. Meuric (Orange) R. Douville (Alcatel-Lucent) R. Casellas (CTTC) O.D de Dios (TiD)
Extensions to PCEP for Hierarchical Path Computation Elements PCE draft-zhang-pcep-hierarchy-extensions-00 Fatai Zhang Quintin Zhao.
Requirements for PCE Discovery draft-leroux-pce-discovery-reqs-00.txt Jean-Louis Le Roux (France Telecom) Paul Mabey (Qwest) Eiji Oki (NTT) Ting Wo Chung.
Requirements for PCE Discovery draft-ietf-pce-discovery-reqs-01.txt Jean-Louis Le Roux (France Telecom) Paul Mabey (Qwest) Eiji Oki (NTT) Richard Rabbat.
77th IETF – Anaheim, March 2010 PCEP Extensions in support of WSON Signal Compatibility Constraints Young Huawei Greg.
Extensions to Path Computation Element Communication Protocol (PCEP) for Hierarchical Path Computation Elements (PCE) PCE WG, IETF 84 draft-zhang-pce-hierarchy-extensions-02.
11/13/2003draft-ietf-tewg-interas-mpls-te-req- 01.txt 1 Inter-AS MPLS TE Requirements draft-ietf-tewg-interas-mpls-te-req-01.txt IETF 58, Minneapolis
Extensions to Path Computation Element Communication Protocol (PCEP) for Hierarchical Path Computation Elements (PCE) PCE WG, IETF 86th draft-zhang-pce-hierarchy-extensions-03.
67th IETF - San Diego, CA, USA November 8, 2006 PCECP Requirements for support of Global Concurrent Optimization Y. Lee, Huawei, D. King, Aria Networks,
Path Computation Element (PCE) Discovery using Domain Name System(DNS) draft-wu-pce-dns-pce-discovery-07 Qin Wu ) Dhruv Dhody
60th IETF, San Diego, August 2004 OSPF MPLS Traffic Engineering capabilities draft-vasseur-ospf-te-caps-00.txt Jean-Philippe Vasseur
PCEP MIB Module draft-ietf-pce-pcep-mib-01.txt
BGP extensions for Path Computation Element (PCE) Discovery in a BGP/MPLS IP-VPN draft-kumaki-pce-bgp-disco-attribute-03.txt Kenji Kumaki KDDI R&D Labs,
Applicability Statement for Layer 1 Virtual Private Networks (L1VPNs) Basic Mode draft-takeda-l1vpn-applicability-basic-mode-00.txt Deborah Brungard (AT&T)
IETF 67, MPLS WG, San Diego 11/08/2006
PCE Applicability for Inter-Layer MPLS and GMPLS Traffic Engineering draft-oki-pce-inter-layer-app-00.txt Mar. 20, 2006 Eiji Oki (NTT) Jean-Louis Le.
P2MP MPLS-TE Fast Reroute with P2MP Bypass Tunnels
PCE Working Group Meeting IETF-67, November 2006, San Diego
A Framework for the Control and Measurement of Wavelength Switched Optical Networks (WSON) with Impairments
PCEP Extensions For Transporting Traffic Engineering (TE) Data
Applicability of GMPLS and PCE to Wavelength Switched Optical Networks
PCEP extensions for a BGP/MPLS IP-VPN
PCEP Extension for Native IP ietf
OSPF Enhancement for Signal and Network Element Compatibility for Wavelength Switched Optical Networks
Sanjay Wadhwa Juniper Networks
Guard Bands requirements for GMPLS controlled optical networks
draft-lazzeri-pce-residual-bw-00
PCE – Path Computation Element
WG Document Status Compiled By: Matt Hartley, Lou Berger, Vishnu Pavan Beeram IETF 99 - TEAS Working Group.
WG Document Status Compiled By: Lou Berger, Vishnu Pavan Beeram
draft-barth-pce-association-bidir-01
draft-gandhi-pce-pm-07
Path Computation Element WG Status
draft-zhuang-pce-stateful-pce-lsp-scheduling-05
WG Document Status Compiled By: Matt Hartley, Lou Berger, Vishnu Pavan Beeram IETF TEAS Working Group.
WG Document Status Compiled By: Matt Hartley, Lou Berger, Vishnu Pavan Beeram IETF TEAS Working Group.
PCEP extensions for GMPLS
Presentation transcript:

71 th IETF – Philadelphia, USA March 2008 PCECP Requirements and Protocol Extensions in Support of Global Concurrent Optimization Young Lee (Huawei) J-L Le Roux (France Telecom) Daniel King (Aria Networks) Eiji Oki (NTT)

71 th IETF – Philadelphia, USA March 2008 What is GCO? Global Concurrent Optimization (GCO) is a concurrent path computation application where a set of TE paths are computed concurrently in order to efficiently utilize network resources.

71 th IETF – Philadelphia, USA March 2008 Document History Presented as an individual draft in 67 th San Diego in Nov Revised 5 times (04 version) during Adopted as PCE WG item in June 2007 (right after 69 th and Issued the WG draft draft-ietf-pce-global-concurrent-optimization-00.txt Have revised 2 times since then: currently 02 version. draft-ietf-pce-global-concurrent-optimization-02.txt

71 th IETF – Philadelphia, USA March 2008 Changes since the last version Fabien provided many useful comments: Section 5 - add a new text: "Note also that when the XRO is global to a SVEC, and F bit is set, it should be allowed to specify multiple RRO objects in the PCReq message. Section Instead of creating a new bit (C bit) in the SVEC object to indicate explicitly the GCO application, implicit method was used in v.2. The following text was added: "This can be indicated implicitly by placing the GCO related objects (GOF, GC or XRO) after the SVEC object. That is, if any of these objects follows the SVEC object in the PCReq message, all of the requested path computations specified in the SVEC object are subject to GOF, GC or XRO. Section The Order TLV format was changed to be consistent with PCEP draft. Section Clarify that the delete order is not applicable to new LSP. Section GLOBAL CONSTRAINT Object-Class value is changed to 22 to be consistent with PCEP and OF drafts.

71 th IETF – Philadelphia, USA March 2008 Current Standing I-D is stable. A few Implementations underway. Waiting for chairs review Ready for WG LC?