Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.

Slides:



Advertisements
Similar presentations
Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Mixed Analog and Digital Circuit Boards for the ATLAS TRT Nandor Dressnandt, Godwin Mayers, Toni Munar, Mitch Newcomer, Rick Van Berg, Brig Williams University.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
1/20 Passive components and circuits - CCP Lecture 13.
Segway Controller Notes. = connection on top layer of circuit board = connection on bottom layer of circuit board Ground Plane: Areas enclosed by the.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
Multilayer thin film technology for the STS electronic high density interconnection E. Atkin Moscow Engineering Physics Institute (State University) –
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
27 th September 2007AIDA design meeting. 27 th September 2007AIDA design meeting.
HBD FEM Overall block diagram Individual building blocks Outlook ¼ detector build.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
HallA/SBS – Front Tracker PARAMETERDESIGN VALUE Microstrip Silicon Detector Number of tiles/plane and size2 Number of planes2 Size of the single
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
V.Dzhordzhadze1 Nosecone Calorimeter Simulation Vasily Dzhordzhadze University of Tennessee Muon Physics and Forward Upgrades Workshop Santa Fe, June 22,
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
Pads Assembly- Zamiatin Si Detector – ELMA/Dubna/MSU Interface Board – dubna/baskagiv Carrier Board -dubna/baskagiv Pre-Amp –sleniov(analog) Basilev-dubna.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Differential Signal Path for 64 ch ZTF Mosaic Roger Smith and Stephen Kaye California Institute of Technology.
MICRO-STRIP METAL DETECTOR FOR BEAM DIAGNOSTICS PRINCIPLE OF OPERATION Passing through metal strips a beam of charged particles or synchrotron radiation.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
Development of the readout electronics in Lund for the ILD TPC Vincent Hedberg, Leif Jönsson, Anders Oskarsson, Björn Lundberg, Ulf Mjörnmark, Lennart.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
EC: 7 DISK concept Preliminary considerations
*Institute of Space Science
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
SUMMARY OF THE ORSAY LD-TPC ELECTRONICS MEETING
ob-fpc: Flexible printed circuits for the alice tracker
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Meeting on Services and Power Supplies
prototype PCB for on detector chip integration
Flex Status A.Nomerotski, 4 May 2010.
Vereinfachung der CBM TRD Elektronik
Status of CMS-PPS timing detectors
Differential Signal Path for 64 ch ZTF Mosaic
SALTRO16 activities in Lund
ISO view of pipe w/ individual EC detector installed
Single Detector Design
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Presentation transcript:

Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos

1/2 MVD without cover pads Si strips MCM Power/comm board End plates

Living around the beam pipe Every year we had to clear the beam pipe The central magnet is moved every year The beam pipe was not where it was supposed to be The beam pipe is supported in the CM iron/nosecone Beam pipe Official supports Non-official supports Nosecone MVD support plate Understand environment

Provide for easy movement of the NCC halves or Ensure that the NCC clears the beam pipe for all positions of the CM Flanges, supports, bigger diameter or Have the supports mounted to the NCC itself

connections and signal paths

silicon strips and pads Silicon strips 5x8 and 5x5 cm 256 strips 200 um pitch Silicon pads 252 pads (12 cols, 21 rows) 2x2 - 6x6 mm double metal traces lay over pads simplify connections Incur few % crosstalk

silicon to kapton cable Dry adhesive was used to bond Silicon to Kapton Wire bonds were encapsulated in black potting material (clear potting cured but stayed more sticky) cannot inspect bonds visually

kapton cables 6, 8, 14, 19 cm long 0.05mm Kapton Traces: 0.005mm Cu (x.5 area) Ground: 0.005mm Cu (x.1 area) Kapton cables The extreme thinness and the (almost) absence of shielding ground planes was driven by the requirement to keep the mass facing the central arms low.

noise pickup in thin cables Fatal noise levels in the strip detectors Si MCM Do system tests early

MCM 19 chips: 8 32-channel preamp / discriminators, 8 32-channel AMU / ADC, 2 Xilinx, 1 opamp in a 5x5cm package. Produces a digital data packet. MCM  Low yield, but the ones that worked never failed  Discriminator never worked  Xilinx programming proved a vulnerability Need more time for ASIC development have Xilinx programmer in-house

output cable 50 traces, 0.5mm pitch, controlled thickness and width Analog, digital, reference voltages, 10, 40 MHz clocks, serial controls, data out. Output cable

MCM to power/comm board Power/comm board ZIF connectors, Elco 0.5mm pitch. Rated for 50 open/close, good for much more Vertical spacing to << 0.5mm Limited space, so made custom tools for opening/closing ZIF connectors 160-pin JAE

power/comm to motherboard Board spacing 9mm Fixture to hold and push up to pin connectors Trace density in vicinity of the 160-pin connectors forced the motherboard to be 14-layer

motherboard to cables The diameter of the MVD enclosure (60 cm) was determined by the area taken up by the cable connectors, not by the actual Si detectors. Keeping moist air out is necessary if you run the detector below the dew point. Some connectors were very leaky, and required insulating foam barriers. Signal cables were.05” pitch solid-core ribbons, vulnerable to bending failure. Strain relief clips were iron and not used because of the mag. field Cables are flexible, bundles are not (recall the yearly uninstall / reinstall) Connectors were on a surface that was not accessible after installation. Need ALL components designed before starting mechanical design

downstream electronics Downstream electronics was badly designed and unsupported by the designers.  AIM - Arcnet Interface module: arcnet fiber to copper  TCIM - Timing and Control Interface Module: mode bits fiber to copper  DCIM - Data Collection Interface Module: data demultiplexing, multiplexing module, copper to fiber Needed more development time Need system tests, not just single boards Need designers to remain on the team (long enough) Xilinx programmers on the team

conclusions Need to do complete system tests early Need electronics systems engineer on the project Need designers to remain on the project Need more lead time for many components (Other than the ones I’ve already marked)