ALOS-2 Mission Status and Basic Observation Scenario (BOS)

Slides:



Advertisements
Similar presentations
Environmental Application of Remote Sensing: CE 6900 Tennessee Technological University Department of Civil and Environmental Engineering Course Instructor:
Advertisements

NovaSAR-S: A Low Cost Approach to Applications
Forest Carbon Tracking – Canadian Space Agency Update Science and Data Summit - 4 Sydney, Australia February, 2013 Yves CREVIER
Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programme SDCG-6 | 23 October 2014 | Oslo The European Copernicus Programme.
ReCover for REDD and sustainable forest management EU ReCover project: Remote sensing services to support REDD and sustainable forest management in Fiji.
Folie 1 Performance Investigation on the High-Resolution Wide-Swath SAR System Operating in Stripmap Quad-Pol and Ultra-Wide ScanSAR Mode DLR - Institut.
SDCG-6, Oslo, Norway – Oct of 18 SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission Mission update 2014 and outline of the Global Background.
SAOCOM Mission Update Laura Frulla CONAE 1.
SDCG-6 Oslo, Norway October 22-24, 2014 SDCG-6 Session 7 JAXA contributions to R&D Support strategy ( Element 3)
DLR IPY Data Portfolio: TerraSAR-X High Resolution SAR Data from Space Erhard Diedrich Head of Division International Ground Segment DLR – German Remote.
Remote Sensing of Mesoscale Vortices in Hurricane Eyewalls Presented by: Chris Castellano Brian Cerruti Stephen Garbarino.
Mission updates RADARSAT CONSTELLATION MISSION
Canadian Space Agency IPY Planning Yves Crevier Canadian Space Agency Space Task Group – IPY Sub-Committee on Observations SAR Coordination Meeting, March.
ESA UNCLASSIFIED – For Official Use SENTINEL-1 OVERVIEW AND RELATED ACQUISITION PLANS: FORESTS AND AGRICULTURE Johannes Roeder / Pierre Potin ESRIN 26/02/2014.
SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission Mission update 2014 and outline of the Global Background Mission Laura Frulla CONAE CEOS SDCG-5.
Page 1 IGARSS, Denver, July 31-Aug 4, 2006 Sentinel-1 Mission Concept Malcolm Davidson, Evert Attema, Bjorn Rommen, Nicolas Floury, Laura Moreno Patricio,
SDCG-4, Pasadena, CA/USA September 4-6, 2013 SDS-4 Session 2 Mission updates ALOS-2 JAXA Masanobu Shimada.
Uses of Geospatial Soils & Surface Measurement Data in DWR Delta Levee Program Joel Dudas
IGARSS’11 Compact Polarimetry Potentials My-Linh Truong-Loï, Jet Propulsion Laboratory / California Institue of Technology Eric Pottier, IETR, UMR CNRS.
Henri Laur, IPY Space Task Group SAR meeting, 5-6 March 2008 Since 20+ years, ESA is increasingly supporting the Cryosphere communities with the provision.
Space Data Coordination Group Meeting 2 Reston (VA), USA September 2012 European Space Agency Frank Martin Seifert Earth Observation Programme ESRIN,
Slide: 1 CEOS SDCG-2 Meeting|Reston, Virginia, USA| September 2012 CEOS Data Acquisition Plan – Global Baseline strategy (Level 1) BAU plans and.
COSMO-SkyMed Products and Services
Page 1 ASAR Validation Review - ESRIN – December 2002 ASAR Validation Review Introduction B. Rosich ESA-ESRIN ASAR C.P. Objectives Challenges in.
Polar Topographic Knowledge Prior to LCROSS Impact David E. Smith 1, Maria T. Zuber 2 1 NASA/Goddard Space Flight Center 2 Massachusetts Institute of Technology.
JAXA input to the IGOS-P Integrated Global Observations of the Land (IGOL) Theme Ake Rosenqvist, Chu Ishida Japan Aerospace Exploration Agency (JAXA) Earth.
DOCUMENT OVERVIEW Title: Fully Polarimetric Airborne SAR and ERS SAR Observations of Snow: Implications For Selection of ENVISAT ASAR Modes Journal: International.
Session 10: Space Data Support to GFOI R&D DLR Contributing Data Stream Report SDCG-7 Sydney, Australia March 4 th – 6 th 2015 Helmut Staudenrausch, DLR.
Frank Martin Seifert EO Science and Applications Division ESA Earth Observation Programme SDCG-8 | 23 September 2015 | Bonn Sentinel-1 and -2 Core Data.
SHIP DETECTION USING X BAND DUAL-POL SAR DATA S. Angelliaume (ONERA) Ph. Durand, J.C. Souyris (CNES)
CEOS 4 th SDCG Meeting DLR contribution Dr. Helmut Staudenrausch DLR Space Administration, Earth Observations Chart.
Slide: 1 CEOS SDCG-2 Meeting|Reston, Virginia, USA| September 2012 CEOS Data Acquisition Plan – Global Baseline strategy (Level 1) EO monitoring.
Global Forest Observations Initiative (GFOI) Overview Frank Martin Seifert, ESA SDCG-8 Commercial Providers Day, Bonn, 23 September 2015.
Mission updates 1 RADARSAT CONSTELLATION MISSION Canadian Space Agency Yves Crevier
1 IICWG, October 2007 RCM Capabilities for Ice & Sea-Ice Applications IICWG … G. Séguin, R. Girard, Y.Crevier.
Synthetic Aperture Radar Specular or Bragg Scatter? OC3522Summer 2001 OC Remote Sensing of the Atmosphere and Ocean - Summer 2001.
- JAXA Agency Report - Osamu OCHIAI JAXA/EORC WGISS#18, SG#17 Sept. 6-10, 2004.
Comparison of L and P band radar time series for the monitoring of Sahelian area P.-L. Frison, G. Mercier, E. Mougin, P. Hiernaux.
SDS-4 Session 2 Mission updates 1 RADARSAT CONSTELLATION MISSION Canadian Space Agency Yves Crevier SDCG-4 Pasadena, CA September.
The European Copernicus Programm and the Sentinels Wolf Forstreuter for Frank Martin Seifert EO Science and Applications Division ESA Earth Observation.
Shell SAR R&D Study for ice operations
Environmental Remote Sensing GEOG 2021 Lecture 8 Observing platforms & systems and revision.
Session Introduction Session 7: Baseline Global Observation Scenario SDCG-7 Sydney, Australia March 4 th – 6 th 2015.
The Pacific GIS/RS User Conference Suva, Fiji Island, November 2012 Sharon R. Boe, SPC/GIZ-SOPAC ) SPC/GIZ Regional REDD+ Project:
SDCG-6 Oslo, Norway October 22-24, 2014 Baseline Strategy Update for SIT-30 SDCG-6 Session 6: Baseline Strategy Update Element-1 Strategy.
Department of National Defence Canada POLAR EPSILON AND CANADIAN MDA J.K.E. Tunaley Directorate of Space Development.
Conception of a global SAR mission for land imaging on the tropics Gilberto Câmara Director General National Institute for Space Research (INPE) Brazil.
Time Dependent Mining- Induced Subsidence Measured by DInSAR Jessica M. Wempen 7/31/2014 Michael K. McCarter 1.
Forming InSAR products from RADARSAT-2 data -santhosh.
Laura Candela, Anna Rita Pisani, Simona Zoffoli SDCG-9 Session #8 ASI contributions to R&D Support strategy ( Element 3) – Status update SDCG-9 ESA ESRIN,
Commercial Space-based Synthetic Aperture Radar (SAR) Application to Maritime Domain Awareness John Stastny SPAWAR Systems Center Pacific Phone:
Agency, version?, Date 2014? [update filed in the slide master] Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the.
Calibration activities of ALOS-2 PALSAR-2 1 ○Takeshi Motohka Masanobu Shimada, Yukihiro Kankaku, Shinichi Suzuki Japan Aerospace Exploration Agency (JAXA)
Overview of NovaSAR September 2016.
Forest Early Warning System in the Tropics
Canadian Space Agency Contribution to the SDCG Element 3 Component
Identifying Forest Change with SAR
Overview of NovaSAR.
SAOCOM PROJECT a joint Argentine-Italian SAR-L Mission
Japanese perspective on GIIPSY Jinro Ukita (Chiba University)
Objectives Using a time series of data from radar sensors to detect and measure forest changes Combining different types of data, including: Multi polarisations.
Sentinel-1 Mission Status
JAXA Earth Observation Programs
ISRS2007, Lamada Plaza Hotel, Jeju, Korea, 31 October - 2 November 2007 Radargrammetry of High-Resolution Synthetic Aperture Radar A Theoretical Study.
A Presentation by Shane Doddridge
Soil Moisture Active Passive (SMAP) Satellite
Access & Uptake of Sentinel Data
이훈열, 조성준, 성낙훈 강원대학교 지구물리학과 한국지질자원연구원 지반안전연구부
POLARIMETRIC OBSERVATION FOR RICE FIELD BY RADARSAT-2 AND ALOS/PALSAR
Forest / Non-forest (FNF) mapping for Viet Nam using PALSAR-2 time series images 2019/01/22 Truong Van Thinh – Master’s Program in Environmental.
Presentation transcript:

ALOS-2 Mission Status and Basic Observation Scenario (BOS) + relevance for Ag Masanobu Shimada, Shin-ichi Sobue, Shinichi Suzuki, Fumi Ohgushi, Hiroki Nishi, Kaoru Tsuzuku, Tomohiro Watanabe, Ake Rosenqvist GFOI SDCG#5 Frascati, Italy, Feb 24-26, 2014

ALOS-2 Mission Status . On Feb 19, 2014, ALOS-2 received formal "GO" for launch ALOS-2 scheduled for launch in 2014 A global systematic acquisition strategy (“Basic Observation Scenario” – BOS) has been developed The ALOS-2 BOS will provide continuity of acquisitions with the acquisition strategy of ALOS (2006-2011), but with enhanced image characteristics (spatial resolution, polarisations, radiometric sensitivity). The ALOS-2 Data Policy will remain the same as ALOS, but with lower prices. Increase prio 1 polygon from N60 to N70 deg

ALOS-2 ALOS-2 Specifications . Solar paddles SAR antenna ALOS-2 satellite Launch : 2014 Orbit type : Sun-synchronous Altitude : 628 km +/- 500 m (for reference orbit) Revisit time : 14 days LSDN : 12:00 +/- 15 min PALSAR-2 L-band Synthetic Aperture Radar Active Phased Array Antenna type two dimensions scan (range and azimuth) Antenna size : 3m(El) x 10m(Az) Bandwidth : 14 – 84MHz Peak transmit Power : 5100W Observation swath : 25 – 490km Resolution : Range: 3 m to 100 m Azimuth: 1 m to 100 m Increase prio 1 polygon from N60 to N70 deg X Y Z Solar paddles SAR antenna

ALOS-2 Specifications . Main applications: Spotlight Ultra Fine High sensitive Fine ScanSAR nominal wide Bandwidth 84MHz 42MHz 28MHz 14MHz Resolution Rg×Az: 3×1m 3m 6m 10m 100m 60m Swath Rg×Az: 25×25km 50km 70km 350km (5-scan) 490km (7-scan) Polarization SP SP/DP SP/DP/FP/CP NESZ -24dB -28dB -26dB -23dB S/A Rg 25dB 23dB 20dB Az Increase prio 1 polygon from N60 to N70 deg SP : HH or VV or HV , DP : HH+HV or VV+VH , FP : HH+HV+VH+VV , CP : Compact pol (Experimental mode) Main applications: Fine beam (DP): Forest and land cover monitoring ScanSAR (DP): Rapid deforestation / wetlands / InSAR (ScanSAR-ScanSAR) Spotlight (SP): Emergency observations Ultra Fine (SP) : Global map, InSAR base mapping High sensitive (QP): Global map ScanSAR wide (SP) : Polar ice

ALOS-2 Observation plan (BOS) of relevance for Agriculture (as of February 2014)

ScanSAR regular monitoring: Pan-tropical (incl Asia-RiCE) Temporal repeat: 9 cov/year GSD: 100 m (off-nadir 26.2°-41.8°) Mode: ScanSAR 350km Dual-pol (HH+HV) Wetlands and rapid deforestation monitoring needs more frequent covering with ScanSAR dual polarization.

Forest monitoring: Pan-tropical (incl Asia-RiCE) Temporal repeat: 6 cov/year GSD: 10 m (off-nadir 28.2°-36.2°) Mode: Stripmap Dual-pol (HH+HV/28MHz) Forest monitoring needs frequent covering with 10m resolution with dual polarizarion.

Global baseline: certain additional Ag coverage Temporal repeat: 2 cov/year GSD: 10 m (off-nadir 28.2°-36.2°) Mode: Stripmap Dual-pol (HH+HV/28MHz) Following pages show target area, frequency and imaging mode for each applications . Baseline mapping is common observation including deformation and forest monitoring. Prio 1 Prio 2

* 3 years required for global coverage in 3m mode Global land areas – VHR baseline mapping Temporal repeat: 1 cov/ 3 years GSD: 3 m (off-nadir 29.1°-38.2°) Mode: Stripmap Single-pol (HH/84MHz) Very High Resolution Mapping with 3m resolution covers global areas for every three years. 1st year 2nd year 3rd year Prio 1 Prio 2 * 3 years required for global coverage in 3m mode

* 5 years required for global coverage in 6m QP mode Global Quad-pol baseline: Asia-RiCE & Pampas annually Temporal repeat: 1 cov/ 5 years GSD: 6 m (off-nadir 25.0°-34.9°) Mode: Stripmap Quad-pol (HH+HV+VV+VH) Quad polarimetry with 6m resolution covers global areas for 5 years. 1st year 2nd year 3rd year 4th year 5th year Areas observed every year * 5 years required for global coverage in 6m QP mode

Observation pattern for annual acquisitions* Super sites (TBD) * 3m SP and 6m QP modes require 3 and 5 years for global coverage 11

SUMMARY – PALSAR-2 obs of relevance for Ag Pan-tropical, incl. Asia-RiCE regions ScanSAR (100 m HH+HV) 9 times/year (every 42 days) Desc: Jan + Feb + Mar/Apr + May + Jun + Jul + Aug/Sep + Oct + Nov Fine Beam (10 m HH+HV) 6 times/year Asc: Jan/Feb + Jun/Jul + Aug/Sep + Nov/Dec Desc: March-June (14-day InSAR pair) Quad-pol (6 m QP) 1 time/year Asc: March-May window

Grazie ありがとう。 GFOI SDCG#5 Frascati, Italy, Feb 24-26, 2014