Visit us at E mail: Tele: +91-79-2656

Slides:



Advertisements
Similar presentations
AWARENESS OF ISO 9000 (2000) By C. Das Additional Director
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Understanding the Requirements Qimpro Standards Organization
Draft BY QI organization June 2014
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
Quality Standards Mö/ Folie 1 Quality Management Certification and Accreditation ICEL Quality Standards Application: Quality Management Certification.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
22000 Food Safety Management Systems
1 Quality Management Standards. 2 THE ISO 9000 FAMILY ISO 9000: 2005 Identifies the fundamentals and vocabulary for Quality Management Systems (QMS) ISO.
The ISO 9002 Quality Assurance Management System
Quality Management System
Quality Management Systems Chapter 10. Introduction ISO- International Organization for Standardization Founded in 1946, in Geneva, Switzerland Main function.
Chapter 10: Quality Management Systems Jennifer Sadorus Heather Heller.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
ISO 9001:2000 Intro Presented By: Brad D. Agenda Overview of QMS Fundamentals ISO 9001:2000 Overview & Requirements.
ISO 9000 Certification ISO 9001 and ISO
4. Quality Management System (QMS)
ISO 9000 Implementation Imran Hussain.
4. Quality Management System (QMS)
Visit us at E mail: Tele:
Measurement System Analysis (MSA) Discussions at CSIR S.A
OAS REGIONAL PROJECT QUALITY MANAGEMENT. What percentage of time in the work day do you have to devote to solving PROBLEMS? - ours or someone else´s (suppliers,
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
13th &14th July 2010 Gaelle Rousseau-Lamour
Quality Management System
Quality Management Systems P.Suriya Prakash Final Mech Vcet
The Role of the Internal Auditor for Maintaining System Compliance and Promoting Continuous Improvement Wayne M. Uttke
ISO 9000 and Public Awareness and Information Session 22 February 2006 Owen Glave, MBA-TQM.
Visit us at E mail: Tele: www.globalmanagergroup.com.
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
Software Quality Assurance Lecture 4. Lecture Outline ISO ISO 9000 Series of Standards ISO 9001: 2000 Overview ISO 9001: 2008 ISO 9003: 2004 Overview.
Introduction to ISO 9001:2000.
Copyrights I Global Manager Group | Revision 0.1 Feb 2009 | 1 GMG DEMO OF ISO: ENERGY MANAGEMENT SYSTEM AUDITOR TRAINING PRESENTATION KIT.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Visit us at E mail: Tele:
QUALITY MANAGEMENT STATEMENT
Company Confidential Registration Management Committee RMC Auditor Workshop Charleston, SC July Supplemental Oversight AS9104/2A & Special.
Visit us at E mail: Tele:
ISO 9001:2000 The 5 Phase Plan to Implementation Sterling, VA Terry & Associates Quality.
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay The Deming Chain Reaction Improve quality Productivity improves Capture the market with better.
ISO Registration Common Areas of Nonconformances.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
organization – status 2015 – scheme – integrity program – strategy
The common structure and ISO 9001:2015 additions
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
1 Quality Management Z SUZSANNA E SZTER T ÓTH R ITA D ÉNES Department of Management and Corporate Economics 1 March 2016.
Visit us at E mail: Tele:
What is ISO? ISO is that the world’s largest developer of voluntary International Standards. International Standards provide state of the art specifications.
Awareness program on ISO/TS16949:2002
Quality Management Systems: Elements, implementation of documentation
External Validation of Quality Programs
UNIT V QUALITY SYSTEMS.
Identification of Processes Turtle Diagrams Approach
Quality Management Systems – Requirements
Managing Supplier Quality
ISO 9000 Dr. S. Thomas Foster, Jr..
Identification of Processes Turtle Diagrams Approach
How to conduct Effective Stage-1 Audit
TS Training Presented by: Internal Auditor Training.
ISO-9001:2000 Quality Management Systems
External Validation of Quality Programs
Identification of Processes Turtle Diagrams Approach
ISO 9001:2000 Management System Overview
Identification of Processes Turtle Diagrams Approach
Quality Systems ISO 9000 Series QS-9000 TE-9000 AS9000
Presentation transcript:

Visit us at E mail: Tele:

Visit us at E mail: Tele: Advantages of TS 16949:2002 The main advantage of acquiring ISO/TS 16949:2002 is to do away with multiplicity of standards (Includes financial benefits too). Also ISO/TS is recognized world-wide as it is an ISO standard. It is also supported by JAMA Many OEMs strongly recommend the suppliers to go in for ISO/TS 16949:2002 GM, daimler,chrysler and Ford has urged their suppliers to upgrade to ISO/TS 16949:2002 at the expiration of their current QS 9000 certification and no later than 14 december, 2006 Daimler chrysler vide letter dated july 2002 had given a deadline of july 1, 2004 for ISO/TS 16949:2002 up gradation Contd……….

Visit us at E mail: Tele: IATF Following are the major tasks of IATF Develop and update the IATF certification rules which includes: –Criteria for CB recognition –Certification body processes –Certification auditor qualification –Certification content requirements Each oversight office is also responsible for –Scheduling witness audits for CB –Monitoring the CB –Monitoring CB auditors –CB Auditor qualification and training

Visit us at E mail: Tele: Audit process: For OEM vehicle assembly, “Contract Review “ and the “ Contract “ are represented by the internally documented marketing requirements for vehicle brand, mix and volumes. Scope of certification includes all the products supplied to customer subscribing to the certification to ISO/TS 16949:2002 Supporting functions on site or, e.g.- engineering, marketing, purchasing, warehouse; are included. The audit plan is based on the processes of the organization and includes all the requirements of organization quality management system to meet automotive customer needs, even when they exceed ISO/TS 16949:2002 based requirements Consultants to the organization cannot participate in the audit. RULES FOR ACHIEVING IATF RECOGNITION – TS 16949:2002

Visit us at E mail: Tele: Top management provides evidence of its commitment to the development. Implementation and continual improvement of the effectiveness of the quality management system by: a)Communicating to the organization the importance of meeting customer as well as regulatory and statutory requirements. b)Establishing the quality policy c)Ensuring the quality objectives are established d)Conducting management reviews e)Ensuring the availability of resources 5.1 Management commitment 5. Management responsibility

Visit us at E mail: Tele: Product based elements Clause 7 – product realization ISO 9001 : Product and service provision Control of production and service provision Validation of process for production and service provision Identification and traceability Customer property Preservation of product ISO / TS : Control plan Work instruction Verification of job set – ups Preventive and predictive maintenance Management of production tooling Production scheduling Feedback of information From service Service agreement with customer

Visit us at E mail: Tele: The organization use the multidisciplinary approach to prepare for product realization, including;  Development / finalization and monitoring of special characteristics,  Development and review of FMEAs, including actions to reduce potential risks, and  Development and review of control plans. Note : Multidisciplinary approach typically included the organization’s design, manufacturing, engineering, quality, production and other appropriate personnel Multidisciplinary approach 7.3. Design and development

Visit us at E mail: Tele: Design and development validation performed in accordance with planned arrangements, to ensure that the resulting product is capable of meeting the requirements for the specified application or intended use, where known. Wherever practicable, validation is completed prior to the delivery of implementation of the product. The records of the results of validation and necessary actions are maintained Note  1 The validation process normally includes an analysis of field reports for similar products. Note  2 The requirements of & above apply to both product and manufacturing processes. ** Design and Development Validation 7.3. Design and Development

Visit us at E mail: Tele: Process approach All well-defined and well-managed processes have common characteristics: A well-defined team with a leader is held accountable for how well the process performs (the process owner) Well defined boundaries (the process scope) Well defined interfaces and responsibilities Well documented procedures, work instructions and training Well defined measurement and feedback controls Customer related measurements and targets Well known cycle times

Visit us at E mail: Tele: List of records Document updating records (master list of documents) Control of quality records and master list of records Management reviews Record of training and skill and competency of personnel Maintenance (preventive, predictive and breakdown) record Process monitoring data (PPAP, APQP, FMEA, MSA, SPC) and corrective action taken for process control Record of product non-conformities and products accepted on concession. Data analysis and activities for continual improvement. Result of internal audits and follow-up action. Data on customer feedback / satisfaction measurement and action taken on customer complaints. Vendor evaluation / audit and purchase orders and actions arising from the evaluations Customer property that is lost, damaged or otherwise found to be unsuitable for use RECORDS REQUIRED BY ISO/TS 16949:2002

Visit us at E mail: Tele: STEPS FOR INSTALLATION OF ISO/TS 16949:2002 FOR AUTOMOTIVE PRODUCTION AND RELEVANT SERVICE PART ORGANIZATION *Conduct awareness program (top + middle + bottom level). *Form a steering committee and task force for documentation *Identify and define processes and process approach *Define quality policy and establish quality objectives *Prepare documents of quality management system. *Implementation and train all personnel for use of procedures, processes, work instructions and formats. *Train internal auditors and prepare list of qualified / certified internal auditors. *Assess the system through first internal audit. *Take corrective actions for non-conformities. *Apply for certification. *Assess the system through second round of internal audit. *Avail pre-certification audit of certifying body *Take actions on suggestions given by certifying body. *Final registration / certification audit by certifying body.