Grandview Beach Association Spring Meeting March 20, 2006.

Slides:



Advertisements
Similar presentations
Carmel River Lagoon Update A presentation to the Carmel Point and Lagoon Preservation Association Monterey Peninsula Water Management District Status of.
Advertisements

Managing Development in the Coastal Zone, Federal Policy II: Coastal Zone Management Act; Slide 29.1 Session Name: Managing Development in the Coastal.
JUNE FLOODS AND STORMS Preliminary Damage Assessment Brief
Impacts of Acquisition Lincoln Park, NJ Case Study Mary Shaw, PhD, AICP, CFM Jen Sparenberg, CFM.
Essex Region Conservation Authority Brad Arsenault & Kaylyn Boyd.
Interested in Neighbourhood Planning in Cotswold District?
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
Decision/Evaluation Methodologies Physical modelling (hydrologic, Hydraulics, ecological suitability) Simulation models (Shared Vision Planning) Optimization.
ICMP Public Meeting February 18 th, 2011 February 18 th, 2011.
Adaptation Action Areas Jim Murley South Florida Regional Planning Council AAA Workshop, August 28, 2014.
FloodSAFE – how one local agency works to keep its levees and public safe Ann Draper, Assistant Operating Officer National Levee Safety Summit, St. Louis.
TRLIA Certification of Environmental Impact Report and Selection of Project for Feather River TRLIA Board Meeting: February 6, 2007 Briefer: Paul Brunner,
Clarence Cannon Dam and Mark Twain Lake Flood Control – damage reduction Navigation Hydropower Recreation Water supply Fish and Wildlife Conservation.
Flood Avoidance and Mitigation
Citrus County Planning Division Evaluation and Appraisal Report Citrus County Comprehensive Plan.
Wabash River Restoration and Reclamation Project.
CLIMATE CHANGE AND POTENTIAL IMPACTS ON GREAT LAKES WATER LEVELS WHAT CAN WE DO? Chicago, Illinois March 30, 2001 Presentation By: Wayne A. Smith Vice-President.
Climate Change Impacts
GREAT LAKES WATER MANAGEMENT UNDER A CHANGED CLIMATE FRANK H. QUINN Great Lakes Environmental Research Laboratory Ann Arbor, Michigan.
Presentation to the Workshop Climate Change and Great Lakes Water Levels March 30, 2001 Chicago, Illinois Gerald E. Galloway, Jr., P.E., Ph.D. International.
MORE INFORMATION ON GLOBAL EFFECTS Source: The Woods Hole Research Center.
That Is The Question? By Rob Lowman STS Module On Human Impact on Lakes and Rivers and our Environment! 8th Grade Science Earth’s Changing Surface You.
Knowledge on HIA IN CAMBODIA Constructing a Caring and Sharing Community Roles of HIA 4-6 October 2012 Bangkok.
Proposed Benefit Assessment District Overview Three Rivers Levee Improvement Authority (TRLIA) TRLIA.ORG March 10,
International Lake Ontario – St. Lawrence River Study New Study Release Today Study Board Offers Three New Options for Regulating Water Flowing From Lake.
Climate Change Impacts and Adaptation: A View from Canada Scotland and Climate Change Getting it Right: International Perspectives on climate change and.
Three Rivers Levee Improvement Authority (TRLIA) Briefer: Mary Jane Griego, TRLIA Board Member Three Rivers Levee Improvement Authority March, 2007.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Oconee County Hazard Mitigation Plan Update Kickoff Meeting Brian Laughlin Hazard Mitigation Planner Georgia Emergency.
Water Supply Planning Initiative State Water Commission November 22, 2004.
An Update 1 August 4,  The proposed hydro generating station at Bala Falls remains front and centre as an issue of concern to residents and cottagers.
Alfred’s 2015 Comprehensive Plan update: shaping our future environment Justin Grigg: Mayor, Village of Alfred Kier Dirlam: Director of Planning, Allegany.
Improving Lives, Communities and the Environment Through Natural Resources Conservation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
Our Mission MITIGATIONS. MEANING OF MITIGATION MITIGATION IS THE PERMANENT REDUCTION OF THE RISK OF DISASTER MITIGATION IS THE PERMANENT REDUCTION OF.
FISCAL YEAR Discussion on Mid-Year Budget Adjustment: SAN JOAQUIN COUNTY DELTA ACTIVITIES 1 Tom Gau, Interim Director San Joaquin County Department.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
Joint Lake Superior Regulation Task Team – Study Board Meeting #16 September 20-21, 2010 Lake Superior Regulation Task Team Meeting #10 September 20-21,
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Exceptional Events Rulemaking Proposal General Overview March 1, 2006 US EPA.
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
City of Santa Rosa Hazard Mitigation Plan Project Kickoff.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
Land Use Planning in Oroville: How is the Community Thinking? Presenter: Chris Branch Community Development Director City of Oroville Ph:
Managing Through Partnerships Ralph Cantral NOAA’s Ocean Service September 5, 2003.
Flooding. A Spring Green Community Forum Flooding in Spring Green: A Community Forum We have listened very closely to your concerns, questions and issues.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
111 Right for Yerington. Right Place. Right Time. Right People. Right Way. Proposed Acquisition of BLM-Administered Land To Transfer to the City of Yerington.
111 Right for Yerington. Right Place. Right Time. Right People. Right Way. Proposed Acquisition of BLM-Administered Land To the City of Yerington.
“State Road 100 MPC Lots” Comprehensive Plan Amendment & Rezoning City Council Public Hearing November 17, 2015.
57th Annual Meeting of the GLFC Buffalo, NY June 6-7, 2012 Water Level Regulation in the LO/SLR System Environmental Considerations and Plan BV7.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
Climate Change Adaption for At Risk Communities Hal Shepherd Water Policy Consulting, LLC (907)
Back River Flooding and Shoaling Citizens Committee Back River Flooding and Shoaling Citizens Committee August 15, 2007.
Economic Analysis Watershed Rehabilitation Workshop St. Louis, MO August 20-22, 2002 Dale Pekar, Economist National Water Management Center
Welcome to the Libertyville Stormwater Master Plan Open House
Savannah River Projects
Parks and Recreation Commission
Continuing Authorities Program
Planning Commission Hearing
36 CAs across Ontario (mainly in the south)
4.2.1 Conflicts of interest between people involved in the uses of outdoor environments.
Preparing for NFIP Reauthorization Washington, D.C.  September, 2016
FISCAL YEAR Discussion on Mid-Year Budget Adjustment:
Exceptional Events Rulemaking Proposal
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

Grandview Beach Association Spring Meeting March 20, 2006

LOSL Study Decision Guidelines Contribute to ecological integrity Maximize net benefits No disproportionate loss. Mitigation alternatives may be identified to limit damages when considered appropriate. Eliminate disproportionate loss (any adopted plan not to be implemented until the mitigation implementation measures are in place). Flexible in recognition of unusual or unexpected conditions Adaptable to climate change and climate variability. Decision-making will be transparent and representative Adapt to future advances in knowledge, science and technology.

Equity there still is no equity between loss of personal property, i.e. a family’s home and land, and the inability to use a recreational boat. They had been put on same plane for Study but never quantified in importance.

Equity- Continued The following was obtained from NYS Governor Pataki’s Web site regarding the Hydroelectric Dam at Massena: The relicense of dam continues to provide low cost power to surrounding areas. $10.5 million to surrounding areas for High Water Flow Adjustment $115 million for community enhancements in Towns of Massena, Louisville, Waddington, Lisbon and villages of Massena and Waddington and the school districts of Massena, Lisbon, Madrid-Waddington and St. Lawrence County. $23 million for the St. Lawrence Aquarium $12 for improvements at local state parks $8 million for parks in Massena, Louisville, Waddington and Lisbon. $66 million for fish and wildlife habitat improvements $300,000 for boat docks and picnic area improvements on Galop Islands State Park

High Water Impacts

Emergency Deviations These thresholds can be defined as extreme water level and flow occurrences approximating 1:100 year exceedance probability events, or by known physical limitations or response functions of the system, for example Lake Ontario and St. Lawrence River water level conditions at which significant shoreline damages occur, or levels beyond which environmental benefits may not continue to accrue depending on recent occurrences of high- or low-water level events. The Study Board suggests that in the event of a 50% probability that the thresholds listed in Table 15 will be exceeded, the International St. Lawrence River Board of Control evaluate the effects of deviating from plans flows and implement appropriate water management strategies, with the express concurrence of the Commission.

Wind & Wave Action At ft April 1993

Residential Flooding At ft. April 1993

DateWater LevelEffect 4/7/ " diameter Sewer Interceptor along shoreline serving towns of Webster and Irondequoit undermined and threatened with breach. Major environmental problem 4/7/ Brockport Drinking Water Treatment plant serving 35,000 homes. Below grade clearwells threatened with lake contamination. 4/7/ Greece Drinking Water Treatment plant threatened within 6” of flooding in transformer station. Plant serves approx 1 million people in Monroe, Orleans, Wayne, Ontario, and Genesee counties including Batavia NY. 4/7/ $2 million dollars in damage to road infrastructure in Monroe County 4/7/ Lake Waves at Hamlin Beach State Park- $800, in damages 5/5/97247Governor requests Advance Measures Program from USACE

Coastal 75.2 ( ft.) Max. Lake Ontario - Coastal 74.7 ( ft.) Max. May through August November through February

Concerns about Environmental Science.

Other concerns Since the development of the projects in the 1950’s on the St. Lawrence were built the system has became controlled by man. Saying that we will take it back to conditions seen prior to regulation is not be practical due to the development that has also occurred based on criteria that have been in effect since that time. Development both public and private has been based on 4 ft range. Changing the present Orders of Approval, which guaranteed certain conditions to those recognized interests including riparians, could be in conflict with the treaty due to damages that will occur. The Study’s results are only hypothetical. They are not a proven theory and as such need to be tested before enacted and damages inflicted.

The PIAG’s principal objective was to ensure that the results of the Study considered the interests and “natural knowledge” of the public. When we told plan formulators that certain levels particularity in spring months cause problems. This effort had no affect on the proposed plans. Other concerns- cont.

Historic vs. 58DD

50,000 stochastic lelves

A B D Post 1960 Pre-1960

247.04/ / /

247.04/ /

Quality of Life????? Future view of Lake Ontario from the South Shore

Final Thoughts 1.At IJC meetings this year, please don’t let environmental groups have final word. We let our elected officials speak for us last summer and this did not have same weight as individuals speaking for themselves. Please stay and make comments even if it takes some time to get to microphone. 2.Call or write your Federal Representative. We live in Congresswoman Louise Slaughter’s district but many of us work in Congressman Tom Reynolds’ district. A problem with with our homes would affect many businesses! Congresswoman Louise Slaughter, 3120 Federal Building, Rochester, NY, 14614, Telephone # Congressman Tom Reynolds, 1577 W. ridge Rd., Rochester, NY 14615, Telephone # Don’t be confused by terminology. The environmental groups were misleading last summer when they said there would be lower lows with their preferred plan, Plan B) it lower end is higher than present plan. They want a lower high(mid summer)level. Around 245.5ft. Very bad for recreational boaters.

Final Thoughts Page Two Ideas for letters: Why was first floor flooding only economic evaluated for damages. Wave induced damages was not evaluated. What will be effect on FEMA flood insurance if operating range changed? Question was asked numerous times to no avail. Why was not value of properties used for damages? Only cost of shore protection. Also damages to private property without shore protection not part of economics. Public lands tax payer financed also not included it is assumed that erosion of this land is source of beach sand and has no value. Present breakwalls and houses built to present standards. If changed how will costs be paid to rebuild to new standards.