Week 4. SME Weirdness There will be no class from the week of Feb. 16 to 20 th Your report on this work load will be presented on Tuesday Feb. 24 th This.

Slides:



Advertisements
Similar presentations
Basic Time Management Principles
Advertisements

Running MSOPIT for Assignment #6 These Slides are Base on MS3D version 4.6 which was current in Sept. of 2009 Note – These slides contain concepts also.
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
Week 9. COAL Things Missed Last Week Show a map of your #6 coal and areas where you will have to cut roof rock because of your CM selection Show a year.
Job choices.
© 2010 Prentice Hall Business Publishing, College Accounting: A Practical Approach, 11e by Slater Calculating Pay and Payroll Taxes: The Beginning of the.
Unit 2 Chapters 6, 8 & 9.  Chapter 7 is taxes  Cover close to tax time  6, 8 & 9 will have more terms  Will be responsible for these terms.
Surface Mining Ore Deposit Grades ©2011 Dr. B. C. Paul Note- The information contained in these slides is considered common knowledge to those schooled.
Controlling Labor Costs
Health System Reform © Allen C. Goodman, Major Themes Lower costs, or lower growth in costs. Provision of (more) equitable access to care for.
Managing your Personal Finances Unit 1: Calculating Gross Pay, Deductions and Net Pay Mr. Eleuteri C114.
Chapter 9 Pricing Construction Equipment. Objectives Upon completion of this chapter, you will be able to: –Identify the three main equipment categories.
Leaders Manage Employee Work Schedules
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
PAYCHECKS, PAY PERIODS, TYPES OF PAY. Pay Periods In order to understand your paycheck, you need to understand pay periods. How often you get paid.
Decision Making in Finance: Future Value of an Investment
Meeting Workshift Standards
6-0 Week 3 Lecture 3 Ross, Westerfield and Jordan 7e Chapter 6 Discounted Cash Flow Valuation.
Budgeting “Pay Yourself First”. Personal Budget Working Tool Take Control Directs flow of cash received towards financial goals Must be Flexible! Takes.
Week 6/7 (no presentations next week due to SME).
Keeping Your Job and Employee Pay Benefits. Becoming Employed.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
Congregation as Employer Beginning on p. 26 of Treasurer’s Handbook.
Week 10. DIAMOND Adjust Your Underground Drawing As Needed Carefully work out your drilling, blasting and mucking cycle – Presumably you will blast at.
© Annie Patton Insurance Part 2 Next Slide. © Annie Patton Aim of Lesson Students learn about the different types of insurance and the circumstances each.
Objectives: -List and discuss types of earned income, such as wages, salaries, tips, and commissions. -Discuss the advantages and disadvantages of self-employment.
Logo L u c k y P e n n y The presentation will begin shortly…
Post Break Week 2. Comments for Consideration of Coal Miners One issue you have created is extreme variability in your coal tonnage – This will impact.
OH 9-1 Controlling Labor and Other Costs 9 OH 9-1.
NOTE: To change the image on this slide, select the picture and delete it. Then click the Pictures icon in the placeholder to insert your own image. Budget.
Medical Assisting Vs. Nursing Which Career is better?
Week 3 Sr. Design. Important Things we Know You will be doing heavy haulage by Barge on the Yukon River for $5 per tonne to Nennana – There will be no.
Obtaining Information From the Geologic Block Model
Pay, Benefits, and Working Conditions
Personal Finance: Module 1 Lesson 3 Determining Your Destiny.
Building Economics. In this Example we Start With Western Mine Cost Service Models.
Benefit Laws 3-5 Mitch Jason and Isaiah. Unemployment Insurance Laws ● Welfare ● Social Security ● Qualification ● Give out unemployment funds ● Money.
Wages and Benefits. Wages  Salary normally used for professional positions.  Hourly wages used for trades people, laborers, general retail,most part-time.
Making the Most of Your Money
Career research project Kevin Dombrowski. Computer Programmer.
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
Week 2 Senior Design. Critical Findings Workers and their families should be housed in Ruby Alaska – The company should build a dental and medical clinic.
Chapter 16 Planning a Budget. Why It’s Important Budgeting techniques help you keep track of where your money goes so that you can make it go further.
PACS 3700/ COMM 3700 Labor Management Case Exercise.
Computer Aided Mine Design Part II – Pit Sequences ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul summer 2003.
UNIT 8: Paying Your Taxes. 8-1 Property Taxes Taxes paid on real estate (houses,etc) collected by local governments Support services including schools,
THE COST OF MANUFACTURING How much does manufacturing cost?
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
The Decision Maker. Managing a Profitable Company.
Supply and Demand Aka Capitalism. Vocabulary terms to copy Price is what you pay. Cost is what the manufacturer spends to produce the product. Supply.
Budgeting “Pay Yourself First”.
Payroll Unit Terms Write down as many payroll terms or payroll taxes that you can think of in 2 minutes. Ready, Set, Go!
Employee Pay and Benefits Chapter 6. W-4 Paystub.
Chapter 6 Pay, Benefits, and Working Conditions  Understanding Pay, Benefits, and Incentives  Compute payroll deductions and net pay.  Identify optional.
TOWN OF ASHLAND LEAVE PROGRAM. WHY ARE WE DOING THIS? As of January 1, 2014, the State required all local governments to offer short term and long term.
Personal Finance Employee Pay & Benefits Chapter Six Notes.
Bell Ringer: May 1 Please take out a writing utensil and make sure you received the note guide for today.
Decision Making in Finance Paycheck Example
Employee Pay and Benefits
No bellwork today – get out a pencil for the quiz
Employee Benefits OBJECTIVES Unit 6.4
Money Management Chapter Six Notes Employee Pay and Benefits
WHAT TO KNOW BEFORE ACCEPTING A JOB OFFER
Chapter 8 Income and Taxes
Flotation Kinetics 0-t1, R1 t1-t2, R1+R2 t2-t3, R1+R2+R3
Basics of Employee Benefits
ISyE 6203 The HDT Case Vande Vate Fall,
Decision Making in Finance Paycheck Example
Understanding Benefits
Presentation transcript:

Week 4

SME Weirdness There will be no class from the week of Feb. 16 to 20 th Your report on this work load will be presented on Tuesday Feb. 24 th This will give you a few extra days – but don’t put things off.

Processing Problems The flow sheet is mostly copied from reports of recoveries from unknown feeds – never adapted to your feed Crushing circuit is pretty detailed Gravity circuit – Why a Knelson Concentrator (were others considered) – It appears to make a single concentrate with both silver and gold in the same concentrate The purity appears to be identified (seems to be pyrite with 4339 g/tonne gold (139.5 oz/tonne) far lower grade than 25% If this is right you would almost certainly roast and leach – But that leaves uncertain what happens to the silver

The Oxide Circuit Looks like it’s a heap leach – Are you serious about spraying leach solutions at negative 20 F? – Hydrometallurgy kinetics tend to be rather temperature sensitive In your case that may not be a problem because I don’t think you can circulate the solution – No recovery is given in the report Potentially because you have none

The Sulfide Circuit Two stage flotation – Copper in first stage with 93% recovery (I’ll go for it) Silver in the copper is 12% – Pyrite in 2 nd stage with 90% recovery (I’ll take that too) Your pyrite has 50% of the gold Silver in gold is 12% – I’m seeing no recovery of Silver sulfides at all – Gold recoveries were projected from another plant with no regard to form of the gold in your plant

We Need Processing Fixed Before We Can Move On Crush ____$/tonne Minus 40 Mesh feed Gravity Pro Tails Con 1 Con 2 Con 3 What are their compositions? What % Recovery did you get? You have 7 ore types – results and costs can Be expected to be different for each (ie you have 7 flow sheets) ______$/tonne What % solids Can it Go to Regrind Or is a Thickening Step needed

More Flow Sheet For Sulfide Float 1 Regrind _______$/tonne ______$/tonne 93% Cu Rec In 30% con Float 2 Float 3 Why will either Have or not have A silver sulfide Floatation?

A Labor Cost Shock I took your reports and put them together in a spreadsheet Worker Down This side Itemized benefits costs across the top I have a kind Of model Written report.

Things Considered Hours regular time/year Hours overtime/year Weeks of paid time off (mine closures and sick leave or vacation) Social Security at 6.2% up to $118,000 of pay Medicare at 1.45% on all pay Unemployment and Workmans comp as a % of pay 401K match Cost of Onsite Medical divided by # workers Cost of health, dental, and vision insurance A H.S.A. match since families will usually not live on site

Holy Crap! DirectTotal PayFringeBurdenAnnual Cost % $ 64, $50, $115, $ 64, $50, $115, $ 62, $49, $112, $ 62, $49, $112, $ 62, $49, $112, $ 62, $49, $112, $ 60, $48, $109, Hour Wage Base Colunas Construction Leadman $ UG Mine Leadman $ Electrian I $ Mechanic I $ Miner I $ Senior Water Treatment Plant Op. $ Mill Operator I $ Burden is 78% Total cost about $110,000 for a laborer! Whats doing this A lot of it is the overtime with the 2 weeks on 2 off schedule Health insurance is $17,000 per year – I’m going to need duplicate crews!

You Flip-Flopped on Barges will worker residence be next? If the health service needed in Ruby anyway saved $6,000 more per year we could Be dealing with $14,000 per year per worker?

I’m Going to have a group look at this Task 5 - Examine the cost of your two weeks on, two weeks off schedule. Work with tasks 1 and 2 to get best possible manning tables for a 40,000 tpd production rate – this will be early week estimates – not necessarily final results. Your 2 weeks on, 2 off mining camp only in Ruby schedule is expensive. Adjust any errors in the spreadsheet set up to correspond to your current schedule. (This may require you to look at the schedule of a model worker over an entire year). See if you can develop an alternate work schedule that puts families in Ruby. This may require more than one try to see what is best. When you have your best schedule (remember that the number of workers may change with the schedule) look at the yearly labor and salary cost of both schedules. Using a 25 year life and a 4.39% interest rate discount the annual cost difference back to determine the maximum additional capital cost your can justify to build up Ruby. Calculate the cost of the planes and airport improvements that will be needed for the two weeks off, two weeks on schedule and include the impact of this capital cost in your estimate. Ie – use the spreadsheet and try some alternate work schedules – see – How much you can save – Cost planes flying in and out of Ruby and the Airport upgrade

The Rest of the Group Task 6 - Estimate the cost of the housing, stores, and other facilities needed for a mining camp using the 40,000 tpd manning table developed early in task 1. Put together a plan and layout. There are some adjustments to the medical facilities outlined in week 2 task 8. Include these. Include heating costs and maintenance. What are the capital and operating costs of this alternative. Task 7 - Estimate the cost of housing, stores, and other facilities needed if the town of Ruby is built up using a manning table for 40,000 tpd. (One item of note – if you build housing in Ruby workers may pay for part and cover maintenance since they will not be maintaining and buying houses in Fairbanks. Depending on how much you subsidize housing you might be able to have a lower wage). You will need early crew estimates from task 5 since the manning table for a resident crew may differ noticeably from a non-resident crew. What are the capital and operating costs for this alternative. Task 8 – (Kyle) Develop the cost of a water and sewer system that serves your processing plants and the mining camp or build up Ruby scenarios.

Where Are We Going MSOPIT has been run with mining and processing costs from a generic Mine Cost Service Model – These costs are being replaced with case specific mining costs (Task 1) – Case Specific Processing costs (Task 2) – Finalize Ultimate pit with variable slope, variable mining costs and updated panels (Task 4)

What Next We will use upgraded cost numbers and the truck bench width and number of benches to do stage pits Notice we set up costs for 10,000 tpd, 20,000 tpd, 40,000 tpd, and 80,000 tpd – We are getting ready to use VALP to determine what the mine and mill size should really be – (the 40,000 you have been working with was a guess)