1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone (20 + 5 mn) Experimental campaign : B. Pégourié (15 + 5 mn) TPL analysis program :

Slides:



Advertisements
Similar presentations
JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
Advertisements

1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
OPTN Modifications to Heart Allocation Policy Implemented July 12, 2006 Changed the allocation order for medically urgent (Status 1A and 1B) patients Policy.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
1 OAS Financial Management Challenges and Program- Budget Implications 1 SECRETARIAT FOR ADMINISTRATION AND FINANCE October 2008.
J. Roth, EU PWI TF, SEWG Fuel Retention, Cadarache, June 15, 09 Tritium inventory: Joint international scaling for ITER WP09-PWI-01-01/IPP/PS Status by.
1E. Tsitrone PWI TF meeting, 4-6/11/2009, Warsaw Euratom 2010 WP for the PWI TF : Tasks agreements and priority support The EU PWI TF under new EFDA :
EU-PWI Taskforce EU PWI TF Meeting Nov. 4 – 6, 2009, Warsaw Summary of the PSI facility review meeting presented by R. Neu based on the Summary of the.
Report IPP Garching EU Task Force PWI Meeting, Cadarache Oct Max-Planck-Institut für Plasmaphysik compiled by Arne Kallenbach (IPP - EU-PWI.
E. Tsitrone, EU PWI TF meeting, oct 2007, Madrid1 E. Tsitrone, J. Roth, A. Loarte, J. Paméla The EU-PWI Task Force: Task agreements for 2008 EU PWI.
ITER & dust Dust = major issue in term of ITER safety In vessel dust quantities: extrapolation from current experiments In vessel dust diagnostics & removal.
Th Loarer - SEWG on Fuel retention – JET, July Th Loarer with special thanks to S Brezinsek, J Bucalossi, I Coffey, G Esser, S Gruenhagen.
WP10-PWI (02)/TEKES/BS(PS) Characterization of retention mechanisms in AUG Monitoring meeting of the EFDA PWI SEWG on Gas Balance and Fuel Retention,
In-Vessel Dust&Tritium Management* 1 *Based on the report of a European Group of Experts on In-Vessel Dust & Tritium Management P. Coad, G. Counsell, J.
1 SEWG C-Migration, JET, 7-8 July 2009P. Monier-Garbet Carbon erosion and transport in the edge of Tore Supra plasmas Y. Marandet, B. Pégourié, Y. Corre,
ERO modelling of local 13 C deposition at the outer divertor of JET M. Airila, L. Aho-Mantila, S. Brezinsek, P. Coad, A. Kirschner, J. Likonen, D. Matveev,
EFDA during FP7 and the PWI TF J.Pamela EFDA Leader PWI Task Force meeting 13 November 2006.
1TPL Dismantling Project – TORE SUPRA Association EURATOM-CEA 8th, december 2006 PFC Thermal test program: TPL sector dismantling.
Kazuyoshi Sugiyama, SEWG meeting on Fuel retention, Garching, July Contribution of Boron on the D retention in the AUG full-W wall regime Max-Planck-Institut.
1TPL Dismantling Project Review 08/12/06 Bernard Pégourié TORE SUPRA Association EURATOM-CEA D program: Specific experiments before dismantling Purpose:
EU PWI Task Force V. Philipps, SEWG mixed materials, JET ITER-like Wall Project : Material choice, issues to investigate and role of new SEWG ITER-like.
1. Qualifying carbon as PFC Erosion (see report S. Brezinsek ) along plasma wetted areas, effect of substrate Local C migration to gaps Fuel retention.
1E. TsitronePWI TF meeting 17-19/10/2005 Euratom Plasma Wall Interactions : Tore Supra recent results E. Tsitrone for Tore Supra team With special thanks.
DITS Project – M. Houry 27 th of april Y07 DITS PROJECT SCHEDULE.
1B. PégouriéDITS progress report 27/04/07 Euratom EXPERIMENTAL CAMPAIGN No reliable estimation of the wall inventory WI ~ ??? D atoms (Tsitrone,
Member of the Helmholtz Association Institute of Energy Research – Plasma Physics | Association EURATOM – FZJ A. Litnovsky et al., Progress report on the.
J. Roth, EU PWI TF, SEWG Fuel Retention, Garching, July 19, 2010 Report on: WP10-PWI /IPP/PS Multi machine scaling of fuel retention for ITER Validation.
Jerome Pamela PWI meeting, 31 October New Horizons for EFDA PWI meeting, October 2007 Jerome Pamela EFDA Leader.
1/18 TORE SUPRA Association Euratom-Cea B. Pégourié – SEWG Gaz Balance & Fuel Retention - JET – July 22-23, 2008 Tore Supra – repetitive long discharges.
1 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Operational Limits during the TPL Deuterium Loading Experiment.
1E. Tsitrone PWI TF meeting, 27-29/10/2008, Frascati Euratom 2009 WP for the PWI TF : Tasks agreements and priority support The EU PWI TF under new EFDA.
F. Le Guern Dust&Tritium PWI AM Frascati Oct 2008 DUST AND TRITIUM MANAGEMENT.
Max-Planck-Institut für Plasmaphysik K. Schmid, SEWG meeting Welcome to the SEWG meeting on gas balance and fuel retention.
6 th EU PWI TF Meeting Madrid, Oct Tritium Inventory in ITER: Laboratory data and extrapolation from tokamaks Th Loarer, J Roth, S Brezinsek, A.
Association Euratom-CEA TORE SUPRA Tore Supra limiter sector dismantling project IR progam Outline Introduction Measurement.
1TPL dismantling project review C. Brosset TORE SUPRA Association EURATOM-CEA 2006/12/08 TPL dismantling project review D program : analysis for D content,
What is valorisation ? Growth €
NexSAT NexSAT Steering Group Meeting - 8 June 2004 © 2004 European Organisation for the Safety of Air Navigation (EUROCONTROL) 1 Welcome to the 4th meeting.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Break Time Remaining 10:00.
1 Application of for Predicting Indoor Airflow and Thermal Comfort.
VOORBLAD.
YES New Mexico Enterprise Eligibility System
15. Oktober Oktober Oktober 2012.
Checking & Corrective Action
Heppenheim Producer-Archive Interface Specification Status of standardisation project Main characteristics, major changes, items pending.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
WP3: Fixing RES-H/C targets Lukas Kranzl, Andreas Müller RES-H Policy Kick-off, October 2008.
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Clock will move after 1 minute
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
PSI 2008 Toledo E.Gauthier TORE SUPRA Association EURATOM-CEA 26-30/05/2008 Progress in diagnostics for characterization of plasma-wall interaction in.
Presentation transcript:

1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone ( mn) Experimental campaign : B. Pégourié ( mn) TPL analysis program : C. Brosset( mn) Integrated planning : M. Houry( mn) General discussion : all(30 mn) Progress report on the DITS project : Agenda

2E. Tsitrone Progress report DITS 27/04/2007 Progress report on the DITS project : Overview What happened since the last project board ? Management plan Final finger selection Erosion / redeposition (confocal microscopy) Safety analysis Whats next ? On going activities Collaboration agreement Planning

3E. Tsitrone Progress report DITS 27/04/2007 Internal review (CCAT, 20/12/2006) : project approved Technical : sample conditionning for storage samples from other PFCs (bumpers, outboard limiter) safety regulations regarding sample activation measurements for erosion/redep (confocal microscopy) : critical path, funding Management : definition of milestones / deliverables risk analysis budget regular reporting to our internal and external partners, web site integrated in the EU PWI TF work programme External review (08/12/2006) : Assessment from advisory board (J. Roth -EU PWI TF, M. Mayer-IPP, P. Roubin -PIIM) great relevance for predictions of the tritium inventory in ITER international collaborations world-wide available expertise preparatory discharge programme of high importance C. Brosset Since the last project board … B. Pégourié E. Tsitrone

4E. Tsitrone Progress report DITS 27/04/2007 Management plan underway DITS : Deuterium Inventory in TS Compare particle balance / post mortem analysis in TS Identify retention mechanisms (bulk diffusion) implications for ITER

5E. Tsitrone Progress report DITS 27/04/2007 Management : project phasing ObjectivesReview Phase 0a – DefinitionScientific objectives Feasibility study Project board 08/12/07 CCAT (20/12/2006) Phase 0b – OrganisationBudget / planning / resources, risk analysis, management plan Progress report 1 (27/04/07) Execution phase 1 : Experimental campaign D loading of TPL Monitor particle balance Progress report 2 : experimental campaign (july) Execution phase 2 : Dismantling / reassembly of TPL In situ analysis (lock in + erosion/redeposition) Extraction of selected fingers Progress report 3 : TPL dismantling/ in situ analysis (september) Execution phase 3 : Samples preparation Samples extracted and ready for analysis Progress report 4 : samples (november) Execution phase 4 : Samples analysis Perform analysis program Collect data Analysis and publication of results Intermediate meetings : partial results (tbd ) Progress report 5 : global results (tbd – 2008/2009) Close out phase 5FeedbackCloseout review (tbd)

6E. Tsitrone Progress report DITS 27/04/2007 Management : information sharing tools Slides available on the EU PWI TF web site ( in the SEWG on particle balance Participative web site underway : edoc (collaborative work, file archiving)

7E. Tsitrone Progress report DITS 27/04/2007 Initial fingers selection Fluence dependance in erosion zones Thin / thick deposits Fast particles in ripple 1.7 MA, no perp. flux Courtesy of R. Mitteau, C. Brosset

8E. Tsitrone Progress report DITS 27/04/2007 Final fingers selection (satellite projects) Migration C/retention D (41 tiles, fing 5, 27, 28) Structure CFC (6 tiles) PFC (2 tiles, fing 1 et 17) IR (6 tiles, fing 4 et 26) Detritiation (fing 6 et 10)

9E. Tsitrone Progress report DITS 27/04/2007 Erosion/redeposition measurements Selected : Confocal microscopy surface mapping image difference for ero/redep = starting point – next : in situ in TS Budget ~ 100 kEuros Call for support from regional funding (50 kEuros) Optical part : call for tender launched Mechanical part : final design approved Integration and test : july 2007 Measurements on sector : august 2007 on fingers : september 2007 ? ero redep Max resolution : 1 m in z, 20 m in x-y Reference inserted between fingers Zones : 200 mm (radial) x 100 mm (toroidal) 20° on TPL sector : zones 11 days Planning optimization : sector equipped with new fingers extracted fingers (no impact on shutdown) z y x

10E. Tsitrone Progress report DITS 27/04/2007 Sample activation Aim : TPL fingers and tiles = conventional samples 7 Be (period = 53 days) : limit at 100 Bq/cm 2 for surface contamination (1/10 of exemption limit) Previous measurements : scraping on TPL : 1-5 Bq/cm 2 (mobile) full deposits : < 50 Bq/cm 2 (fixed + mobile) Proposal for agreement on safety procedures underway : 3 phase control : On TPL sector monitored area in DRFC (sector dismantling, measurements, fingers extraction) On extracted fingers non monitored area in DRFC (tile extraction, analysis in DRFC) On tiles non monitored area outside CEA (conventional transport, sample cutting, analysis in our partners labs) Exchange protocol with external partners Annual report on samples

11E. Tsitrone Progress report DITS 27/04/2007 Whats next ?

12E. Tsitrone Progress report DITS 27/04/2007 On going activities … WP0 : Management : Management plan, information sharing tool (E. Tsitrone, L. Jourdheuil) Integrated planning (M. Houry, echange/DITS/PLANNING) Safety aspects : ok for conventional operation (K. Zunino), agreement on specific procedures for sample activation (F. Saint Laurent) WP1 : Experimental campaign : Preparatory experiment (11/05/2007), diagnostics strategy (P. Moreau) Dedicated campaign manning (B. Pégourié) WP2 : TPL dismantling : Specific tooling for TPL sector and fingers protection (A. Martinez) SATIR test (new fingers selection) (J. Schlosser) Planning / human resources for summer shutdown (F. Samaille, M. Houry) WP3 : TPL analysis : Preparation for confocal microscopy (E. Gauthier, H. Roche) Validation of tile extraction process (J. Schlosser) Integrated analysis program (C. Brosset) Sampling from other PFCs (C. Brosset)

13E. Tsitrone Progress report DITS 27/04/2007 WP4 : Satellite projects Dust : Characterisation + effect of maintenance, sampling location, analysis program (MEB) IR : low cost option Thermal properties of deposited layers (power balance for IR on TPL) : with available laser (Speckle) IR monitoring of neutralisers : simple fiber replacement Cancelled : upgrade of calorimetry, active thermography, TPL cleaning procedure PFCs : Lock in thermography on extracted sector Analysis of defective tiles on Q6A Oxydation of cooling channels Cancelled : finger repair Added : acoustic sensor for CHF detection (feasibility) Detritiation : Test on deposited layers + gaps : laser cleaning (CEA) : lab through safety procedures before commisionning oxydation/scavengers : CIEMAT, MEPHI

14E. Tsitrone Progress report DITS 27/04/2007 Collaboration agreement for analysis Integrated into EU PWI TF (STAC), preferential support in 2008 for EU participating labs ? Call for interest after last project board : all needed measurements covered Collaboration agreement : Integrated analysis program Sample preparation / identification Experimental protocol for all measurements involved Data collection (data format, intermediate reports …) Strategy for global analysis Publication policy : editorial board (TS + participating labs) Suggestions welcome !

15E. Tsitrone Progress report DITS 27/04/2007 Provisionnal planning for TS JanFeb.JanFeb.MarchAprilMayJuneJuly.Aug.Sept.Oct.Nov.Dec. Arrêt hiver 06/07 3 4, AIA (V+T) AIA (PA) Winter shutdown Winter SD 07/06 Summer Shutdown 01/10 Cat.1 Dismantling 3D Meas. Install ICRH Iter-like 12/06 DITS 12/09 3 4, Spec Consult. Real. Assemb. 3D Diagnostic manufact.

16E. Tsitrone Progress report DITS 27/04/2007 Provisionnal planning for DITS 11/05/07Validation of plasma scenario 23/05/07Carbonisation + boronisation 24/05/07 up to 07/06/07 Dedicated campaign (10 days, long shift) June 2007TS opening Control TS + TPL sector TPL dismantling Lock in Thermography Extraction selected fingers Control on fingersReplacement by new fingers July 2007Leakage test of TPL sector August 2007Confocal microscopy on TPL sector September 2007 Confocal microscopy on extracted fingers Tile extraction Control on tiles Samples cutting from tiles TPL reassembly in TS October 2007 Samples characterization Sample ready for analysis TS restart DITSTS