R.Zagórski, SEWG Meeting, Culham, July 2008 1 New EFDA and PWI Work Programme R.Zagórski EFDA CSU Garching Acknowledgements: J.Pamela, J.Roth, E.Tsitrone.

Slides:



Advertisements
Similar presentations
EU CORIN Supporting Cross-border Cooperation BiH – Croatia/Serbia/Montenegro Europeaid/122730/C/SER/BA ________________________ Topical Training for JMC.
Advertisements

Erasmus Mundus Information Day 20 January Erasmus Mundus Information Day 20 January ERASMUS MUNDUS PREPARING YOUR APPLICATION.
J. Roth, EU PWI TF, SEWG Fuel Retention, Cadarache, June 15, 09 Tritium inventory: Joint international scaling for ITER WP09-PWI-01-01/IPP/PS Status by.
1E. Tsitrone PWI TF meeting, 4-6/11/2009, Warsaw Euratom 2010 WP for the PWI TF : Tasks agreements and priority support The EU PWI TF under new EFDA :
EU-PWI Taskforce EU PWI TF Meeting Nov. 4 – 6, 2009, Warsaw Summary of the PSI facility review meeting presented by R. Neu based on the Summary of the.
Report IPP Garching EU Task Force PWI Meeting, Cadarache Oct Max-Planck-Institut für Plasmaphysik compiled by Arne Kallenbach (IPP - EU-PWI.
1E. TsitronePWI TF meeting 13-15/11/2006 Euratom ITER divertor status Annual ITER divertor meeting (4-6 october 2006, St Petersbourg) Memorandum of undestanding.
R.Zagórski, PWI Annual Meeting, Frascati, October, New EFDA and PWI Work Programme R.Zagórski EFDA CSU Garching Acknowledgements to J.Pamela and.
R. Neu: SEWG meeting, Oct. 1-2, The EU Plasma Wall Interaction Task Force : Work Programme 2010(-2011) R. Neu (Deputy TF leader, IPP Garching) E.
R. Doerner, Oct. 18, 2005 EU PWI TF meeting, France Beryllium and carbon mixed-material studies R. P. Doerner, M. J. Baldwin, J. Hanna and D. Nishijima.
E. Tsitrone, EU PWI TF meeting, oct 2007, Madrid1 E. Tsitrone, J. Roth, A. Loarte, J. Paméla The EU-PWI Task Force: Task agreements for 2008 EU PWI.
EFDA during FP7 and the PWI TF J.Pamela EFDA Leader PWI Task Force meeting 13 November 2006.
R. Neu: SEWG meeting, July 7-8, The EU Plasma Wall Interaction Task Force : Work Programme 2010(-2011) R. Neu (Deputy TF leader, IPP Garching) E.
1E. Tsitrone PWI TF meeting, 27-29/10/2008, Frascati Euratom International context : ITPA (International Tokamak Physics Activity) Changes in the ITPA.
J. Roth, EU PWI TF, SEWG Fuel Retention, Garching, July 19, 2010 Report on: WP10-PWI /IPP/PS Multi machine scaling of fuel retention for ITER Validation.
Jerome Pamela PWI meeting, 31 October New Horizons for EFDA PWI meeting, October 2007 Jerome Pamela EFDA Leader.
J. Roth Bilateral Agreements EU-DOE: e.g.: PISCES operation (following talk by Russ Doerner) Bilateral Agreement EU-Russia: collaboration on Material damage.
Meeting SEWG retention, 19-20/7/2009R. Neu 1 The EU Plasma Wall Interaction Task Force : Work Programme 2011 R. Neu (act. TF leader, IPP Garching) E. Tsitrone.
1E. Tsitrone PWI TF meeting, 27-29/10/2008, Frascati Euratom 2009 WP for the PWI TF : Tasks agreements and priority support The EU PWI TF under new EFDA.
F. Le Guern Dust&Tritium PWI AM Frascati Oct 2008 DUST AND TRITIUM MANAGEMENT.
6 th EU PWI TF Meeting Madrid, Oct Tritium Inventory in ITER: Laboratory data and extrapolation from tokamaks Th Loarer, J Roth, S Brezinsek, A.
Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
REALIZING BOSNIA AND HERZEGOVINAS EUROPEAN POTENTIAL: FROM POST-CONFLICT TO PRE-ACCESSION FROM DAYTON TO BRUSSELS - PROGRESS ON EU INTEGRATION - Mr. Adnan.
EU-Regional Policy Structural actions 1 GROWING EVALUATION CAPACITY THE MID TERM EVALUATION IN OBJECTIVE 1 AND 2 REGIONS 8 OCTOBER 2004.
Policy Research and Innovation Research and Innovation EUROSTARS JOINT PROGRAMME Research and Development programme undertaken by several Member States.
The Implementation Structure DG AGRI, October 2005
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
ITER Organization, Cadarache, France
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
Information Day Call 2001/1 - Brussels 19 June Call for proposals 2001/1 HOW TO PREPARE AND PRESENT YOUR PROPOSAL Willy MAES DG INFSO/F3
Regional Policy Cohesion Policy Legal Package State of play Porto, 29th April 2013 Vicente RODRIGUEZ SAEZ Deputy Head of Unit DG REGIO.D.1 Transnational.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
« HUMAN BIOMONITORING » Consultative Forum on Environment & Health 19th October 2005 in Luxembourg Update on developments.
European Organisation for the Safety of Air Navigation ITEM 7 AGENCY BUSINESS PLANNING: Budget Process and Functional Budget Presented by the SCF Chairman.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
LLM 2010/11 EU Environmental Law I The EU on the International Stage.
1 The OneGeology project IC GS Ian Jackson, February 2007.
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
Extension of IEA Implementing Agreement on Large Tokamak Facilities Presented to Committee on Energy Research Technologies October 18-19, 2005 Paris, France.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Comenius Individual Pupil Mobility. Individual Pupil Mobility Aims of the action-1  Allow secondary school pupils to spend between 3 and 10 months in.
Ana Garcia Saguar Fusion Agreements Research DG European Commission Renewal of the Mobility Agreement.
EFDA Fusion Roadmap Status of implementation Francesco Romanelli EFDA Leader.
Broader Approach Activities toward Fusion DEMO Reactors IT/E-2 IAEA 21 st Fusion Energy Conference (Chengdu 17 th October, 2006 ) Shinzaburo Matsuda Japan.
Report on W66 at W69 M. L. Watkins 1 (4) MIT, Cambridge, MA, USA, 11 December 2008 Report on Sixth Joint Workshop (W66) “Implementation of the ITPA Coordinated.
F Romanelli 1 (19)2 December 2010 Overview of JET experiments and EFDA plans Francesco Romanelli EFDA Leader and JET Leader 2 December 2010.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
U.S. Department of Energy’s Office of Science 20 th Meeting of the IEA Large Tokamak ExCo, May th Meeting of the IEA Poloidal Divertor ExCo, May.
1 ASTRONET Coordinating strategic planning for European Astronomy.
STAC Extended meeting Coordination/Support Action on Fusion Data General Introduction and Background European Commission Research DG Yvan Capouet Head.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
B WEYSSOW 2009 Coordinated research activities under European Fusion Development Agreement (addressing fuelling) Boris Weyssow EFDA-CSU Garching ITPA 2009.
VTT TECHNICAL RESEARCH CENTRE OF FINLAND VTT PROCESSES Tekes Contribution to European Fusion Roadmap Seppo Karttunen and Tuomas Tala VTT / Association.
EIROforumSchool on Instrumentation A. Murari May 2013, CERN. JET: the European Fusion Device Andrea Murari EFDA-JET Close Support Unit EIRO School.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Mobility Agreement Mobility Info Day Brussels, 19 October 2009 Doug Bartlett Fusion Association Agreements Research DG European Commission.
Boundary Physics Breakout Session was a Good Start Breadth of topics: many issues pointed out in three plenary talks: pedestal, SOL/div/PFC, and technology,
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
JET Programme in preparation of ITER
Passenger Mobility Statistics 21 May 2015
Annual Report on the IA for Co-operation on Tokamak Programmes
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Annual Report on the IA for Co-operation on Tokamak Programmes
Presentation transcript:

R.Zagórski, SEWG Meeting, Culham, July New EFDA and PWI Work Programme R.Zagórski EFDA CSU Garching Acknowledgements: J.Pamela, J.Roth, E.Tsitrone

R.Zagórski, SEWG Meeting, Culham, July Joint Undertaking for ITER Fusion for Energy (F4E) Domestic Agency to provide and manage EU contribution to ITER EU Contribution to Broader Approach located in Spain (Barcelona) New Organisation in force end 2007 European Fusion Development Agreement (EFDA) Agreement between all EU fusion labs and Euratom Coordinated research (physics in support to ITER, longer term technology) and JET Garching (D) and Culham(UK) Associations: European Fusion Laboratories associated to Euratom through Contracts of Association The overall fusion programme remains coordinated by the Commission in the frame of Euratom

R.Zagórski, SEWG Meeting, Culham, July Collective use of JET Reinforced coordination of physics and technology in EU laboratories Training EU contributions to international collaborations outside F4E All EU Laboratories/Institutions working on Fusion are parties to EFDA EFDA

R.Zagórski, SEWG Meeting, Culham, July EFDA Committees Two Committees: - EFDA SC - Chairman A.Bradshaw (IPP), - all Associations and EC represented - STAC - Chairman F.Gnesotto (ENEA-RFX), - smaller committee: 13 members appointed on the basis of their scientific and technical competences Commission Unit J4, head Y.Capouet, is in charge of EFDA and Contracts of Associations New Director for Euratom Research to be appointed (Octavi Quintana Trias )

R.Zagórski, SEWG Meeting, Culham, July Activities in the EFDA CSU-Garching -Physics coordination -Emerging Technologies coordination (in complement to F4E) -PI and SERF -Training -Administration

R.Zagórski, SEWG Meeting, Culham, July Activities in the Garching-CSU -Physics Coordination -ITER scenarios Coordination of Task Forces and Topical Groups -PWI Coordination of common tools -Integrated modelling Coordination of Data bases -Link with ITPA -Link with JET -Link with F4E and Support to F4E on scientific matters -Support to participation in scientific committees (eg ITER STAC where the EFDA Leader seats) -Emerging Technologies coordination (in complement to F4E) -Plasma engineering (diagnostics, heating, control) Coordination of Task Forces -Material sciences and Topical Groups -System studies (DEMO)Coordination of common tools -Various technologies (HTS, He cooling, etc.) Coordination of Data bases -Close Links with F4E

R.Zagórski, SEWG Meeting, Culham, July Activities in the Garching-CSU -Other activities -PI -Socio-economics -Training -New Goal Oriented Training programme (200 engineers and scientists to be trained over 5 years; Call for first programme launched in September, analysis of proposals on-going) -New Fellowships (1 st programme at the same stage of processing) -QA -Administration -EFDA Task Agreements (new EFDA Art.5) -Personnel (EFDA Art. 9) -Host Support (EFDA Art. 8) -coordination of training in Associations (new EFDA Art.7) -International Collaborations -IPR -IT tools -Remote participation tools

R.Zagórski, SEWG Meeting, Culham, July Coordination of R&D: EFDA Task Forces & Topical Groups 2 TFs and 5 TGs approved by EFDA SC chairpersons being selected for the new TGs (very enthusistic response from Associations) PWI Task Force: Leaders J.Roth (IPP) and E.Tsitrone (CEA) ITM Task Force: Leaders P.Strand (VR), M.Romanelli (UKAEA), LG Eriksson (CEA) H&CD Topical Group: Chairman A.Becoulet (CEA) Diagnostics Topical Group: Chairman T.Donné (FOM) Transport Topical Group: Chairman C.Hidalgo (CIEMAT) MHD Topical Group: Chairman P.Martin (ENEA-RFX) Materials Topical Group: Chairman S.Dudarev (UKAEA) => The structure is fully there, ready to elaborate and implement the Workprogrammes

R.Zagórski, SEWG Meeting, Culham, July EFDA new Art. 5 EFDA Art. 5 foresees implementation of activities through Task Agreements TAs will cover groups of activities with common goals agreed between the EFDA Leader and the participating Associations implementation: using provisions of the contracts of Association upon proposal of the EFDA Steering Committee, the CCE-FU may define priority actions (up to 40% Euratom contributions) => TAs are main tools for the implementation of the Workprogramme => TA elaborated on the basis of the Workprogramme (activities foreseen under P.S. identified in the WP) => participation of Associations elaborated on the basis of a Call for Participation => TA template agreed definition of work under Baseline Support and Priority Support objectives and milestones work breakdown defining contributions of each Association Implementing Agreements are also foreseen in Art 5: IAs for cooperative activities based on the use of a facility or a device Implementing Agreements concluded between the Commission and the Associates concerned

R.Zagórski, SEWG Meeting, Culham, July EFDA new Art. 5: Priority Support New Rules for Priority Support in FP7 cooperative activities (hardware and manpower) Activities under P.S. are being implemented under the PWI and ITM Task Forces: -TF coordination -Some joint experiments -Some actions conducted by Associations as a service to all others -Hardware identified by the TF The proposals are top-down: priorities identified by the TF, approved in the EFDA work programme and then subject to a Call to the Associations Funding under Priority Support is limited and PS will be used as a strong incentive for strengthening cooperation

R.Zagórski, SEWG Meeting, Culham, July Task Force Plasma-Wall Interaction Main orientations at Annual General Meeting Contact Persons from 23 Associations and JET TF E and FT, EFDA, ITER, F4E Participation in ITPA Divertor and SOL Associations Baseline work programme Priority support Special Expert Working Groups Annual specialised meetings of SEWG members EU PWI TF: mature organisation EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Material erosion and transport in tokamaks Work Programme distributed into SEWGs … Fuel retention Transient heat loads Dust Gas balance and fuel retention Fuel Removal ELMs and disruptions Dust in fusion devices Material erosion and transport Material Migration High-Z Materials ITER-like Material Mix EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July International Collaborations USA : PISCES Melt layer behaviour under realistic conditions RF : Plasma Guns High heat flux test on high Z materials EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Annual Work Flow Definition of the Work Program for the next year (WP 2009) Presentation of the Annual Work Programme to EFDA SC (WP 2008) Call for Participation (November 2007) 11th TAs Lunched in June 2008 (start date ) EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Task Agreements SEWGProposed Task Agreements for 2008 SEWG Gas balance and fuel retention TA-1: Consolidation of post-mortem analysis Gas Balance and Fuel with gas balance TA-2: Multi machine scaling of fuel retention to ITER SEWG Fuel RemovalTA-3: Treatment of metallic surfaces including beryllium with oxidising plasmas for fuel removal SEWG Dust in Fusion Devices TA-4: Joint measurements of dust in different devices SEWG Material MigrationTA-5: Clarification of chemical erosion under ITER divertor relevant conditions. TA-6: Transport and deposition of first wall impurities SEWG High-Z MaterialsTA-7: Development of the PWI basis in support of integrated high-Z scenarios for ITER. SEWG ITER Material MixTA-8: Determination of expected alloys and compounds and their influence on PWI processes SEWG Transient Heat LoadsTA-9: Determination of ELM and Disruption transient loads. TA-10: Mitigation of transient loads during ELMs and disruptions. AllTA-11: TF and SEWGs Leadership SEWG Leader = Task Coordinator EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Milestones May 2008 Reports at the PSI Conference in Toledo Mid 2008 SEWG Meeting: Collection and discussion of results obtained from the evaluation of experiments in 2007 and early 2008 October 2008 (Frascati): Annual meeting of the EU TF on PWI: coordinated presentation of the results from the experimental campaigns in Reports on TA's (Templates to be defined) December 2008: Synthetic analysis report sent to EFDA-CSU. EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Reports Baseline Support At the end of each calendar year, during the PWI TF annual meeting, the Task Coordinator shall present a report on all activities (baseline and priority support) under the Task Agreement to the EFDA Leader for his approval. These reports shall integrate the progress made by each Association on each activity, and they shall indicate the level of achievement of the objectives, the situation of the activities, the allocation of resources and recommendations for the next year when applicable. Priority Support Achievement of Priority Support deliverables will be reported separately to the EFDA Leader. A final report shall be prepared by the Task Coordinator and submitted to the EFDA Leader. Each participation Association will have to report in one subsection on the degree to which the deliverables of their Task have been achieved, and shall include a breakdown of expenditure. The Task Coordinator will collect the individual subsections into the final report for Priority Support activities addressing the milestones. EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July JET Activities No JET related activities are meant to be implemented under the present Task Agreement. (They are implemented under EFDA Art.6.) JET activities can be mentioned for information in the present TA when they closely relate to the activity implemented under Art.5. JET data collected under the JET part of the EFDA WP can be brought together with other data under this TA when relevant for the progress of the work or used in multi- machine modelling activities under Art.5. EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Priority Support Activity eligible for priority support : Well identified actions, including: TF and SEWG leadership (0.5 ppy for TF leader and deputies, 0.25 ppy for SEWG leadership) joint activities: experimentation, modelling, support to the other Associations, etc. selected hardware or manpower costs involving irradiation, work on hot cells, work with tritium and/or beryllium + collaborative actions specific for the TA EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July Mobility In the frame of TAs, exchange of scientists between the involved Associations is planned covering: - participation in joint experimental campaigns and modelling efforts - attendance to the SEWG and TF meetings. For all these exchanges, the use of the mobility agreement is foreseen. The use of mobility is within the ceiling of Association EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July WP2009 PWI Call for Participation in WP issued July deadline for responses: 5 th September Task Agreements EU Task Force on Plasma-Wall Interaction

R.Zagórski, SEWG Meeting, Culham, July WP2009 Estimated budget needed for activity under baseline support, eligible for priority support, hardware and mobility BS (ppy)PS (ppy)Hardware (k)Mobility (k) TF Coordination SEWG Coordination TA-1: Fuel retention as a function of wall materials foreseen for ITER TA-2: Fuel removal compatible with retention in different and mixed first wall materials TA-3: Dust generation and characterization in different devices TA-4: Erosion, transport and deposition of first wall impurities TA-5: Development of the PWI basis in support of integrated high-Z scenarios for ITER TA-6: Liquid plasma-facing components TA-7: Expected alloys and compounds and their influence on PWI processes TA-8: Mitigation of disruption loads for ITER TA-9: Heat load in ITER relevant ELM scenarios Total75 ppy18.45 ppy280 k350 k EU Task Force on Plasma-Wall Interaction