DITS Project – M. Houry 27 th of april Y07 DITS PROJECT SCHEDULE.

Slides:



Advertisements
Similar presentations
RENAISSANCE es un proyecto del programa CONCERTO co-financiado por la Comisión Europea dentro del Sexto Programa Marco 1 PSG meeting & minutes, Friday.
Advertisements

JULY JULIO AUGUST AGOSTO SEPTEMBER SEPTIEMBRE OCTOBER OCTUBRE NOVEMBER NOVIEMBRE DECEMBER DICIEMBRE LOS ANGELES UNIFIED SCHOOL DISTRICT DISTRITO ESCOLAR.
1 Yell / The Law and Special Education, Second Edition Copyright © 2006 by Pearson Education, Inc. All rights reserved.
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
01 Prologo 02 Bran 103 Catelyn 1 05 Eddard 1 04 Daenerys 1 06 Jon 1 07 Catelyn 2 10 Tyrion 1 08 Arya 1 16 Sansa 1 09 Bran 2 11 Jon 2 12 Daenerys 2 13 Eddard.
1_Panel Production. 380 pannelli 45 giorni di produzione = 8.4 pannelli/day.
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. *See PowerPoint Lecture Outline for a complete, ready-made.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 101.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 112.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
SAFEFOODERA – SSA – integration project Expansion of SAFEFOODERA – Fully integrated or Associated partnership in 12 months.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Cultural Heritage in REGional NETworks REGNET Quality Assurance – D14.
Cultural Heritage in REGional NETworks REGNET Project Management and Coordination.
1E. Tsitrone Progress report DITS 27/04/2007 Overview : E. Tsitrone ( mn) Experimental campaign : B. Pégourié ( mn) TPL analysis program :
1TPL Dismantling Project – TORE SUPRA Association EURATOM-CEA 8th, december 2006 PFC Thermal test program: TPL sector dismantling.
1TPL Dismantling Project Review 08/12/06 Bernard Pégourié TORE SUPRA Association EURATOM-CEA D program: Specific experiments before dismantling Purpose:
1 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Operational Limits during the TPL Deuterium Loading Experiment.
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
1TPL dismantling project review C. Brosset TORE SUPRA Association EURATOM-CEA 2006/12/08 TPL dismantling project review D program : analysis for D content,
Grade D Number – Multiplying Decimals 1. O.8 x x x x x x x x x
WARC 14/15 - S.S.O.R.T. / ByeBye / / KI. UM DIE WELT SEGELN ByeBye-Party Gstaad WARC 14/15 - S.S.O.R.T. / ByeBye / / KI.
Version 0.3, 28 January 2004 Slide: 1 APPLICATIONS OF METEOSAT SECOND GENERATION (MSG) DETECTION OF CONTRAILS Author:Jochen Kerkmann (EUMETSAT)
East Parking Garage Project (Executive Leadership Council) January 31, 2011.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
RES-H Policy Project administration, contractual and financial issues
CMPC Project Metso Automation 2 nd Align Meeting DCS Scope October, 23th/24th
Physical Aspects [Reflection Modelling] Hauptseminar: Augmented Reality for Driving Assistance in Cars.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
June 26, 2002; Page: 1 ESOC (TOS-OGR) European Space Operations Centre Manfred Warhaut Ground Segment Manager TOS-OGR ROSETTA Ground Segment.
We are learning how to read the 24 hour clock
Board Meeting – May 27,  Communication  Transportation  Maintenance  The Countdown!
Produced by the Department of Learning and Teaching Resources, Belfast Institute. Want to be a xxxxx? Welcome to College Name Click here to start.
Want to be a xxxxx? Welcome to College Name Click here to start.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
What to Expect Overview of the calendar year with important dates, trends, and events A broad look at busy and non-busy times throughout the year Sample.
SIMOCODE-DP Software.
Glasgow, , 1 W. Raskob (KIT) European Technology Platform on Preparedness for Nuclear and Radiological Emergency Response and Recovery NERIS-TP.
Your 30 second introduction This PowerPoint presentation will guide you thru your 30 second introduction. To move to the next slide, click the enter key,
1 K. C. Lo / L. M. Chow Power Systems Business Group CLP Power Knowledge Management in CLP Power Oct 2004.
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
THE QUESTIONS THAT NO ONE ASKS Social Entrepreneurship Conference Luis Pareras.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
Uma Rede de Tecnologia e Qualidade ISQ FRIENDCOPTER Integration of Technologies In Support of Passenger And Environmentally Friendly Helicopter instituto.
Clock will move after 1 minute
Module 13 Unified Command Module 13 Unified Command Origin of Unified Command Origin of Unified Command Description of Unified Command Description of Unified.
Select a time to count down from the clock above
Module 16 Objectives 1. Describe the kinds of incident management problems that can occur due to a lack of multiagency coordination. 2. Define essential.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

DITS Project – M. Houry 27 th of april Y07 DITS PROJECT SCHEDULE

DITS Project – M. Houry 27 th of april Y07 A Project Management Office has been established in the DITS project organization DITS project organization. The PMO provides a help in terms of : Schedule, Human ress., Risk, Cost, Communication, Reviewing Management Mean Goals : Built ONE Work-Plan based on Work-Packages What you must do Periodic progression measurements Analysis of shifts & risks anticipation Appropriate corrections or treatments Management Team Project Time & Res. Management Project Risk, Cost & Quality Management Project Safety Management

DITS Project – M. Houry 27 th of april Y07 The DITS schedule is made of 6 Work-Packages WP0 - Management Time, cost, human resources, quality, risk, safety, communication, reviews WP1 – Particle balance experiments D 2 Plasma experiments for TPL loading WP2 – TPL Dismantling Extraction – Operations – Mounting WP3 – ANALYSIS Preparations and analysis on the TPL, fingers, tiles and samples WP4 – SATELLITE PROGRAMS IR program (R. Reichle) PFC (J. Schlosser) Detritiation (H. Roche) DUST (S. Rosanvallon) WP5 – CO ACTIVITIES Acoustic sensors (X. Courtois) Tore Supra Summer Shut-down Tore Supra Experimental program

DITS Project – M. Houry 27 th of april Y07 Work Package 1 & 2 : TPL loading and Dismantling Sept.Mai MayJuin JuneJuil..July.Août Aug. Removing ICRH(Q1) & TPL(Q6A)TPL Loading : 24/05 to 07/06 Fingers exchange Spare Fingers validation Qualification tests TPL & ICRH installing 3D Cartography Meas. WP1 WP2 WP3 Tore Supra Summer Shut-down for maintenance operations

DITS Project – M. Houry 27 th of april Y07 WP3 : Analysis 3D Cartography on fingers TPL back in TS Assembly - tests 18/07 AprilMayJuneJulyAug.Sept. 3D cartography measurements Structure 22/06 Optics 04/07 3D Cartography on sector 02/08 24/08

DITS Project – M. Houry 27 th of april Y07 WP3 : Preparation for analysis Fingers – Tiles extraction – Samples cutting Aug.Sept.Oct. Samples characterization Fingers activity control Safety authority agreement 13/09 Tiles dismantling 26/09 Tiles cutting Samples 11/10 3D Cartography Ready for analysis 22/10