1 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Operational Limits during the TPL Deuterium Loading Experiment.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
PID Control Loops Guy Zebrick.
4-6 Arithmetic Sequences Warm Up Lesson Presentation Lesson Quiz
Fill in missing numbers or operations
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
McGraw-Hill©The McGraw-Hill Companies, Inc., 2003 Chapter 11 Ethernet Evolution: Fast and Gigabit Ethernet.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
G. Arnoux (1/19) SEWG on transient heat loads Ljubljana, 02/10/2009 Heat load measurements on JET first wall during disruptions G. Arnoux, M. Lehnen, A.
Alberto Loarte EU Plasma-Wall Interaction Task Force Meeting – CIEMAT – 10 – ITER Design Review Activities on Steady State and Transient Power.
1Annual meeting SEWG Transient Heat Loads, Ljubljana, 1 st /2 nd October 2009 TORE SUPRA Association Euratom-CEA J. Bucalossi Report on Tore Supra activities.
1TPL Dismantling Project – TORE SUPRA Association EURATOM-CEA 8th, december 2006 PFC Thermal test program: TPL sector dismantling.
1 E. Delchambre Demoncheaux Culham (22/07/08) Euratom CARBON SOURCES IN TS LONG DISCHARHES.
1TPL Dismantling Project Review 08/12/06 Bernard Pégourié TORE SUPRA Association EURATOM-CEA D program: Specific experiments before dismantling Purpose:
1B. PégouriéDITS progress report 27/04/07 Euratom EXPERIMENTAL CAMPAIGN No reliable estimation of the wall inventory WI ~ ??? D atoms (Tsitrone,
1/18 TORE SUPRA Association Euratom-Cea B. Pégourié – SEWG Gaz Balance & Fuel Retention - JET – July 22-23, 2008 Tore Supra – repetitive long discharges.
1TPL dismantling project review C. Brosset TORE SUPRA Association EURATOM-CEA 2006/12/08 TPL dismantling project review D program : analysis for D content,
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
MULTIPLICATION EQUATIONS 1. SOLVE FOR X 3. WHAT EVER YOU DO TO ONE SIDE YOU HAVE TO DO TO THE OTHER 2. DIVIDE BY THE NUMBER IN FRONT OF THE VARIABLE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
Randomized Algorithms Randomized Algorithms CS648 1.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Squares and Square Root WALK. Solve each problem REVIEW:
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Introduction to Feedback Systems / Önder YÜKSEL Bode plots 1 Frequency response:
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
1 1 – Experience of diagnostics used for LH grill protection 2 – Layout of the suitable diagnostics in ITER 3 – Info on fibre optics for wave guide arc.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
: 3 00.
Januar MDMDFSSMDMDFSSS
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Self-training with Products of Latent Variable Grammars Zhongqiang Huang, Mary Harper, and Slav Petrov.
LH Generated Hot Spots on the JET Divertor
Presentation transcript:

1 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Operational Limits during the TPL Deuterium Loading Experiment _______________________ F. Saint-Laurent, F. Rimini, A. Ekedahl, E. Tsitrone, A. Triay-Alcouffe, P. Monier-Garbet et al Overview of the 10 days experiment (talk E. Tsitrone) Main Limitation: Disruptions Revised scenario Probability of UFOs and Disruptions Appearance of UFOs Origin of UFOs Analysis of IR and CCD films Conclusions

2 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Performance evolution over 10 days [F. Saint-Laurent, F. Rimini] Day Number of UFOs % Disruptions Scenario 2 Scenario 1: I p = 0.6MA, P LH = 2MW, 120 s pulse duration Scenario 2: P LH reduced, ~80 s duration

3 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Probability of UFOs and disruptions Day Disruption probability follows the number of UFOs % of UFOs lead to disruption Definition of UFO: Increase in P rad > 20% TS #39928 Prad (MW) Time (s) threshold # of UFOs per 100s of plasma # of disruption per 100s of plasma

4 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July /05/07 (Day 3) : clean pulses Appearance of UFOs: Scenario 1 [E. Tsitrone]

5 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July /05/07 (day 3) : almost no UFOs … 01/06/07 (Day 7): lots of UFOs, and disruptions. UFOs appear when P LH is first applied, then more sporadic Appearance of UFOs: Scenario 1 [E. Tsitrone] LH power is switched off by the safety system when UFOs appear

6 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Day 10 : Search of power limit Scenario 2: P LH limited to MW [E. Tsitrone] Reduced P LH No UFOs

7 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Time distribution of UFOs 29 shots with LH power 117 UFOs 24 shots with LH power33 UFOs Day 7 Day 3 3 disruptions 19 disruptions

8 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 IR analysis of disruptions Number of disruptions62 Disruptions with IR data available59 1 st origin Arcs in front of launcher prior to disruption1830% Carbon flakes from side protections prior to arcing10 2 nd origin Hot spot on TPL prior to disruption (Q6 and Q5)14 Hot spot on TPL prior to disruption (Q6 => 1/6 of TPL)1017% Both origins simultaneously0 IR cameras to monitor : both LH launchers 1/6 of the TPL (Q6) ~1/18 of the TPL with high resolution (Q5) [A. Ekedahl]

9 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Disruption precursor: Arcs IR camera observation of LH launchers Flaking of co-deposited layer from launcher side protections Induce arcing in front of launchers C2 Impurity safety system detects Cu in the plasma. IR safety system detects arcing. LH power is switched off. Impurity safety system was later modified to act on all impurities (C, Cu,Fe, …) to try to avoid disruptions due to UFOs. Increase of electron density and radiated power 30% of the disruptions were preceded by arcs in front of launchers. 70% of disruptions can NOT be attributed to arcing. LH launcher safety: Plasma safety:

10 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 IR camera observation : localized at vertical port in Q6 Overheating of co-deposited layers prior to disruption Disruption precursor: TPL Pulse 39918, t = s Localised hot spot on TPL appears around 4.0s. Followed by overheating of the co- deposited layer. P Rad and CIV increase at 4.2s. P LH is switched off at 4.25s (plasma safety). No arcs in front of launchers.

11 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Overheating of TPL starts ~100ms before increase in P Rad and n e. Increase in P Rad is associated with carbon release. Disruption precursor: TPL 39868, t=5.0s 39868, t=6.0s 39868, t=6.4s 39868, t=5.56s Heating on high field side on TPL prior to disruption Overheating of co-deposited layers prior to disruption

12 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 bolo3/bolo14 HFSLFS 3 14 P LH Zeff-2 Ip b3/b14 nl 0-100ms before LH is cut off steady phase TS39868 A MARFE is triggered before the disruption [P. Monier-Garbet] The ratio of the signals from two bolometer sight-lines indicate the roll-over of the radiation towards the HFS (MARFE)

13 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Appearance of UFO (IR camera) Overheating of CFC tile on TPL => UFO Hot spot on TPL appears at ~48.3s. Increase of electron density and radiated power (UFO). Then the tile remains overheated, but n e and P rad are recovered until the plasma disrupts ~50s later , t = 48.5s Q6A

14 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Appearance of UFOs (visible CCD camera) T1 T2 T3 T4 T5 T6 Origin Unknown : 30 % From TPL : 70 % Localisation of UFOs from TPL for 2 days 1/3 rd of TPL is observed Number of UFOs : 01/06/07 (day 7) : 598 (CCD) [117 from P rad ] 07/06/07 (day 10) : 325 (CCD) [80 from P rad ] 1/18th = if equal repartition T1 T2T3T4T5T6 Percentage [A. Triay-Alcouffe]

15 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Conclusions The TPL loading campaign was limited by disruptions, induced by UFOs. Two strategies were applied : - Modified impurity safety system (fast switch-off of LH power) P LH reduced for all impurity influx (C, Cu, Fe, …) not enough. - Reduced P LH in beginning of pulse, followed by slow P LH ramp-up 80s pulse duration OK until end of campaign. LH power limit : ~1.6 MW at the end of the campaign. - Statistical limit : associated with the probability of UFOs to appear % of the UFOs lead to disruption. - Dynamical limit : the power threshold seemed to decreased with time. Analysis of CCD and IR films indicate that most UFOs seem to originate from the TPL. Day 8 Day 4

16 TORE SUPRA Association Euratom-Cea A. Ekedahl et al Progress Report DITS project : 13 July 2007 Appearance of UFOs Shot number [F. Rimini] UFO : Increase in P rad > 20% Data averaged over 5 shots Scenario 2 Scenario 1