1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Longmont, CO - PWG F2F Meeting June 25, 2008.

Slides:



Advertisements
Similar presentations
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Advertisements

AIP-2 Kickoff Workshop [Your Topic] Session Overview [Session co-lead names] GEOSS AIP-2 Kickoff September 2008.
© 2006 Open Grid Forum Network Services Interface OGF29: Working Group Meeting Guy Roberts, 19 th Jun 2010.
1Copyright © 2007, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Irvine, CA - PWG F2F Meeting April 29,
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group August 14, 2008 Camas, WA PWG F2F Meeting.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 24 June 2009 Rochester, NY - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Seattle area, WA IDS-Microsoft F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary December 2010 Irvine, CA – PWG Meeting Ira McDonald (High.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group 17 February.
1Copyright © 2010, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
Copyright © 2009, Printer Working Group. All rights reserved. 1 ISTO Printer Working Group Standards in Imaging and Manageability Lee Farrell Chairman.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group October 20, 2010 Lexington, KY PWG F2F.
1Copyright © 2009, Printer Working Group. All rights reserved. MFD Meeting Agenda Monday 1:00-1:15 :Introductions, Assign Minute Taker(s) 1:15-2:15 :Discussion.
Copyright © 2010, Printer Working Group. All rights reserved. 1 ISTO Printer Working Group Standards in Imaging and Manageability Lee Farrell Chairman.
1Copyright © 2009 Printer Working Group. All rights reserved. 1 IPP Working Group Session 18 August 2009 Redmond, WA - PWG F2F Meeting.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group August 6, 2012 Redmond, WA PWG F2F Meeting Joe.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group October, 2008 Lexington, KY PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group June, 2009 Webster, NY PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2010 Scottsdale, AZPWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Bagsværd, Denmark- PWG F2F Meeting August.
1Copyright © 2009 Printer Working Group. All rights reserved. 1Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group August 4, 2010 Bagsværd, Denmark- PWG F2F Meeting.
1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Camas, WA - PWG F2F Meeting August 13, 2008.
1 Copyright © 2009, Printer Working Group. All rights reserved. IPP Working Group Session 9 December 2009 Austin, TX - PWG F2F Meeting.
1Copyright © 2009, Printer Working Group. All rights reserved. Workgroup for Imaging Management Solutions Workgroup Session Printer Working Group/WIMS.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group April 6, 2011 Cupertino, CA PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group Webster, NY- PWG F2F Meeting June 11, 2010.
1Copyright © 2008, Printer Working Group. All rights reserved. Web-based Imaging Management System Working Group Printer Working Group Face-to-Face Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary and IDS WG TCG Activity Summary August 2010 Bagsvaerd, Denmark – PWG Meeting.
PWG-IDS Differences of the attributes between NEA and NAP protocols By Ron Nevo Sharp June 2008.
1 Copyright © 2009, Printer Working Group. All rights reserved. 1 IPP Working Group Session 14 October 2009 Cupertino, CA - PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG -Imaging Device Security (IDS) Working Group February 3, 2011 Wailea-Makena, HI PWG.
1Copyright © 2009, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2009 Waikoloa, HI PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report IDS Working Group February 2, 2011 Wailea-Makena, HI PWG F2F Meeting.
1 Copyright © 2010, Printer Working Group. All rights reserved. IPP Working Group Session 10 February 2010 Scottsdale, AZ - PWG F2F Meeting.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary 10 June 2010 Rochester, NY – PWG F2F Meeting Ira McDonald.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary 7 April 2010 Camas, WA – PWG F2F Meeting Ira McDonald (High.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary TCG Activity Summary May 2011 Webster, NY – PWG Meeting Ira McDonald (High North.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
1 1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
SVQs Business and Administration Launch Events January/February 2011.
Caritas for people with disabilities. Agenda Wednesday Caritas für Menschen mit Behinderungen 10: :45Welcome, short introduction 10:45 – 11:15Introduction.
Break Time Remaining 10:00.
INTERNET SHIELD COURSE F-SECURE ® ANTI-VIRUS CLIENT SECURITY 6.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
Applied Technology CIS-400 Central State University Prof. Hicks.
1..
Development of the Smart Grid Implementation of the Board’s Policies Smart Grid Working Group November 29, 2012.
Adding Up In Chunks.
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
Network Security Workshop Dhaka, Bangladesh 09 – 11 November 2013 Proudly Supported by:
The Future of the Vermont Technology Grade Expectations January 30, 2009.
June 2007Mobile meeting Copenhagen0. Welcome to mobile meeting Copenhagen June 2007.
Let’s take a 15 minute break Please be back on time.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
A Survey of Network Access/Admissions Control Security Practices in Higher Education H. Morrow Long Director, Information Security Yale University Educause.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Imaging Device Security (IDS) Working Group Lexington, KY – P2600 Meeting October 24,
IETF NEA WG (NEA = Network Endpoint Assessment) Chairs:Steve Hanna, Susan Thomson,
P HDSS 6/2/20151 P2600 Hardcopy Device and System Security October 2008 Working Group Meeting Don Wright Director of Standards Lexmark International.
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group December, 2012 Irvine, CA PWG F2F.
1Copyright © 2010, Printer Working Group. All rights reserved. MFD Meeting Logistics The documents and schema used are available from the MFD page
1Copyright © 2012, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2012 Redmond, WA PWG F2F.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February 7, 2008 Irvine, CA PWG F2F Meeting.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
Copyright © 2009 Trusted Computing Group An Introduction to Federated TNC Josh Howlett, JANET(UK) 11 June, 2009.
PWG Plenary Status Imaging Device Security (IDS) Working Group
PWG Plenary Status IPPv2 Working Group
Presentation transcript:

1Copyright © 2008, Printer Working Group. All rights reserved. Imaging Device Security (IDS) Working Group Longmont, CO - PWG F2F Meeting June 25, 2008

2Copyright © 2008, Printer Working Group. All rights reserved. Status Reviewed Network Assessment Protocols Cisco NAC (Network Access Control) TCG TNC (Trusted Network Connect) Microsoft NAP (Network Access Protection) IETF NEA (Network Endpoint Assessment) NAP appears to be the most mature Well documented (public documents) Supported in MS O/S versions Defined an initial set of assessment attributes Current effort is to Develop Assessment Attribute Specification. Map Assessment Attributes into NAP. Determine the required NAP protocol stacks.

3Copyright © 2008, Printer Working Group. All rights reserved. Overview Agenda Ron Nevo Report on differences between NEA and NAP Jerry Thrasher HD Health Assessment Attributes Document Ron Bergman NAP Binding & Proposed Extensions Joe Murdock MS-NAP Protocol Stack Definition

4Copyright © 2008, Printer Working Group. All rights reserved. Detailed Agenda Wednesday, June 25 8:30 Introductions 8:35 Agenda Bashing 8:45 Review Status 8:55 Report on difference between NEA and NAP 10:00 Break 10:15 Review Health Assessment Attributes Doc 11:30 End Thursday June 26 9:00 Introductions 9:05 NAP Binding & Proposed Extensions 10:30 Break 10:45 MS-NAP Protocol Stack Definition 12:15 Wrap-up – Next steps 12:30 End