Team Fuzzy Balls presents: The Ball Stinger Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.

Slides:



Advertisements
Similar presentations
Team Members: Jon DixonMatt SacksDarrin BeamNathan Murray
Advertisements

USER MAINTENANCE.
Mast Storage Rack NNSY Sean Ellis, Philip Crist, Max Carpenter, Gershom Obeng.
ISE 311 Sheet Metal Forming Lab Cup Drawing in conjunction with Section 20.3 in the text book “Fundamentals of Modern Manufacturing” Third Edition Mikell.
Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
Pneumatic Components & Systems Team 1640 Clem McKown – mentor November 2008.
Boyle’s Law.
The bucket of the excavator at a construction site is subjected to 1200-lb and 700lb digging forces at its tip. Determine the magnitude and direction.
Some basics for FIRST Robotics
M.E. 462 Capstone Design I.U.P.U.I. Spring 2007 Bishop Steering: 1970 Lotus Europa Front Axle Re-design Aaron Emmons Phil Palmer Brad Holtsclaw Adam Spindler.
Team Flying Sheep Engineering Analysis Mark Berkobin John Nevin John Nott Christian Yaeger Michelle Rivero.
Project Presentation: The AccuDrill Company: AccuTools Inc.
Feasibility MSA P Base Plate Feasibility 3 plastics were looked at for MSA mounting board material: ABS, Acrylic, and polypropylene. Due to cost.
February 25, 2010 ARMS 1098-C 1 ODOS.  Team Leader Ed Brown – Junior, EET  Team Members Nathan Myers – Sophomore, EET Ben Ross – Junior, CE Lisa Li.
ESCO-Nestable Crate Paul Silver Gary Hicks Chad Freitag Anwar Al-Alawi.
PIT Crew Design Concepts By Dan Chapman, Tim Wilson, and Jon Miller December 11, 2002.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Reflections alum Flocculation Clear Well Sedimentation.
Structure Analysis of 6061-T651 Aluminum Bridge Team Blackboard Mechanical Engineering University of Rochester Team Blackboard Department of Mechanical.
Material Storage and Dispensing Device for the Kitchen Charles E Schaefer, Jr. School of Engineering Department of Mechanical Engineering ME 424 Senior.
Child Proof Dispensing Closure Senior Design – Final Review Team 8: Ken Cardillo, Patrice Hughes Ben Raab, Mike Washko Ben Raab, Mike Washko Company Sponsor:
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
© 2011 Autodesk Freely licensed for use by educational institutions. Reuse and changes require a note indicating that content has been modified from the.
AIR COMPRESSORS & STEAM CLEANERS. Pressurized air is produced by an air compressor. Air compressors are used daily in automotive shops. They are used.
Sheet Metal Bending.
Team Wrecked Week 9 Deliverables: Engineering Analysis.
Team Gun Show Final Presentation December 1, 2004 Group Members: Nate Griggs Clay Hamlin Marc Manning Jon Megahy Van Vo Joel Williamson.
Integrated GPS and Shock Collar Housing Nathanael Skiver, Brent Berg, Blaine Hutchinson, and Ryan Pedersen Advised by: Dr. Peter Gorder and Dr. Valmiki.
Design for Manufacturing Team: Constraints:  Main construction material should be wood  Other materials such as metal, fabric, or plastic may be used.
Jorge Corujo Sandín Wilfredo Mercado Torres Débora Pagán Díaz Anthony Silva Reyes Faculty Advisor : Vijay K. Goyal, PhD Course: INME 4058 University of.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
Universal Plug Holder Jonathan Rajkowski Benjamin Dean Jonathan Fitzwater.
Part Drawings October 30, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Engineering 309: Machine Design I Instructor: Dr. Min Lu Presented by: Mike Kraft Thanh Nguyen.
Design of a Wheelchair-Mounted Transfer Assist Device University of Pittsburgh Senior Design – BioE 1160/1161 Michael Anderson Andrew Feola Jill Marion.
Jason Harris Capstone Design Presentation April 20, 2001.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
Team Rock On Final Presentation ME 4182 Submitted 7/25/06 Yuki Miyasaka, Anthony Palladino, David Price, Whitney Price, Ricky Sandhu.
Senior Design Ideas Team INASAD Members: Jose Medina Joseph Leone
Background: Used to generate a pressure gradient shock wave traveling down a closed tube.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
FUEL TANKS, LINES, FILTERS, and PUMPS CBCAUTOMOTIVERKCBCAUTOMOTIVERK.
Kenya Make Energy? By Evan Tony – Thomas Landi – Peter Son –
Unit 91 Week 7 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt October 1, 2008 Final Presentation.
MAST STORAGE RACK Philip Crist Max Carpenter Sean Ellis Gershom Obeng.
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
An Introduction to engineering analysis
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant
Engineering Analysis October 23, 2006 Team Moondogs Chris Culver Rahul Kirtikar Elias Krauklis Christopher Sampson Michael Widerquist.
Engineering Analysis ME 4182 Submitted 6/28/06 Yuki Miyasaka, Anthony Palladino, David Price, Whitney Price, Ricky Sandhu.
Team INASAD Members: Jose Medina Joseph Leone Andrew Merk Alex Sanders Michael Fox.
ME 4182 Final Presentation Manual Trash Compactor December 06, 2006 Team Moondogs From Left Elias Krauklis, Mike Widerquist, Chris Culver, Chris Sampson,
Team Ramrod Collapsible ATV Cargo Carrier April 26, 2006 Josh Carter Blake Forbes James Lee Hunter Moore Bryan Webster.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Team Fuzzy Balls Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud.
Bicycle Wrench Analysis
1 AIR COMPRESSORS Auto Collision Repair/Refinishing Year One.
7/8/08 John Amann LC Mechanical Engineering LC 18M W Beam Dump Mechanical Engineering Design Updates.
PRESSURE VESSEL. 1.Determine the bursting steam pressure of a steel shell with diameter of 10 inches and made of ¼ in thick steel plate. The joint efficiency.
Temperature Test Allows monitoring of temperature changes.
FINAL PRESENTATION UNIVERSITY OF CINCINNATI
Shaping operations are generally divided into three groups based upon how the parent metal flows or deforms during the shaping process ,namely Bending.
Snag Boat Final Presentation
3-D Printed Pressure Vessel Design to Maximize Volume to Weight
Telescope - Mechanical
Sheet Metal Forming Lab Cup Drawing in conjunction with “Fundamentals of Modern Manufacturing” Third Edition Mikell P. Groover.
My engineering project tipping swarf bin
Fuel Supply System Service
Expandable Wheelchair Final Report
Bicycle Wrench Analysis
Pipe-Line Anchor Block Optimization
Presentation transcript:

Team Fuzzy Balls presents: The Ball Stinger Waqas Abbasi Dusty Ashberry Daniel Grant Chadwick Harris Gene Karshenboym Robert Ricaud

Team Fuzzy Balls2

3 Overview Problem Statement Product Description and Functional Requirements Conceptual Designs Selection Analysis Engineering Analysis Prototype: Stage 1 Design Problems Modified Prototype Video Demonstration Completed Design Cost Analysis

Team Fuzzy Balls4 Problem Statement When a can of pressurized tennis balls is opened they begin to loose pressure after approximately 3 hrs of play Through non-pressurized storage the tennis balls will continue to loose internal pressure This loss of pressure greatly affects the performance of the tennis balls.

Team Fuzzy Balls5 Problem Statement Cont. Tennis coaches and avid players use a high volume of tennis balls on a daily basis. The cost to replace the balls due to pressure loss is a financial burden.

Team Fuzzy Balls6 Product Description and Functional Requirements A pressurized storage system used to maintain/replenish tennis balls to increase longevity and performance. Functional requirements/desires 1. SAFETY 2. Hold a pressure of 14 psi 3. Maximize capacity (minimum 150) 4. Easy to use 5. Does not hinder regular routine of user

Team Fuzzy Balls7 Conceptual Designs Sliding Lid, Buckle Top, and Cylinder Sliding Lid Buckle Top Cylinder

Team Fuzzy Balls8 Comparative Baseline Ball Charger

Team Fuzzy Balls9 Selection Analysis Criteria Weights CapacitySizeEaseSafetyPortabilityDummyTotal Capacity Size Ease Safety Portability Dummy

Team Fuzzy Balls10 Selection Analysis (Cont.) Design Analysis SizeCapacityEasePortabilitySafetyRawNorm. Sliding Lid Buckle Top Cylinder Ball Charger

Team Fuzzy Balls11 Engineering Analysis Deflection of Lid w/ Corner Supports:Deflection of Lid w/ 8 Supports:

Team Fuzzy Balls12 Engineering Analysis (Cont’d) Buckles: Total tensile strength must be greater than 600 lb. for N = 2 d= 1/8 in =.125 in F = 600 lbf Therefore, the yield strength of the material must be approx kpsi. Most low alloy steels have yield strengths greater than 50 kpsi.

Team Fuzzy Balls13 FEA data Polyethylene Max deflection: 93 inches ABS Plastic Max deflection: 1 inch

Team Fuzzy Balls14 Prototype: Stage 1

Team Fuzzy Balls15 Part Drawings: Container

Team Fuzzy Balls16 Prototype Lid

Team Fuzzy Balls17 Part Drawings: Lid

Team Fuzzy Balls18 Part Drawing: Gasket

Team Fuzzy Balls19 Wiring Schematics AC Power Pressure Switch ≥15 psi <15 psi Compressor Common Switch

Team Fuzzy Balls20 Design Problems Container Experienced Bulging Due to an inadequate container thickness and non-ideal box material Buckles would fail due to lid bending Replaced Air Compressor Air Compressor was inadequate because of 2- stroke design which could allow air to leak from container

Team Fuzzy Balls21 Solution to Design Problems Straps were placed to redistribute the forces that caused bulging Replace buckles with clamps An airbrush compressor replaced original tire compressor

Team Fuzzy Balls22 Modified Prototype Design Movie Page

Team Fuzzy Balls23 Final Design Criteria Container thickness changed to 3/8” ABS polycarbonate plastic 4 buckle latches will be used to secure the lid

Team Fuzzy Balls24 Cost Analysis Prototype Box: $78.00 Lid: $ Pump: $45.00 Fittings: $40.00 Sealant: $5.00 Handles/Latches: $30.00 Total: $ Design Box: $ Lid: $40.00 Pump: $10.00 Fittings: $15.00 Sealant: $1.00 Handles/Latches: $10.00 Total: $ These prices reflect mass unit production.

Team Fuzzy Balls25 Website Team Fuzzy Balls

26 Questions