Some Requirements for Projector & Display Management Rick Landau Dell 12 July 2005.

Slides:



Advertisements
Similar presentations
Integrating Opengear console servers into Zenoss monitoring.
Advertisements

1 Copyright © 2002 Pearson Education, Inc.. 2 Chapter 1 Introduction to Perl and CGI.
PWG Quarterly Oct 2006 WIMS CIM Update Project Status Rick Landau Dell, CTO Office 2007/02/08 V0.1.
1Copyright © 2008, Printer Working Group. All rights reserved. PWG-DMTF Alliance Work Rick Landau, Dell Printer Working Group (PWG) DMTF Alliance Partner.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Workgroup for Imaging Management Solutions (WIMS/PMP) Printer.
PWG F2F Mtg, Plenary Session, August 2008 Projector & Display Management WG Status Rick Landau Dell, CTO Office 2007/08/08 v0.1.
POSSIBLE Projector Subunits (Subsystems) and Their Contents Rick Landau, Dell, and Projector & Display Management BOF 2006/09/13.
POSSIBLE Projector Subunits (Subsystems) and Their Contents Rick Landau, Dell, and Projector & Display Management BOF 2006/09/13.
PWG-CIM Alignment 2005 Rick Landau (Dell) 2005/09/06.
1Copyright © 2007, Printer Working Group. All rights reserved. PWG Projector & Display Management (PDM) Working Group (summary to be inserted into plenary.
PWG-CIM Alignment 2005 Rick Landau (Dell) 2005/09/29.
Projector Subunits (Subsystems) and Their Contents Rick Landau, Dell, and the Projector & Display Management WG 2007/06/18.
Greenstar Nomad two-way portable telephone and Web access - anywhere in the world completely solar-powered, portable, rugged specially-configured laptop.
Quality of Service Update
2 Mega-Pixel PoE Plus Speed Dome Internet Camera
M100 Product Presentation May M100  Display terminal managed by AVL box commands  Simple protocol over Serial interface  Semi-Autonomic functions,
Module 5 Devices Used in Presentations Dr. Steve Broskoske Misericordia University.
Remote Monitoring and Management Solutions ®
April 2004 page 1 Confidential and propietary CentraLine Portfolio c l o s e t o y o u.
Philips Research France Delivery Context in MPEG-21 Sylvain Devillers Philips Research France Anthony Vetro Mitsubishi Electric Research Laboratories.
Chapter 4 Commissioning Wireless Devices. Field Communicator  A Field Communicator is used to configure HART devices. WirelessHART devices are preconfigured.
What is adaptive web technology?  There is an increasingly large demand for software systems which are able to operate effectively in dynamic environments.
Internet Technologies Networking / Internet Protocols (TCP/IP) Server/Client Software Communication via Ports Web Page Technology Recipe of Web Page Development.
A+ Guide to Software, 4e Chapter 11 Supporting Printers and Scanners.
Terms 1. VGA VGA - Short for Video Graphics Array, VGA is a popular display standard developed by IBM and introduced in 1987 VGA provides 640 x 480 resolution.
SoNDa Sensor Network for Data Explore! 1. SoNDa Sensor Network for Data Explore! KEYWORDS Wireless Sensors Communication 2.
Hardware Input & Output Devices Adam Morte Van Logan Tom Rollino.
CHAPTER 2 Input & Output Prepared by: Mrs.sara salih 1.
HiVision SNMP Software.
Download & Play E-Learning System PROPOSAL draft1.0.
TERMS TO KNOW. Programming Language A vocabulary and set of grammatical rules for instructing a computer to perform specific tasks. Each language has.
UPnP™ QoS WC Progress Narm Gadiraju Co-Chair of UPnP™ QoS WC Intel Corporation.
Computer Hardware and Networking Terms List By: Christian Lawrence.
1 Remote Management of Wireless Gateway Student Name: Dinesh D N (BITS ID: 2004HZ12158) MphasiS Technologies Ltd, Bangalore March 2006.
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
Ch Review1 Review Chapter Microcomputer Systems Hardware, Software, and the Operating System.
Enterprise PI - How do I manage all of this? Robert Raesemann J Jacksonville, FL.
Web Programming : Building Internet Applications Chris Bates CSE :
1 © 2006 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID Scientific Atlanta Configuration Module 2.3.
1 Weblite Product Introduction. 2 Control Equipment via the Internet 8 Universal Inputs 8 Universal Outputs software selectable as analog or digital signals.
VPL Series – Installation Projectors VPL-CX Series VPL-PX Series VPL-FX Series.
Hardware Training Product: ITMS2.
Stuff By Zach and Turtle To designate a default printer, choose Start > Control Panel > Printers and Faxes. Right-click the printer, and then.
By Bradley Scott Melis. 1. Understand Word Basics 2. Use AutoText 3. View a Document 4. Set Margins and Specify page orientation 5. Insert page breaks.
1 Syllabus at a glance – CMCN 6103 Introduction Introduction to Networking Network Fundamentals Number Systems Ethernet IP Addressing Subnetting ARP DNS.
Introduction The Epson LCD projector is a highly versatile presentation tool. The projector can utilize up to two computer sources, and up to three video.
COMPUTER SYSTEM FUNDAMENTAL Genetic Computer School INTRODUCTION TO NETWORKING LESSON 8.
Component 8/Unit 1bHealth IT Workforce Curriculum Version 1.0 Fall Installation and Maintenance of Health IT Systems Unit 1b Elements of a Typical.
Overview Presentation MKT-DSRV-P- 001E. Product Overview Network based video transmission product with on-board digital recording Allows analogue fixed/PTZ.
Dell Confidential PWG Quarterly Oct 2006 Projector & Display Management BOF Status Rick Landau Dell, CTO Office 2006/10/25 v0.1.
IN5110 The affordable & hassle-free WUXGA upgrade.
VIVOTEK 2007 Product Roadmap
© 2006 Cisco Systems, Inc. All rights reserved.
Principles of Information Technology
LCD Network Monitor.
POSSIBLE Projector Subunits (Subsystems) and Their Contents
Some Requirements for Projector & Display Management
PWG Quarterly Feb 2007 Projector & Display Management BOF Status
PWG Plenary Status Report Workgroup for Imaging Management Solutions
POSSIBLE Projector Subunits (Subsystems) and Their Contents
PWG Quarterly Sept 2007 Projector & Display Management WG Status
Web-based Imaging Management System WG
PWG Quarterly Oct 2006 WIMS CIM Update Project Status
Some Requirements for Projector & Display Management
PWG Projector & Display Management (PDM) Working Group
Some Requirements for Projector & Display Management
DMTF Alliance Partner Technical Symposium
PWG-DMTF Alliance Work
Chapter 11: Printers IT Essentials v6.0 Chapter 11: Printers
POSSIBLE Projector Subunits (Subsystems) and Their Contents
Presentation transcript:

Some Requirements for Projector & Display Management Rick Landau Dell 12 July 2005

2 Projectors & Displays: Draft Charter Projector or display is another imaging device – From portable video projector to jumbotron – A built-in utility at some location, like a shared printer – Use existing management models from printer technology Consolidate several current proprietary management solutions Next Steps – Organize a working group: people, goals, use cases – Find a home in a standards organization – Develop model(s) of devices, schema; test interoperability – Publish SNMP MIB and Web Service specs Current interest: Dell, Epson, NEC, Sony, Spinoza Technol., looking for more

3 Projectors & Display: Scope of Effort What to manage: Projector devices and video displays – From portable projectors to large digital signs Installed projectors, kiosks, jumbotrons, theater projectors,... – From plain video input to page description languages Video, bitmaps, mpeg, ppt, html, pdf, postscript,... Wired or wireless management What to manage: Data – Static Asset info, capabilities, resolutions, languages, interfaces,... – Configuration Comm channels on/off, keystoning, autofocus, light intensity, – Dynamic Bulbs & backlighting health & lifetime, temperature, fans,...

4 Backup

5 Scope of Devices Projector devices and video displays – Generally, but not always, installed in fixed location – Projected, backlit, or individual pixel display – Range of devices from plain video input to language interpretation video-----html-----postscript – Range of devices from portable projectors to digital signage projector -----kiosk display-----jumbotron – Wired or wireless management

6 Goals of Management Reduce cost of ownership Increase user satisfaction – Installed projector always works – I don't have to carry a projector with me – I don't have to stock spare projectors, just bulbs Increase quality of service and availability – Hiqh-quality image, bright image – No missing pixels Reduce user dissatisfaction – Primary dissatisfiers: lack of availability, reliability, poor appearance

7 What Characteristics to Manage? Static capabilities: what the device can do if it is healthy – Asset info, version info, display resolutions, communications supported, languages supported, inputs supported, etc. Configuration: restrictions on or site-specific values for capabilities – Comm channels and inputs on/off, light intensity, keystoning, zoom, autofocus, preferred resolutions, color balance Dynamic status: anything that affects the usability of the device – Immediately: bulb, backlighting, pixels, fan, temp, communications – Future: consumption of bulb lifetime, running temp high

8 Printer-like Subsystems of a Projector Subsystem of PrinterPossible interpretation for Projector Inputsn/a Median/a Outputsn/a MarkersResolutions available for display SuppliesConsumables: bulbs ChannelsCommunications paths: LAN/WAN protocols, other connections (e.g., serial port) InterpretersLanguage interpreters, with capabilities, version info ConsoleFront (top) panel lights AlertsWarning and critical failure events for all the other subsystems

9 Other Subsystems of a Projector Fans, cooling, shutdown timing, temperature, thresholds Display geometry (not quite analogous to paper sizes): keystoning (perspective correction), zoom, aiming Other?

10 Current Interested Companies, People Dell: Rick Landau (editor), Nick D'Alessio Epson: Hiroshi Midorikawa (editor) NEC: Ara Kouichi Sony: Imahashi Kazuyasu Spinoza: Randy Massengale