Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide1/17 – 3 rd May, 2010 REVIEW OF HAITI 2008 PDNA Process Lessons Learned and Key Reflections.

Slides:



Advertisements
Similar presentations
POST DISASTER NEEDS ASSESSMENT
Advertisements

Working Together for Greater UN Impact Repositioning the UN in a changing aid environment The case of Country xxx July 2005 Harmonization & Alignment to.
UNDGO – UNDP BCPR – OCHA JOINT INITIATIVE ON RECOVERY COORDINATION (JI) DGO TRANSITION WORKSHOP Cairo, 6 March 2008.
UNCT Planning Process in post crisis context DOCO training November 2008.
Delivering as One UN Albania October 2009 – Kigali.
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
ARF Training: Developing a Common Framework for Post-Disaster Needs Assessment, Recovery and Reconstruction in Asia Bangkok, November 2010 EU-UN-WB.
Joint presentation by respective units in DGs AGRI, EMPL and REGIO IPA Components III, IV and V: Conditions for successful preparation and absorption of.
Materials Course or Module Title – Presentation NN – Block NN – Slide1/NN (number of slides) – 16 August 2014 United Nations Development Programme REVIEW.
“ONE UN”: Delivering as One at the Country Level.
High Level Regional Consultation for Policy Makers to Enhance Leadership in Planning the National HIV & AIDS Response S P Aligning AIDS & Development Planning.
United Nations Development Programme REVIEW OF Burkina Faso PDNA Process Lessons Learned and Key Reflections.
Session 4 Responding to an Emergency. Objectives At the end of this session, you will: Be familiar with the RC/HC Handbook and the Emergency Checklist.
GNC Governance Review Preliminary Report for Discussion 9 th July 2013.
HIV/AIDS: An Unprecedented Development Crisis –One of the biggest obstacles to achieving MDGs – UNGASS 2001 –Strikes at the core of development Reverses.
Session V: Programme Roles and Responsibilities
Evaluation of OCHA’s Role in Humanitarian Civil-Military Coordination Findings and Recommendations Seminar on Evaluation of UN Support for Conflict Affected.
WRC 2 World Reconstruction Conference 2 Resilient Recovery- an imperative for sustainable development Conference Objective To advance consensus on resilient.
Management Consulting Team (MCT) UNDP/BCPR DISASTER-RELATED INTERVENTIONS Disaster Risk Reduction Early Recovery SURGE capacity 0.
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING
The Process of Conducting a Post Disaster Needs Assessment (PDNA) United Nations Development Programme Bureau for Crisis Prevention and Recovery Bangkok,
Materials Course or Module Title – Presentation NN – Block NN – Slide1/NN (number of slides) – 30 August 2015 United Nations Development Programme REVIEW.
A common framework for post- disaster needs assessment & support of disaster recovery & reconstruction in high-risk countries United Nations Development.
Implementing UNFPA’s Strategic Plan Scaling up humanitarian action Draft 6 th February 2014.
Materials Course or Module Title – Presentation NN – Block NN – Slide1/NN (number of slides) – 10 September 2015 United Nations Development Programme REVIEW.
The Preparatory Phase Proposal a first draft to be discussed.
Cross-cutting areas of Capacity Building and Adaptation UNDP Workshop for NIS Environmental Focal Points June 2004.
Disaster risk reduction – How did we get here?
Contingency Planning and Emergency Preparedness Process and Practice PCWG Protection Cluster Coordination Training 2008.
Emergency preparedness and response for nutrition 2 nd June 2015.
South Asia Earthquake: Transition from Relief to Development Joint Executive Board of UNDP, UNFPA, UNICEF and WFP New York, 20 January 2006 Presented by:
POST DISASTER NEEDS ASSESSMENT I n t e r n a t I o n a l R e c o v e r y P l a t f o r m.
1. IASC Operational Guidance on Coordinated Assessments (session 05) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
International humanitarian standards under the leadership of the GoV Ha Noi, 4 November 2008.
The IASC Humanitarian Cluster Approach Angelika Planitz UNDP BCPR Developing Surge Capacity for Early Recovery March 2006.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Global Task Team: Improving AIDS Coordination Among Multilateral Institutions and International Donors Briefing for Theme Group on HIV/AIDS 1 November.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Commissioning Self Analysis and Planning Exercise activity sheets.
Materials Course or Module Title – Presentation NN – Block NN – Slide1/NN (number of slides) – 10/15/2015 United Nations Development Programme REVIEW OF.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
SUPPORT TO THE ESTABLISHMENT OF THE ACADEMY OF POLICE SCIENCES IN SYRIA Project Overview UNDP Syria April 2009.
The Early Recovery and Reconstruction Cluster in Pakistan - From saving lives to restoring livelihoods - Angelika Planitz UNDP BCPR Shelter Meeting May.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
WEBINAR 3 rd UN DCF Survey on Global Accountability Office for ECOSOC Support and Coordination, UNDESA.
Food Security Cluster Inception Meeting, Rome May The Role of the FSC partners at the global level in supporting country response Tuesday.
Coordination Session 2.5 WASH Cholera / AWD EP&R training.
Aid Coordination Roundtable Meeting 09 July 2009 Accra Agenda of Action and The Paris Declaration.
Preparatory Stakeholder Workshop - Laos 26 May 2010.
IASC SWG on Preparedness Five Country Initiative Progress 29/06/2009.
Vito Cistulli - FAO -1 Damascus, 2 July 2008 FAO Assistance to Member Countries and the Changing Aid Environment.
Experience in Turkey and SEC.  Regular communication with stakeholders  Attending seminars and conferences for FAO visibility  Following possible funds.
Changing the way the New Zealand Aid Programme monitors and evaluates its Aid Ingrid van Aalst Principal Evaluation Manager Development Strategy & Effectiveness.
Moldova Floods Joint Government and Development Partners response Chisinau, July 29, State Chancellery Government of Moldova.
1.1.Recovery strategic planning capacities are strengthened. 1.2.Local capacity for ER planning and implementation strengthened in areas of expertise where.
IASC Task Team on Accountability to Affected Populations and Protection from sexual Exploitation and Abuse (AAP/PSEA) What should happen with the TT after.
17 OCT PHT MEETING – SUVA, FIJI Early Recovery Cluster Lead agency: UNDP.
Bangladesh Joint Country Assistance Evaluation: Assessing Total ODA at the Country Level Presentation to OECD DAC November 2006 Bruce Murray Director General.
EFA: Now and Post-2015 E9 Senior Official Meeting New Delhi 8 November, 2012 Olav Seim, Director, EFA Global Partnerships Team, UNESCO.
CDP-GIZ research project – Paris Workshop Gesellschaft für internationale Zusammenarbeit GmbH André Lammerding, Head of Programme International Water Stewardship.
Support to National REDD+ Action: Global Programme Framework (SNA) Work Plan and Budget 2015 Information and Knowledge Sharing Sessions Twelfth.
Common Needs Assessments Context: Sudden onset humanitarian emergencies: Can and should logistics play a stronger role in rapid assessments?
Civil Society Participation and Contribution to the UNCAC Review Process Towards Transparency – TI National Contact Vietnam UNCAC Self Assessment Process:
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
ERF Briefing for WASH Cluster
Regional preparatory process for Rio+20
Early Recovery in Haiti
Local Based Programing
Humanitarian Architecture in Bangladesh
Presentation transcript:

Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide1/17 – 3 rd May, 2010 REVIEW OF HAITI 2008 PDNA Process Lessons Learned and Key Reflections

The disaster event 3 Hurricanes and 1 Tropical Storm a significant impact on many regions of the country, particularly in the north Fourth most devastating catastrophes in Haiti's 20 th century killed 424 people and injured 301, 67 people were still missing 200,000 families have been affected 850,000 to 1 million people have been affected Gov priorities: (1) Restoring accessibility (roads, bridges); (2) Removing embankments; (3) Ensuring mass distribution of food in affected areas (baby food); (4) Procuring sanitary items including waste and personal hygiene; (5) Ensuring water drainage in plantations (6) Strategizing socio-economic recovery; (7) Strengthening sectoral intervention Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide2/17 – 3 rd May, 2010

Timeframe Initial phase (following the disaster event, 03 Sept.’08): Contact, trilateral agreement, draft TOR (UNDP/BCPR; UNDP CO; EC and WB) Preparation Phase (September 14-27, 2008) Preparatory mission responding to GoH request establish coordination points, identify entry points, contacts and focal points in the GoH, Terms of Reference. Plan and schedule Training (01-02 Oct 2008) Assessment (October October 2008) Compilation and Report Writing (October 15-20, 2008) Presentation of Results (October 21, 2008) Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide3/17 – 3 rd May, 2010

Roles and relationships GoH interlocutors: Ministry of Planning and Civil Protection With long history relationship with WB/ECLAC Other assessment previous 6 mos, report was yet to be submitted Strong link bet WB and Min of Planning WB/ECLAC arrived with explicit mandate and a “turn key” system (methodology, money, people, backup supports) Motivated by the emergence of PDNA as a natural progression of the DaLA evolution into JDLNA Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide4/17 – 3 rd May, 2010

Roles and relationships cont. EC is a “new comer”, interested to set future role precedent in PDNA:  EC Brussels assuming role of ‘delegating authority’;  resources to be obtained through a ‘contribution agreement’ that would lay the foundation for future funding of PDNA;  BXL and PAP disconnected which was apparent once assessments had started; UN: Integrated mission Complicated UN structure and mechanism: MINUSTAH with renewable mandate for politics and security UNRC/HC managing humanitarian and development affairs Dynamic bet UNRC/HC, UNDP CO, OCHA, MINUSTAH Complex implementation of Cluster model: confusion regarding ER network, plus the presence of 2 advisors All agencies reps participated in preparatory workshop Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide5/17 – 3 rd May, 2010

Lessons from Myanmar PDNA WB and UN managers and experts were inspired by Myanmar “success”, but uncertain how to proceed  Same players from Myanmar, had good rapport, agreed on closed coordination  Excited by prospect of “integrated PDNA” but there was methodological tension:  WB believes the DaLA should be the overarching methods  UNDP apprehension that HRNA will be “swallowed” by DaLA, Agreed on “One report” with a consolidated table Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide6/17 – 3 rd May, 2010

A two-day training Approx. 40 pax (Ministries, UN agencies, opened by Minster of Planning) An attempt to project a parallel approach of DaLA and HRNA:  Constant adjustments in post dinners, pre-session breakfasts DaLA delivered conventional, established module HRNA was struggling with contending approaches  Myanmar's community authentic enumeration?,  LAC's workshop type assessment)  Strong believe that there were sufficient data at hand  No substantive methodology being presented Disjointed presentations generated massive confusion Splitting into two methodology-driven groups with hardly any coherent interaction between the two groups Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide7/17 – 3 rd May, 2010

Overview of PDNA Process Process towards consensus on overall approach DaLA and ERNA agreed to call a coordination meeting team of Government, Jointly drafted an outline of common report: leaving the sub-topics to evolve DaLA proceeded with sectoral data collection ERNA organised a three-day workshop with local governments (LAC Model) questionnaire sent out beforehand Combining sectoral to geographical perspectives To approximate the agreed logic: event – effect – impact – recovery – requirements Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide8/17 – 3 rd May, 2010

Overview of PDNA Process Operationalisation of corporate agreement in the field; A new sense of optimism, translated the partnership Framework and Joint Declaration into practice Roles became clearer Use of comparative advantages of different agencies Agencies identified Sector Experts for DaLA and ERNA ERNA worked with UN Agencies under UNRC/HC remit and using ER Cluster / Network roll-out Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide9/17 – 3 rd May, 2010

Resource Mobilization: EC Contribution Agreement (Euro 151,812) The EC committed to the (partial) funding Requested a ‘contribution agreement’ up to the completion of PDNA Took two months after the assessment to organise the operational details creating EC Trust Fund "Haiti – PDNA Support” Linking the assessment, ER coordination, and a Review Conference Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide10/17 – 3 rd May, 2010

Overview of PDNA Process cont. Data collection and analysis:ERNA All affected districts were invited through Civil Protection network to a three- day workshop at PAP, each consisted of: Local government Civil Protection Civil Society Analysis based on PRSP, baseline data, and district damage reports Based on the District workshop, a conversion table was developed for ERNA to reconcile sectoral needs and geographical distribution Each clusters was invited to calibrate the table with their workplan Resulted in costed early recovery needs Side-by-side with DaLA long term figures in a final consolidated table Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide11/17 – 3 rd May, 2010

Overview of PDNA Process cont. Report Finalisation A principal writer was hired and to be part of the mission from the beginning, and to stay behind to finalise the write up Used the agreed report outline as a pattern throughout the reporting Guided by PRSP priorities as the axis for the analysis and presentation of needs Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide12/17 – 3 rd May, 2010

Lessons Learned What worked? Effect of joint effort. Internal UNDP (HQ, regional, and national level plus Brussels) Coordination within the UN (humanitarian) system Re-assurance of approach and support from EC for PDNA Agreement WB on key inputs Government buy-in What didn’t work? Main constraints of joint approach. Constant battles were exhausting and at time counterproductive No established methodology for HRNA Unresolved: PDNA as resource mobilisation vs recovery planning What needs to be improved? What capacities are needed in govt? RCs?HCs, WB and EC counterparts? UN system? Others? Information management Systems Training Materials, templates for data, analysis, reporting Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide13/17 – 3 rd May, 2010

Lessons Learned Cont. Was guidance provided by headquarters? Was it useful? Why/why not? HQ players were on the ground directly negotiating the terms General agreement over the Joint Declaration was helpful Draft PDNA provided some pattern to follow Reflections on improving relationship between partner agencies, communications, logistics, decision making, etc. A well prepared TOR is crucial Strong leadership from UNRC/HC is indispensable Involvement of “usual suspects” helped bridge the gaps Utility of the recovery framework? Recovery framework was followed through into UNDP programming Closing the gap with the PRSP Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide14/17 – 3 rd May, 2010

Lessons Learned Cont. Ability to monitor the recovery framework Monitoring of recovery framework is not built in the PDNA Sector specific lessons Not known Have best practices been identified, institutionalized and shared? Nor known Other major issues raised by PDNA process Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide15/17 – 3 rd May, 2010

Lessons Learned Cont. How much did your institution invest in the PDNA (financial, technical, logistical, resources)? How much did counterparts invest in the PDNA (financial, technical, logistical, resources)? EC funding contribution UN agencies at HQ level were willing to participate but with no funding commitment CWGER funded their deployments with no clear expectation on deliverable Costing was contingent to methodology without which became programme wise quite difficult to predict Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide16/17 – 3 rd May, 2010

Relationship of PDNA and the recovery process What recovery strategies have been undertaken since the crisis? ER activities in affected areas: including watershed management; urban infrastructure rehabilitation; strengthening of CO capacities UNDP early recovery programme submission followed PDNA recommendations How much has been invested in recovery? In 2009: 1.6 Mio USD by BCPR; 6.5 Mio USD by UNDP (incl. BCPR) Nature of relationship between assessments undertaken/PDNA recovery framework developed and actual strategies and investments? At the UN system level not immediately known Documentation of recovery activities: existence/effectiveness of monitoring system? The contribution agreement outlined the importance of monitoring programme activities; ER advisors were to play a key role Activities related to PDNA and ER initiation are documented in the Final donor report to the EC and on the Haiti CO website Review of Haiti 2008 PDNA Process – Presentation NN – Block NN – Slide17/17 – 3 rd May, 2010