A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview ONON RIVER BASIN.

Slides:



Advertisements
Similar presentations
3-Year Implementation Schedule. What is the 3-Year Implementation Schedule? A list of prioritized projects for implementers with a time frame to complete.
Advertisements

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 1 BRAVO Drafting Guidelines Authors and approvals List.
FEASIBILITY STUDIES INFORMATION SESSION. OVERVIEW  Background and approach the feasibility studies  Guidelines ♦Discussion of terms of reference ♦Sustainability.
Session 12 Theory of Change. Session Objectives Module 1, Unit 3, Session 12 By the end of this session, campaign managers should be able to: Define a.
Vietnam's Wildlife Trade Policy Review project. Vietnam’s WLT Policy Review project The wildlife trade policy review was undertaken within with.
The Rare Pride Campaign on Conservation of the Manchurian Tiger in Hunchun, P.R.China BRAVO: Barrier Removal Assessment and Viability Overview Part 1 :
Pride Campaign Barrier Removal Projects Viability and Potential Impacts Assessment Tool BRAVO: Barrier Removal Assessment and Viability Overview BESITANG.
INSTRUCTIONAL LEADERSHIP FOR DIVERSE LEARNERS Susan Brody Hasazi Katharine S. Furney National Institute of Leadership, Disability, and Students Placed.
Introduction to Human Resource Development Moving from HRM to HRD Contd…. Lecture 10.
Community Planning Training 1-1. Community Plan Implementation Training 1- Community Planning Training 1-3.
Charting a course PROCESS.
Collaboration Nation: Piloting EPA’s Small Local Governments Compliance Assistance Policy Ken Harmon, Attorney Office of Compliance U.S. Environmental.
Meeting SB 290 District Evaluation Requirements
BRAVO: Executive Summary BRAVO: Barrier Removal Assessment and Viability Overview Economics Technical Cultural/Politics Impacts&Metrics Tripa Peat Swamp.
Organization Mission Organizations That Use Evaluative Thinking Will Develop mission statements specific enough to provide a basis for goals and.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Econoics Technical.
The Rare Pride Campaign in the Yuhe Provincial Nature Reserve, Gansu Province A tool for assessing the feasibility and impact potential of Rare project.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
January 31, 2014 Data Use Information and Guide. Copyright © 2014 New Teacher Center. All Rights Reserved. What is “TELL Oregon” ? TELL Oregon is an anonymous.
Training of Process Facilitators Training of Process Facilitators.
Rare project plans viability and potential impacts assessment tool BRAVO: Barrier Removal Assessment and Viability Overview Sungai Lamandau Wildlife Reserve/RARE.
J.B. Speed School of Engineering University of Louisville KEEPS Energy Management Toolkit Step 3: Set Performance Goals Toolkit 3A: Set Energy Performance.
FewSomeAll. Multi-Tiered System of Supports A Comprehensive Framework for Implementing the California Common Core State Standards Professional Learning.
Developing a result-oriented Operational Plan Training
Rare project plans viability and potential impacts assessment tool BRAVO: Barrier Removal Assessment and Viability Overview Tun Mustapha Marine Park Economics.
Gaana Balbar Set our taimen free CRITICAL ANALYSIS PRESENTATION.
Communication System Coherent Instructional Program Academic Behavior Support System Strategic FocusBuilding Capacity.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
BRAVO: Barrier Removal Assessment and Viability Overview GEUMPANG FOREST COMPLEX Economics Technical Cultural/PoliticsImpact&Metrics.
BRAVO: Executive Summary What: there are threats to the low land tropical rain forest - the habitat of Bali Starling (Leucopsar rothchildii) - in Bali.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Baima Snow mountain.
UJUNG KULON NATIONAL PARK, BANTEN, JAVA Campaign for Sustainable Agriculture.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Ujung Kulon National.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Abaco Island Pride.
Module IV: Building Organizational Capacity and Community Support Cheri Hayes Consultant to Nebraska Lifespan Respite Statewide Sustainability Workshop.
Mountains and Plains Child Welfare Implementation Center Maria Scannapieco, Ph.D. Professor & Director Center for Child Welfare UTA SSW National Resource.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview ONON RIVER BASIN.
Office of Special Education Programs U.S. Department of Education GRANT PERFORMANCE REPORT FOR CONTINUATION FUNDING.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Chuuk Lagoon Campaign.
The Rare Pride Campaign on Conservation of the Manchurian Tigers in Hunchun, P.R.China BRAVO: Barrier Removal Assessment and Viability Overview Part 3.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Chuuk Lagoon Campaign.
Optimising results of protected area management efforts – a capacity building workshop Sportsman’s Arms Hotel, Kenya 27 th Nov – 1st Dec.
CR TOOLKIT WORKSHOP MANAGEMENT TOOLKIT - RESETTLEMENT PLANNING Ref – ICMM CD TOOLKIT # 18 - Trainer: Martin Paining Date: 28 th of November, 2013.
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Bahia Loreto National.
Mountains and Plains Child Welfare Implementation Center Maria Scannapieco, Ph.D. Professor & Director Center for Child Welfare UTA SSW Steven Preister,
Veracruz Raptors River: Towards the protections of habitats in the Central Coast of Veracruz: World Heritage Migratory Corridor A tool for assessing feasibility.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview Include Site/Project.
Kathy Corbiere Service Delivery and Performance Commission
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Board Chair Responsibilities As a partner to the chief executive officer (CEO) and other board members, the Board Chair will provide leadership to Kindah.
CAREER PATHWAYS THE NEW WAY OF DOING BUSINESS. Agenda for our Discussion Today we’ll discuss: Career Pathways Systems and Programs Where we’ve been and.
A Framework for Evaluating Coalitions Engaged in Collaboration ADRC National Meeting October 2, 2008 Glenn M. Landers.
Florita Montgomery West Virginia University Extension Allison Nichols West Virginia University Extension Teresa McCoy University of Maryland Extension.
[Presentation location] [Presentation date] (Confirm ABT logo) Building Bridges and Bonds (B3): An introduction.
Leading Your District To Be All That It Can Be David Williams, Deputy Director Div. of Soil & Water Conservation 2016 Spring Area Meetings.
Info-Tech Research Group1 1 Info-Tech Research Group, Inc. is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
Optimize the HR Department to Support the Organizational People Strategy Enhance your HR departmental structure, process, technology, and capability to.
SAMPLE Drive Engagement Through Interdepartmental Collaboration
Auditing Sustainable Development Goals
Empower Managers to Take Ownership of Employee Engagement
FCYO LEARNING AND EXCHANGE FUND
SAMPLE Glimpse Into the Future Using Predictive HR Analytics
SAMPLE Develop a Comprehensive Competency Framework
BRAVO: Barrier Removal Assessment and Viability Overview
Employee engagement Delivery guide
Presentation transcript:

A tool for assessing the feasibility and impact potential of Rare project plans BRAVO: Barrier Removal Assessment and Viability Overview ONON RIVER BASIN (Farming) Economics TechnicalCultural/Political Impact & Metrics

BRAVO: Executive Summary What: To eliminate the principal threat posed to the endangered Taimen fish, local fisher people and recreational visitors must stop illegal fishing in the Onon River. One of the objective of the Barrier Removal Strategies is farming activities in the Onon River Basin. In the some part of the Northern and Central Mongolia, the WWF Mongolia is implementing alternative livelihood project as bird watching tour and handicraft making in terms of Eco-tourism. Who: WWF Mongolia will implement “Poverty Reduction through Community-Based Natural Resource Management in the Onon River Basin” project funded by Asian Development Bank (ADB). When: The “Poverty Reduction through Community Based Natural Resource Management in the Onon River Basin” project is going to start on third quarter of One of the main component of this project is implement and support alternative livelihood projects within the Onon River Basin unemployed and herders. How: The ADB funded “Poverty Reduction through Community Based Natural Resource Management in the Onon River Basin” project will provide funding to increase alternative livelihood projects within the Onon River Basin people (estimated USD during four years) and outreach campaign (with support from Rare) needed to change behaviors. BRAVO Scores Feasibility Score: 3.6 Impact Score: 3.7

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 3 Criteria ExplanationScore Costs Preliminary projected costs Site preparation Phase –Establish herders’ groups –Training farming activities –Farming management training –Community Based Natural Resource Management Implementation Phase –Collaborative management WWF, Onon- Balj National Park and Local People. –Training, workshop and practicing –Starting small farming activities. (Milk, vegetable, fruit, chicken farm etc.) Monitoring Phase –Transportation –Farmers Project Oversight Equipment/Provisions Estimated total cost $40,000 (more or less) Predictability of cost burden 1 = Costs are ambiguous and unpredictable; 4 = Costs are predictable and manageable 4 Average Score 4 Onon River Basin BRAVO Detail Economics (1 of 3)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 4 CriteriaExplanation Score Revenues Description of revenue streams Fundraising total: $ 40,000 Sources: WWF Mongolia, ADB Earned income total: $ Sources: Percentage of total cost available 1: 0 – 25% 2: 25 – 50% 3: 50 – 75% 4: 75 – 100% The WWF Mongolia (ADB) has committed to covering Onon River Basin poverty reduction program conditional upon permitting; funding is immediately available. 4 Likelihood of fundraising success 1 = Very low likelihood of raising the necessary funds; 4 = Likelihood of raising necessary funds almost a certainty Funding is committed, though WWF Mongolia is conditional upon permitting approval by the ADB and Mongolian Government. 4 Fundraising timing Funding should be available relatively quickly as evidenced by philanthropic and government promises Funding Alignment 1 = Funding timeline is not aligned with project timeline; 4 = Funding timeline is well-aligned with project timeline Funding is well-aligned with the project timeline; resources will be secured quickly, while the project will last several years. 4 Sustainable Funding 1 = Unsustainable funding source; 4 = Very sustainable funding source “Sustainability” hinges on periodic livelihood monitoring on Onon River and monitoring compliance by fisher people, unemployed and herders their implementing of small farms. Funding is very likely to be sustainable, though four years project. 3 Average Score 3.8 Onon River Basin BRAVO Detail Economics (2 of 3)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 5 CriteriaExplanation Score IncomeSubstitution (ifapplicable) New income source relative to old income 1 = Income source is reduced by 20% or more; 4 = Income source is increased by 20% or more (Use 1-4 scale) Income substitution is a key barrier. New income source (farming) is not very exceed than traditional income source at the beginning. 3 New income source sustainability 1 = New income source is unsustainable; 4 = Income source is highly sustainable (Use 1-4 scale) We have a opportunity how the alternative income will sustainable. This is WWF Mongolia have to try constantly promote this options and have to encourage unemployed and fisher people constantly 3 Average Score 3 Onon River Basin BRAVO Detail Economics (3 of 3)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 6 Criteria Explanation Score Technology Attainability & Availability 1 = Technology and/or required assistance needed is unavailable; 4 = Technology is attainable and third-party assistance, if required, is available Dairy processing, vegetable, fruit, chicken, pig, and bee farming trainers. There are many NGO’s and other professional organizations in terms of farming training. 4 Technology assistance 1 = Technology assistance is required, yet not available; 4 = Technology assistance is significant and available Substantial technical assistance will be provided by the WWF Mongolia in order to ensure effective training, workshop and farming practicing. There are many NGO’s and other professional organizations in terms of farming training. 3 Appropriate for circumstances 1 = Available technology is not appropriate for circumstances; 4 = Acquirable technology is suited for circumstances Some eco-tourism activities have been successfully implemented in the some parts of Mongolia (South Gobi, Hovsgol and Western Mongolia). Also there are big expectations about to learn and adopt farming activities within Onon people. WWF Mongolia Team with other experts will train and practice farming with Onon people (especially fisher people) 4 Average Score 3,6 Onon River Basin BRAVO Detail Technical (1 of 2)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 7 Criteria Explanation Score Capacity / Organizational Ability Barrier Removal Partner support 1 = BR Partner does not exist or is not willing to support the project; 4 = There exists a willing Barrier Removal Partner (Use 1-4 scale) The Barrier Removal partners, WWF Mongolia “Poverty Reduction through Community-Based Natural Resource Management” project, Soum officials are very supportive to the project, Onon-Balj National Park (OBNP) is also BR partner. There are conservation plan including alternative livelihoods in all Soum governments. 4 Barrier Removal Partner’s ability to drive change 1 = BR Partner lacks a track record of driving behavior; 4 = BR partner has a proven track record of driving behavior (Use 1-4 scale) MRO, OBNP and Soum Governments have a proven track record of success. They have their own work plan and some budget sources 3 Budget planning and cost efficient execution 1 = BR Partner has not demonstrated sufficient budget planning skills and cost efficient execution of plans; 4 = BR Partner has proven proficiency in budget planning and cost efficient execution of past plans (Use 1-4 scale) WWF Mongolia “Poverty Reduction through Community-Based Natural Resource Management” project has approved fund. 4 Average Score 3,6 Other Partners Other critical partners 1 = Other partners do not exist or will not be impactful 4 = Other partners are available and capable of assistance (Use 1-4 scale) Local Poverty Reduction project, 3 Average Score 3 Onon River Basin BRAVO Detail Technical (2 of 2)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 8 Criteria ExplanationScore Community Leadership Leaders and influencers in the community 1 = Dearth of strong leaders and influencers in the community; 4 = Visible leaders with clout to drive behavior The official herders group including unemployed and local fishermen only can get LMA. These official groups can get firstly any helps according to WWF project implementation. Each group has official group leader. Focused conversations conducted by Pride Campaign Manager have shown that group leaders are particularly influential, and should be targeted by the PRIDE campaign for collaboration and information-sharing. Recreational visitors of the river, however, lack streamlined leadership. Because they don’t have closely relationship with local official groups. They have some relationship with some local fishermen as guiding. They have more diffuse sources of information- gathering, such as the radio and other traditional media outlets. It may be more difficult to reach them employing a top-down approach. 4 Leadership willingness to endorse 1 = Unwilling to get on board with project; 4 = Firm commitment from leadership to help drive change efforts Leadership willingness is not very ready. But, official group members come together and elect their group leader. Also, many other conservationists including WWF field staff, Soum Social workers, and National park people work concentrate on the leadership willingness. 3 Average Score 3,5 Onon River Basin BRAVO Detail Cultural/Political (1 of 2)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 9 Criteria Explanation Score Political Environment Current legislative and legal landscape 1 = Legislative and legal restrictions will hamper efforts; 4 = Legislative and legal framework will aid program (Use 1-4 scale) The current legislative and legal landscape is not very negative to the campaign. There is MoU between WWF Mongolia and Ministry of Nature Environment and Tourism (MNET). There is no any other interests (mining license, irrigation system etc.) through the Onon River. 4 Ability to drive legislative change 1 = Lack of knowledge regarding political environment and unclear timeframe for advocacy; 4 = Depth of political knowledge and ability to push for appropriate changes within a given timeframe (Use 1-4 scale) Here in Mongolia Local and Parliament elections run every four year. MNET is very supportive to WWF Mongolia. 4 Average Score 4 Values and Norms Assessment of norms 1 = Plan is unconcerned with political and cultural norms 4 = Plan assesses and takes into account the values and norms governing the political and cultural environment (Use 1-4 scale) Pride Campaign manager will conduct extensive qualitative survey next week to better assess cultural and political norms present on Onon River Basin. These findings will inform the plan’s execution, ensuring that all actions taken are appropriate in the sociopolitical context. 4 Ability to address normative obstacles 1 = Normative obstacles are too formidable to be overcome; 4 = Obstacles are manageable and a clear tack to address them is employed (Use 1-4 scale) Not applicable NA Average Score 4 Onon River Basin BRAVO Detail Cultural/Political (2 of 2)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 10 Criteria Explanation Score Conservation Impact Likelihood of conservation impact 1 = Conservation impact is unlikely to be achieved; 4 = Conservation impact is very likely to be realized The target of increasing the Taimen population 20% within the timeframe is possible once local taimen fishing have been removed. There is also big threat for taimen from recreational visitors. There are many threats to the taimen population including: warming, water decreasing etc. Each of these minor threats could theoretically undermine the conservation impact of the plan. 3 Impact sustainability 1 = The conservation impact goal is unlikely to be sustained in the long-term; 4 = The impact goal should be viable in the long-term Expert from the Taimen Conservation Fund conducts Taimen assessment on the Onon River with most 25 local fishermen funded by WWF US and WWF Mongolia. MRO also participated in this assessment with their international anglers and international guides. 4 Average Score 3.5 Onon River Basin BRAVO Detail Impact and Metrics (1 of 2)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 11 Criteria Explanation Score Tipping Points 1 st Tipping Point 1 = Tipping point unlikely to be achieved; 4 = Tipping point likely to be reached The first tipping point consists of the Ministry of Nature Environment and Tourism and ADB approving the “Poverty Reduction through Community-Based Natural Resource Management” project. Once this barrier is overcome, the alternative livelihood option program can begin. 4 2 nd Tipping Point 1 = Tipping point unlikely to be achieved; 4 = Tipping point likely to be reached The second tipping point is the alternative livelihood options as farming including local fishermen, unemployed and herders. 4 3 rd Tipping Point 1 = Tipping point unlikely to be achieved; 4 = Tipping point likely to be reached The third tipping point is in each soum has a policy and many activities “Rural Poverty Reduction” 3 Average Score 3.6 Metrics Measurable outcomes 1 = The program lacks clear metrics or are difficult to measure; 4 = The program has established clear, measureable metrics Conservation impact of the campaign is easily measurable. The size of the Taimen population is the metric, while the methodology will consist of a Taimen assessment based most 25 local fishermen observation. The expert from Taimen Conservation Fund has pledged assistance in monitor taimen populations bi-annually. 4 Average Score 4 Serena BRAVO Detail Impact and Metrics (2 of 2)

Confidential Copyright © 2008 Monitor Company Group, L.P. — Confidential — XXXCAS-COD-Prez-Date-CTL 12 CategorySubcategoryScore Average Category Score Feasibility Economics Costs Revenues 3.8 Income Substitution 3 Technical Technology Capacity / Organizational Ability 3.6 Other Partners 3 Cultural / Political Community Leadership Political Environment 4 Cultural Norms 4 Feasibility Score 3.6 Impact Impact and Metrics Conservation Impact Tipping Points 3.6 Metrics 4 Impact Score 3.7 Barrier Removal Assessment and Viability Overview (BRAVO) Composite Score Enter average scores in the right hand column. Then take the feasibility score and enter it into Miradi and the Impact score and enter it into Miradi. Where either score is below X for either feasibly or impact, consider the strategy to be inappropriate and assess the need to conduct a second BRAVO that reviews a different strategy.