Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.

Slides:



Advertisements
Similar presentations
Intracompany Stock Transfer Scenario Overview
Advertisements

Master Data for SCM (1) Master Data for Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Process Management and Control and Physical Inventory SAP Implementation
Inventory and Warehouse Management Process
Introduction to SAP R/3.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012 Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012.
Production Planning Processes Theories & Concepts
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Introduction to Enterprise Systems
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013 Integrated Distribution & Production.
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Production Planning Processes EGN 5620 Enterprise Systems Configuration (Professional MSEM) Fall, 2012.
Deployment & Available-to-promise (ATP) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Production Planning Processes EGN 5620 Enterprise Systems Configuration Spring, 2014.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Sinha and Kotzab: Supply Chain Management, Copyright © 2012 by Tata McGraw-Hill Education CHAPTER 8 Production Planning and Scheduling.
1 Copyright © 2004, Manugistics, Inc. All rights reserved. Objectives At the end of this section you will be able to:  Understand the key pains and challenges.
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization Fall, 2012.
Transportation Planning EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013.
Operate a Logistics Company EGN 5621 Enterprise Systems Collaboration (Professional MSEM ) Fall, 2012.
Enterprise Assets Management EGN 5622 Enterprise Systems Integration Fall, 2015.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Integrated Distribution &
Concepts in Enterprise Resource Planning Third Edition Chapter Four Production and Supply Chain Management Information Systems.
Transportation Planning EGN 5623 Enterprise Systems Optimization Fall, 2013.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Chapter 2 Introduction to Enterprise Systems Partial adoption from Magal and Word | Integrated Business Processes with ERP Systems | © 2011 Timothy L.
Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012 Systems Integration EGN 5623 Enterprise Systems Optimization.
Assets Management Concepts & Theories
Integrated Distribution & Production Planning (DP/PP) EIN 5346 Logistics Engineering Fall, 2015 Integrated Distribution & Production Planning (DP/PP) EIN.
Systems Integration EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011 Systems Integration EGN 5623 Enterprise Systems Optimization.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Transportation Planning EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Systems Integration EGN 5623 Enterprise Systems Optimization Fall, 2013 Systems Integration EGN 5623 Enterprise Systems Optimization Fall, 2013.
Purchase Order Creation Manually or automatically With or without reference to other documents Data Documents: Purchase requisition, Purchase order, RFQ,
Rough-Cut Capacity Planning in SCM Theories & Concepts
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA USA :
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
 TATA CONSULTANCY SERVICES MM - Inventory management.
Chapter 22 Procurement Cycle and Documents
Make-to-Stock Scenario Overview
ERP & APO Integration Theories & Concepts
Rough-Cut Capacity Planning in SCM Theories & Concepts
Intracompany Stock Transfer Scenario Overview
Rough-Cut Capacity Planning in SCM EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Make-to-Stock Scenario Overview
Intracompany Stock Transfer Scenario Overview
ERP & APO Integration Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Sales Order Process.
Deployment & Available-to-promise (ATP) in SCM Theories & Concepts
Intracompany Stock Transfer Scenario Overview
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning Theories & Concepts EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Enterprise Systems Optimization Spring, 2012
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2012.
Integrated Distribution & Production Planning (DP/PP) EGN 5623 Enterprise Systems Optimization (Professional MSEM) Fall, 2011.
Transportation Planning EGN Enterprise Systems Optimization Fall, 2012
Production Planning and Detailed Scheduling (PP/DS) in SCM EGN 5623 Enterprise Systems Optimization Fall, 2012.
SCM Master Data - 2 Master Data for Distribution & Production Processes EGN 5346 Logistics Engineering Fall, 2015.
Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering Fall, 2015.
Presentation transcript:

Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes EGN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013

Master Data for SCM (1) Theories & Concepts Master Data for SCM (1) Theories & Concepts

Master Data for SCM (1) Master Data in Demand Planning Master Data for SCM (1) Master Data in Demand Planning

Master Data Overview Like in ERP, master data plays an important role in APO and control many processes. Some master data objects in APO have analogies in ERP like product (Material in ERP), and most of these are transferred from ERP. Others have to be maintained in APO. Most organisational entities from ERP are not needed for APO, which is only concerned with logistics and not accounting and costing; so organizational entities such as company codes, or cost centers have no significance in APO.

Master Data Overview Most master data such as materials are transferred from the ERP to APO. Locations is the main organisational entity in APO. In addition, different planners are created for each location and each of the following modules (DP, SNP, PP/DS, and TP/VS). The planners are assigned to the material master (i.e., product in APO); thus they are not transferred from ERP.

Master Data Objects in SAP APO and SAP ERP (review)

Location Types in SAP APO APO uses only one object for a location; it may have different location types. For example, 1001 – production plant, 1002 – distribution center. APO uses only the location name as the key, not the location type. Additional location information such as calendars, storage and handling resources and planning relevant categories (i.e., stock categories for SNP and receipt and issues for deployment) are defined in APO. Make sure no code crashes due to plants, suppliers or customers with the same names.

Location Types in SAP APO

DP Function in SCM (review) THEORY AND PRACTICE OF ADVANCED PLANNER AND OPTIMIZER IN SUPPLY CHAIN DOMAIN by Sam Bansal

Time Horizons for DP and Sales in SCM (review)

Level of Detail and Time Horizon of DP in APO Modules (review)

DP and Sales Processes in APO Modules (review)

DP Module in APO System Structure and Integration with ERP (review)

Overview Master Data and Application in DP and Sales (review) Master Data for Demand Planning: CVC, Product, Interchangeability group. Note: CVC can be generated from historical data that is transferred from ERP. If no historical data is available, e.g. for new products, CVC can be maintained in APO as well. Master data for Sales: Location, Product, Rules, and Interchangeability group.

Overview Master Data and Application in DP and Sales

Process for Demand Planning

Demand Planning Process The result of the demand planning process is the establishment of independent requirements which will trigger the planning activities of distribution, production and procurement planning. The sales forecast is consolidated and checked regarding plausibility, probably checked against a statistical forecast and corrected according to the experience of the planner before releasing it for the subsequent planning steps. The monitoring of the forecast accuracy and a feasibility check against the planning constraints (e.g. capacity) are further common process steps

Planning Levels and Consistent Planning The most primitive questions in DP are: on which levels (product, product group, …) to plan? in which granularity of time (weeks, months) to plan? which data is required? In APO, planning levels are represented by characteristics (CVC), the granularity of timer corresponds to the time (i.e., time bucket), and the data (linked to “key figures” such as revenue and sold quantity). Both characteristics and key figures are technically represented by “info objects”.

Data Structure for Demand Planning

Planning Levels and Consistent Planning Planning shall take place on the levels of sales organization, location, product and product group. Each product belongs to only one product group Key figures are sales forecast and demand plan.

Planning on Aggregated Level

Automatic Disaggregation

Demand Planning Structure Overview

The display of the data and the planning is performed in Planning book. A planning book is always linked to a planning area which contains the key figures. For the defined characteristic value combinations (CVC) time series are created for each key figure of the planning area. The time series contain the actual data, so that the planning book serves to display the time series of the planning area. The planning area itself is connected to a basic planning object structure, where the relevant characteristics are defined. Historical data is stored in an info cube (which contains both characteristics and key figures).

Planning Object Structure and Planning Area /SAPAPO/MSDP_ADMIN

It is recommended that not to change planning object structure and planning area after initialization.

Time Buckets In DP there are two kinds of time bucket profiles: the storage bucket profile and the planning bucket profile. The data of planning area is always stored in the storage bucket profile, while the planning bucket profile is used to display the data in the planning book. In the planning bucket profile only those period types (month, week, …) can be used that are also defined in the storage bucket profile. If the time buckets do not match as with months and weeks, the periods are divided as shown below, in Figure 4.7.

Data Storage Bucket Profiles

Active Characteristic Value Combinations (CVC)

Entities for Life Cycle Modelling

Settings for Life Cycle Planning Example

Promotion

CVC for the Use of DP-BOMs

Release of the Demand Plan

Process for Forecast after Constraints

Structure of the Transfer to SAP ERP

Master Data for SCM (1) Master Data in Sales Process Master Data for SCM (1) Master Data in Sales Process

Process for Order Fulfillment

Order Fulfillment Overview Order fulfillment contains the processes related to the customer from order taking, availability check and confirmation to the shipment to the customer. The sales order entry is performed in ERP either manually or via EDI, but ATP check is carried out in APO during the sales order entry. The transportation planning is performed in APO based on the deliveries and sends shipments back to ERP. There is an alternative way to perform transaction planning first based on sales orders and trigger the delivery creation from APO, but this has disadvantages in the flexibility if ATO check turns out to be unsuccessful.

Order Life Cycle

Tasks during Sales Order Entry

Business Events

Default Assignment of Strategy to Requirement Class

Location Substitution with /Without Stock Requisition

Transaction for Condition Technique

Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes SAP Implementation Master Data for SCM (1) Master Data in Demand Planning & Fulfillment Processes SAP Implementation

Master Data, Model, and Version

SAP ERP Transactions for Independent Demand Configuration

Strategy Overview

Requirement Type

Requirement Class

Version

Exercises: (Due date 11/23/2013) 1. SCM resource setting 2. Change work centers 3. Create purchasing information records 4. Display info records by vendor 5. Create demand in SAP ERP - Change planning strategy - Create demand for the finished products