New test structures: Status report and technical documentation review

Slides:



Advertisements
Similar presentations
Welcome to the Montreal MIS Tutorial. MIS Tutorial What is an MIS What is the MIS role in JDF Introduction Gray Boxes MIS Requirements – Job Costing.
Advertisements

2 SS 14SS 14 CONTENTS Introduction Product Data management CATIA team PDM CATIA Integration SmarTeam File Management Customization Tools Advantages and.
Chapter 7 Enterprise-Wide Information Systems
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
University of Southern California Enterprise Wide Information Systems Manufacturing Planning and Execution Instructor: Richard W. Vawter.
An overview of the CERN CMMS
PLM windchill By- Bhanu Prakash Vemula Matrikel no
ERP Enterprise Resource Planning. What is ERP? Software programs that help to manage company-wide business processes, using a common database and shared.
Managing the whole lifecycle of physical assets. Enterprise Asset Management is liable for monitoring, maintenance, configuration management, reparation,
HLTC 15 th April 2014 EDMS: Y. Muttoni EN-MEF-INT with the contribution of P. Fessia.
SALES ORDER MANAGEMENT SYSTEM. According to the current global status, companies can't waste time sourcing suppliers or waiting for information on the.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
EDMS Conclusions from the Benoit Riffaud Per-Olof Friman David Widegren.
Chapter Seven Process Modeling, Process Improvement, and ERP Implementation.
T1-2: Enterprise Systems Engineering Chin-Sheng Chen Florida International University.
By A + B Solutions and LC Consulting Services ®. How to Integrate Production in to T EAMCENTER by LC Consulting Services 8 Denison Parkway East Corning,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
TcCPG Jargon EDS PLM Solutions Asia Pacific Technical Training EDS PLM Solutions Asia Pacific Technical Training.
Implementing Baan PDM BWU – Orlando, FL October 17, 2001 Session 6 Chris Jamison RedKlay Web Solutions, Inc. PDM = Product Data Management.
Barriere O, Le Roux P
ERP IMPLEMENTATION LIFE CYCLE KASHIF SHAMIM. Enterprise resource planning ERP covers the technique and concepts employed for the integrated management.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Project management tools Tiia Uusimäki. Agenda Activity Planning Tool and Earned Value Management – Why are the tools needed? – Activity Planning tool.
Dmitry Gudkov BE/RF/PM CLIC Module Working Group PROTOTYPE TWO-BEAM MODULES (CLEX) Supporting and positioning system for CLEX modules main conclusions.
1© DATOS Computer AG – The Framework for higher Efficiency Tool Catalogs Documents + Planning Assembly + Logistics Storage Systems Job.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
Project Portfolio Management MaestroTec, Inc. Project Portfolio Management Providing the tools and resources necessary to effectively.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
Margarita Saifoulina BE/RF/SR. Outline Data Management EDMS & MTF for RF structures Future prospects for EDMS/MTF solution Data Management EDMS & MTF.
Under-Utilization of PLM Tools Gambling with your Product Data Lisa Fenwick TPT Technologies, Inc. dba CMstat.
Enterprise Solutions Chapter 10 – Enterprise Content Management.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Chapter 7 Enterprise Resource Planning (ERP). Objectives After studying the chapter, students should be able to.. Explain definition of Enterprise Resource.
MTF - Travellers 28/2/2001 S. Mallon + P. Martel EDMS Doc Id Contents Problem and scope Timing of MTF usage Definition of a standard MTF Creation.
CLIC Cost at 3 TeV and 500 GeV CDC meeting, Hans-H. Braun for CLIC cost & Schedule WG Mick Draper, Katy Foraz, Claude Hauviller, Bernard Jeanneret,John.
Update of master schedule and report from SLAC G. Riddone
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
WERCS REACH Initiatives Geoff Brooks Chief Software Architect The WERCS,Ltd.
Pragati Automation Company: –Pragati is a well known manufacturer of machine tool accessories particularly for CNC Machines Associate Companies –ACE DESIGNERS.
Copyright © 2007, Oracle. All rights reserved. Product Lifecycle Management Overview.
TBTS Test Program & Schedule G. Riddone
Equipment Management Folder / MTF Travellers. Product Data Management A huge amount of product and engineering data stored in CERN databases – Design.
Latest news from GUCS ( Groupe Utilisateurs Catia-SmarTeam ) T.Klioutchnikova10th Catia Users Forum 22/03/2012.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
Storage Areas 865, 879, 954 and 955 G. Schneider J. Simon N. Sharmazanashvili G. Schneider BE-BI BI Beamline Operational Spares Strategy 2 (BOSS.
Project Tools TestTrackPro. Made by a small company, SeaPine Software Have used the Issues Management modules for many years to manage changes and bug.
CLIC activity of S. Iija Feb 20121S. Iija, BE-RF-PM EDMS MTF Administrative work.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Quicx developed by Chinook Systems Inc. David Wampler, Software Manager Wanda Lenkewich, Owner 2014 buidlingSMART Challenge107-Jan-14.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
CLIC activity of W. Zhou Feb 20121W. Zhou, BE-RF-PM Procurement Quality assurance.
CLIC Activities of M. Filippova Feb 20121M. Filippova, BE-RF-PM EDMS Quality assurance Component procurement.
Sap mm online training Online | classroom| Corporate Training | certifications | placements| support CONTACT US: MAGNIFIC TRAINING INDIA
SUDEEP Technologies is one of the leading Training Company involved in providing SAP MM ONLINE TRAINING. Our Trainers are.
The New Generation of CAD Tools
Leverandørportal M3 User Group Denmark 2012
INTRO TO SAP EWM.
Reliability Analysis & Infor EAM
The MTF adjusted system to meet Vacuum Group needs
Renovation of the Accelerators Controls Infrastructure and its Assets Management Asset and Maintenance Management Workshop November 14th, 2013 Cl.Dehavay.
Common Learning Blocks
Rf structure development meeting TBTS component status and use/test at KEK and SLAC G. Riddone, I. Syratchev
PLM(Product Lifecycle Management) in
E. Manola-Poggioli 05 December 2001 EDMS doc
MBSE for PLM: Part of the Digital Systems Life Cycle
Presentation transcript:

New test structures: Status report and technical documentation review Case structures : 11WNSDVG1.KS N2 (T18) PETS 11.4 GHz with damping material Extra: BAAN, ERP-package for inventory management Margarita Saifoulina & Maria Filippova BE/RF Input from: Andrey Olyunin Germana Riddone Serge Lebet

CATIA/Smarteam & EDMS/MTF

CERN EDMS PLM = Product Lifecycle Management = EDMS/MTF at CERN Design Manufacturing Installation Commissioning Maintenance Dismantling CERN EDMS

Import process MTF Axalant Design data Drawings & Documents InforEAM PLM management Manufacturing workflow EDMS Web

Introduction to the EDMS/MTF Design side(EDMS)= Items Structure of project Drawings 2D models Parameters Documentation (test/report) Physical manufacturing side(MTF) = Equipment Structure of assembly Made of Equipment data Manufacturing Workflow steps Quality control Documents(links to EDMS) Component’s traceability of whole product lifecycle Project data management Product life cycle management

Manufacturing Workflow in MTF Describes the manufacturing process Easy to identify data when it appears along with the equipment being manufactured

How to access MTF? 1. Method

2. Method

11WNSDVG1.KS N2 (T18) Now it’s ready for shipment

PETS 11.4 GHz with damping material material Now it’s ready for final bake-out

Notification letter for MTF Proposal of letter content: Please find new attached report document in MTF, under the structure '11WNSDVG1.8 VB S- CLAAS110277-CR000002'. https://edms.cern.ch/asbuilt/plsql/mtf_equip.eqp_work_top?cooki =9270257&p_rec_id=CLAAS110277-CR000002&p_rec_type EDMS id. of document 1065640 (ver.1) RF design and parameters of 11.424 GHz T24_vg1.8_disk. ( or 11WNSDvg1.8; or CLIC_G undamped) created by Alexej GRUDIEV https://edms.cern.ch/document/1065640/1

Notification letter for MTF Notification letter should be sent when document is attached to MTF Notification system updates every hour Who should receive notification letter? - CLIC RF production: IS, WW, AG, JPD, SL, MF, MS, MT, MM, JShi, AS, G. Arnau, Ph. De Souza

Enterprise Resource Planning – BAAN (Company name) PLM/ERP for BE/RF CAD tools - CATIA PDM - EDMS PLM - MTF ERP - BAAN Enterprise Resource Planning – BAAN (Company name)

BAAN – Inventory Management ERP- package used by CERN since 1995 It’s integrated to other applications such as EDH and Qualiac, which is another ERP package for purchasing and logistics export/import documentation Component’s traceability of whole product lifecycle in different levels of intra- and inter- organizational integration in one place

BAAN – Inventory Management User-friendly interface  Training courses not compulsory Not yet web-based If needed AIS-support can create new functions of database for our personal needs Technical Specification in progress BAAN- package presentation available https://espace.cern.ch/gs-dep-ais-fpf/ExternalProject/rf/default.aspx

BAAN – Example of standard layout

BAAN – Functions’ Screens

BAAN – Stock Management

Conclusion PLM/ERP eliminates:  The lack of information  Waste of time Inefficiency of component’s whole lifecycle, not only in manufacturing If used properly PLM/ERP increase productivity Future actions:  Inventory management is needed  Standard information in reports for data management: what was done, who did, when, where