CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

UMATILLA HATCHERY MONITORING AND EVALUATION PROJECT Richard Carmichael, Wes Stonecypher, Gerold Grant, and Will Cameron Project # Oregon Department.
Salmonid Natural Production Monitoring & Evaluation Project Confederated Tribes of the Umatilla Indian Reservation BPA Project #
Investigate the Life History of Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Basin Project Brian Jonasson Oregon Department.
Walla Walla Basin Fish Habitat Enhancement Project CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION.
UMATILLA HATCHERY AND SATELLITE FACILITIES OPERATION AND MAINTENANCE
Nez Perce Tribal Conservation Enforcement Presentation by Chief Adam Villavicencio for the System-wide Provincial Review July 18, Copyright.
Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
Colville Confederated Tribes and the Okanagan Nation Fisheries Commission.
Phase I Okanogan River Spring Chinook Production Proposal #29050 Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
Survival Estimates for the Passage of Juvenile Salmonids Through Dams and Reservoirs of the Lower Snake and Columbia Rivers (Project ) CBFWA March.
Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
Confederated Tribes of the Umatilla Indian Reservation Umatilla River Basin Anadromous Fish Habitat Enhancement Project Project No Presented.
Investigate Re-establishing Anadromous Fish Populations Above Man-made Barriers Oregon Department of Fish and Wildlife Willamette Basin.
Out Year Operations and Maintenance Costs Required to Implement/Carry out MVID Rehabilitation Project.
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River Project No Tara White, Shannon Jewett, Josh Hanson,
Washington Department
UMATILLA RIVER FISH PASSAGE OPERATIONS
Westland-Ramos Fish Passage and Habitat Restoration Project BPA Project No September 23, 2004 Westland Irrigation District.
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
8/30/20061 Data Needs for the CBFWA Status of the Resource Project August 30, 2006.
Monitoring and Evaluation of Yearling Fall Chinook Salmon Released Upstream of Lower Granite Dam Nez Perce Tribe Department of Fisheries Resources Management.
Fishery Management Overview - Context Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
U.S. Department of Energy Pacific Northwest National Laboratory Evaluation of Juvenile Salmonid Culvert Passage SM Anglea, GD Williams, KD Ham, and GA.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION
LOWER SALMON RIVER Tributary Protection and Enhancement.
Assessment of Bull Trout Populations in the Yakima River Watershed.
Gravel Push-up Dam Removal, Lower North Fork John Day BPA Project A Cooperative Project of: The North Fork John Day Watershed Council & The.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
Nez Perce Tribal Hatchery (NPTH) DEPARTMENT OF FISHERIES RESOURCE MANAGEMENT 1 - CENTRAL INCUBATION FACILITY FOR SPRING AND FALL CHINOOK 3 - FALL CHINOOK.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
Future of Our Salmon Conference Portland, OR Oct 17, 2012 Why Artificial Propagation? Why Artificial Propagation? Gary James, Confederated Tribes of the.
Restoring Life History Diversity to Bonneville Cutthroat Trout and Bluehead Sucker in the Weber River Paul Burnett – Trout Unlimited Ben Nadolski – Utah.
Biological considerations at fish passage projects in the Missoula area Pat Saffel FWP Fish Manager Missoula.
Dams in the Pacific Northwest Impacts on Anadromous Fish.
Overview of Current Production Programs Across the Columbia River Basin.
NWHA- Panel Discussion “Spawning Better Ideas for Fish Passage”
Oregon’s Unique Approach Oregon’s Unique Approach to Watershed Restoration.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Documenting O. mykiss life histories in the White Salmon River prior to the reintroduction of anadromous fish above Condit Dam. Brady Allen and Patrick.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Evaluation of Fish Passage Improvement Projects in the South Coast and Rogue River Basins Duck Creek Associates Dylan Castle.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
Washington’s Lower Snake River Compensation Plan Steelhead Program – A retrospective and program adaptive management overview Mark Schuck and Joe Bumgarner.
Relationships between resident and anadromous O. mykiss in Cedar River, WA: Anne Marshall WA Dept of Fish and Wildlife improving the chances for steelhead.
Chinook Salmon, the Fish Screen, and a Vanishing River. Paddy Murphy Idaho Department of Fish and Game Anadromous Screen Program Salmon, Idaho.
Joe Bumgarner Washington Department of Fish and Wildlife.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
Reconnecting Fluvial Westslope in Skalkaho Creek Is this working and how do we tell?
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
Welcome To Central Washington University and the Yakima Basin Science and Management Conference Overview of Fishery Activities Dave Fast, Yakama Nation.
Touchet Consolidation Washington Department of Fish and Wildlife.
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
Biological Opinions and ESA Consultations Ritchie Graves NMFS-NWR Hydropower Division Portland, Oregon February 19, 2013.
An Overview of the Flathead Subbasin Planning Process
A Review of Stream Restoration Techniques and a Hierarchical Strategy for Prioritizing Restoration in Pacific Northwest Watersheds North American Journal.
Thorp Mill Ditch Assessment ( )
Stream Connectivity in the Clark Fork Watershed
Upper Deschutes River Basin Steelhead Reintroduction
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements BPA Project #

Part of Comprehensive Walla Walla Fisheries Restoration Program Fish Passage Improvements Fish Passage Improvements Instream Flow Enhancement Instream Flow Enhancement Watershed Protection and Restoration Watershed Protection and Restoration Stream Habitat Enhancement Stream Habitat Enhancement Artificial Propagation – Salmon Reintroduction Artificial Propagation – Salmon Reintroduction Monitoring and Evaluation Monitoring and Evaluation

Walla Walla Subbasin Summary and Draft Subbasin Plan Limiting Factors Physical Fish Passage Impediments: Adult impacts at diversion structures Juvenile impacts at irrigation canal screens Fish Species Impacted: Summer Steelhead (ESA) Bull Trout (ESA) Spring Chinook Physical Fish Passage Impediments: Adult impacts at diversion structures Juvenile impacts at irrigation canal screens Fish Species Impacted: Summer Steelhead (ESA) Bull Trout (ESA) Spring Chinook

Walla Walla Subbasin Summary Goals Goals Enhance steelhead & bulltrout (BT) Reestablish spring chinook (CHS) Provide sustainable fisheries Goals Enhance steelhead & bulltrout (BT) Reestablish spring chinook (CHS) Provide sustainable fisheries Objectives Return 5,650 adult steelhead Return 5,500 adult CHS Self-sustaining BT & Lamprey Objectives Return 5,650 adult steelhead Return 5,500 adult CHS Self-sustaining BT & Lamprey

Project Objective Provide passage at irrigation diversion structures for migrating juvenile and adult salmonids in the Walla Walla Basin Final planning and design Construction Passage facilities O&M Passage facilities M&E Provide passage at irrigation diversion structures for migrating juvenile and adult salmonids in the Walla Walla Basin Final planning and design Construction Passage facilities O&M Passage facilities M&E

Project Consistent With Subbasin Summary Strategies Restore and enhance fish passage for upstream and downstream migrants Continue inventory and prioritization Implement screening improvements Consolidate diversions where possible Implement adult passage improvements O&M of passage facilities M&E – respond with adjustments Restore and enhance fish passage for upstream and downstream migrants Continue inventory and prioritization Implement screening improvements Consolidate diversions where possible Implement adult passage improvements O&M of passage facilities M&E – respond with adjustments

Passage Project Locations WAITSBURG DAYTON Touchet R. Walla Walla R. Mill Creek South Fork North Fork Walla Walla R. WASHINGTON OREGON N. Fork Walla Walla S. Fork Walla Walla WALLA MILTON - FREEWATER Hofer Dam Burlingame Dam Nursery Bridge Dam Little Walla Walla River Projects Completed Projects Planned

Completed and Planned Projects Completed 2 dam removals 2 dam removals 4 adult ladders 4 adult ladders 5 juvenile screens 5 juvenile screens 1 smolt trap facility 1 smolt trap facility 2 ditch consolidationsCompleted 2 dam removals 2 dam removals 4 adult ladders 4 adult ladders 5 juvenile screens 5 juvenile screens 1 smolt trap facility 1 smolt trap facility 2 ditch consolidations Planned 2 adult ladders 4 juvenile screens other cost share projects Planned 2 adult ladders 4 juvenile screens other cost share projects

Project Accomplishments Project Accomplishments Dam Removals 1997 Marie Dorian Dam 1997 Marie Dorian Dam 1998 Maiden Dam 1998 Maiden Dam New Ladders at Diversion Dams 1998 Burlingame 2000 Little Walla Walla 2001 Nursery Bridge 2002 Garden City/Lowden New Ladders at Diversion Dams 1998 Burlingame 2000 Little Walla Walla 2001 Nursery Bridge 2002 Garden City/Lowden

Project Accomplishments Project Accomplishments New Screens at Diversion Canals 1999 Burlingame 2000 Little Walla Walla (with smolt trap) 2000 Smith-Nelson 2001 City of Walla Walla cost share 2002 Garden City/Lowden consolidation 2004 Milton Ditch (consolidation into Little Walla Walla diversion) New Screens at Diversion Canals 1999 Burlingame 2000 Little Walla Walla (with smolt trap) 2000 Smith-Nelson 2001 City of Walla Walla cost share 2002 Garden City/Lowden consolidation 2004 Milton Ditch (consolidation into Little Walla Walla diversion)

Project Accomplishments Marie Dorian Dam Fish Barrier Dam Removed Fish Passage Restored

Little Walla Walla Diversion and Screen Screen Walla River Little Walla Walla

Project Accomplishments LWW Diversion Gravel Burn Blocked Flow & Passage Rubber Dam With Passage Slot

Project Accomplishments Old LWW Diversion Screens - No Bypass New Fish Screens & Trap Facilities

Couse Creek Milton Ditch Push-Up Dam Levees Former Milton Diversion Problems

Milton Project Benefits Abandon fish-killing screens Abandon fish-killing screens Utilize state-of-art screens at LWW Diversion Utilize state-of-art screens at LWW Diversion Eliminate push-up dam in Walla Walla River Eliminate push-up dam in Walla Walla River Eliminate diversion of Couse Creek into ditch Eliminate diversion of Couse Creek into ditch Improve upstream passage in Walla Walla River and Couse Creek Improve upstream passage in Walla Walla River and Couse Creek Maintain additional 10 cfs in river for 2 miles Maintain additional 10 cfs in river for 2 miles Conserve 3-5 cfs to augment instream flows in critical reach below the LWW Diversion Conserve 3-5 cfs to augment instream flows in critical reach below the LWW Diversion

Remaining Problems Hofer Dam Adult Passage Problem Gose Street Adult Passage Problem

Additional Planned Projects 2005 design and construct Hofer ladder and screen 2005 design and construct Hofer ladder and screen 2005 Design Bergevin-Williams & Old Lowden screens 2005 Design Bergevin-Williams & Old Lowden screens 2006 Construct Bergevin-Williams & Old Lowden screens 2006 Construct Bergevin-Williams & Old Lowden screens 2007 Gose Street ladder (if not already funded) 2007 Gose Street ladder (if not already funded) 2007 Titus Creek Screen 2007 Titus Creek Screen Ongoing O&M of existing passage facilities Ongoing O&M of existing passage facilities