AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III.

Slides:



Advertisements
Similar presentations
Airport Planning and Design
Advertisements

Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director.
Project ADRIAIR – Pula Airport Forlì, 03 DEC 2012.
773d Logistics Readiness Squadron Deployment Flight (LGRX) Passenger Processing.
Terminal Design. Some thoughts from Mark Day (LEX)… Expansions are greatly limited based on the initial configuration. Similar comments to planning must.
We intend to clarify main problems to maintain and expand the existing airport…
Airport Systems Planning & Design / RdN AIRPORT PASSENGER BUILDINGS: EFFICIENCY THRU SHARED USE  Dr. Richard de Neufville  Professor of Engineering Systems.
Air travel. Complete the words or phrases using words below. off control free card baggage in lounge luggage reclaim locker Boarding
Denver Airport Baggage Handling System (DABHS)
© 2008 Cisco Systems, Inc. All rights reserved.Cisco ConfidentialPresentation_ID 1 “Cisco Unified Airport Operations” Your business, Our technology, OUR.
1 DOMODEDOVO International Airport No. 1 in RUSSIA.
Ballina Byron Gateway Airport Presentation November 2012.
ICRAT 2004 IMPACT OF FUTURE GENERATION AIRCRAFT IN AIRPORT OPERATIVITY
AMG 1204 Airport Management By Zuliana Ismail, 2010.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
1 Simplifying the Business  INTERNATIONAL AIR TRANSPORT ASSOCIATION 2010 IATA Passenger Experience Airport Forum Bucharest, 17 November, 2010.
Nov. 3, SMAAC’s Concerns SAFETY – MSP operations at peak hours are risky. MAC should compare the hub safety risks and costs to more balanced operations.
WHY DO WE NEED IMPROVED MOBILITY TECHNOLOGY? OBSERVATIONS FROM OUR TRIP Michael Boninger, Rachel Cowan & others.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
Travelling by plane. Munich Airport, parking zone.
Two airports - a unique opportunity for your advertising! Advertising at Varna airport
Kelowna International Airport 2010 Development Program September 17, 2007.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
TRB Session January 23, 2007 Transportation Research Board Session Lessons Learned from Large Airport Development “Orlando Airport Experience”
The Transformation Journey of Bahrain International Airport Mohamed Yousif Al Binfalah Chief Executive Officer Bahrain Airport Company.
Airport Navigator... Seamless Navigation through Airports... Check-In Singapur-Air Gate 58.
Airport Overview. History Key Dates 1  on April 1st, 1932, the Civil Airport of Cluj is established  in 1944, the airport is destroyed during the World.
Airport Systems Planning & Design / RdN Design of Components of Airport Passenger Buildings Dr. Richard de Neufville Professor of Engineering Systems and.
Stuck Flying Standby. Have you ever flown standby? What are some of the reasons that people would fly standby?
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
Components of AP Pax Bldgs Slide 1 of 27 / RdN © Design of Components of Airport Passenger Buildings Richard de Neufville Professor of Engineering Systems.
Airport master planning for infrastructure development Gabriel Hyde.
TRACECA INVESTMENT FORUM Brussels 2012 International Issykul Airport Reconstruction Project KYRGYZ REPUBLIC.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
Useful tips for a first-time air passenger
Lecture 4: Landside By: Zuliana Ismail.
COCHIN INTERNATIONAL AIRPORT LIMITED 1. CIAL-A PATHBREAKER Cochin International airport, the country’s first Greenfield airport built under public private.
ACI Biometrics Task Force Status Report ACI Bio TF Meeting 2 Geneva, Switzerland April 21, 2005.
Is it easier to travel Nowadays? Air travelling Form 9.
September, 2015 YQ Fulfilment. YQ Preposition a global network of specialist airport meet & assist service partners 1.
DESIGNING FACILITYLAYOUT OF ISLAMABAD DOMESTIC AIRPORT.
UML DESIGN By: J Kamala Ramya Y Devika
Airports of Montenegro. General informations  Airports of Montenegro is a public enterprise established by the Government of the Republic of Montenegro.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport Policy Bilateral screening:
CCS HUNGARY Baggage Reconciliation System
Introduction to Wireless Technology Dr. Alfred Loo.
By Byeong Chan Kang(LUKE). MADRID GIRONA SPAIN Aeropuerto de Madrid MADRID AIRPORT.
South Pacific Aviation Challenges POOR REGULATORY OVERSIGHT
Last updated 31 Dec 1900 FLIGHT DEPARTURES Date Flight No ETD (Local)
Aeronautical Facilities
Door to Door Travel Model
Last updated 23 Feb 1605 FLIGHT DEPARTURES Date Flight No ETD (Local)
Continuous Improvement
PebbleCreek Travel International Club Welcome to all Oct. 31, 2017
Planning for a New Airport in Thessaloniki, Greece
Stansted Transformation Programme Overview
Airport Management System Operation Guide
Air Canada is the flag carrier and largest airline of Canada by fleet size and passengers carried.
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
Travelling by plane.
Design of Components of Airport Passenger Buildings
Terminal Design Passenger Processing
Arrivals09:41 Please do not leave your baggage unattended.
EMMANUEL MENANTEAU CEO of Cambodia Airports. EMMANUEL MENANTEAU CEO of Cambodia Airports.
IMPORTANT NOTICE Travel Partners,   Amman, April 3,  As of April 7, 2019, Royal Jordanian will move its operations to/from Istanbul, from Istanbul.
TERMINAL 1 layout 2019 PAX FLOW DEPARTURE PAX departure T1
NOME Leadership Summit
Presentation transcript:

AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III

TECHNICAL DATA Operational capacity: 42 movements/hour Aircraft parking platforms: 2, with a total of 45 parking positions Runways: 08R – 26L: 3500 x 45 m; CAT IIIB 08L – 25R: 3500 x 45 m; CAT IIIA

TECHNICAL DATA Fire fighting and rescue: CAT 9 ICAO Terminals capacity: passengers/year Peak hour processing capacity: international flights 1200 pax/flow domestic flights 270 pax/flow

INFRASTRUCTURE DEVELOPMENT Main objectives (1): Extension of Finger, including implementation of Schengen flows – sq.m., from 5 to 14 air-bridges and from 9 to 24 gates –11 new escalators, 11 new lifts, 3 mobile sidewalks –Nov 2010/Apr 2011 Extension of the International Departures Terminal (future Departures Terminal) – sq.m., 52 check-in desks –8 new gates for non-Schengen flights –July 2012 Phase III of the airport development and modernization

INFRASTRUCTURE DEVELOPMENT Main objectives (2): Reconfiguration of the International Arrivals Terminal and Domestic Terminal building into the new Arrivals Terminal –2 500 sq.m. –52 new check-in desks –January 2012 Car parkings – sq.m., 459 lots –October 2009 Other works and access roads –5.000 sq.m. Phase III of the airport development and modernization

INFRASTRUCTURE DEVELOPMENT Passengers terminals final capacity: Passengers total capacity: 4500 pax/peak hour 86 check-in desks, 24 boarding gates, 4 baggage belts (international / Schengen) 18 check-in desks, 8 boarding gates, 2 baggage belts (domestic / non-Schengen) Over pax/year Phase III of the airport development and modernization

Phase III of the airport development and modernization project INFRASTRUCTURE DEVELOPMENT

Phase III of the airport development and modernization project

INFRASTRUCTURE DEVELOPMENT Phase III of the airport development and modernization project

BUCHAREST HENRI COANDĂ INTERNATIONAL AIRPORT