AIRPORT 2009 Airport Forum BUCHAREST, October 28-th, 2009 Development & Modernization / Phase III
TECHNICAL DATA Operational capacity: 42 movements/hour Aircraft parking platforms: 2, with a total of 45 parking positions Runways: 08R – 26L: 3500 x 45 m; CAT IIIB 08L – 25R: 3500 x 45 m; CAT IIIA
TECHNICAL DATA Fire fighting and rescue: CAT 9 ICAO Terminals capacity: passengers/year Peak hour processing capacity: international flights 1200 pax/flow domestic flights 270 pax/flow
INFRASTRUCTURE DEVELOPMENT Main objectives (1): Extension of Finger, including implementation of Schengen flows – sq.m., from 5 to 14 air-bridges and from 9 to 24 gates –11 new escalators, 11 new lifts, 3 mobile sidewalks –Nov 2010/Apr 2011 Extension of the International Departures Terminal (future Departures Terminal) – sq.m., 52 check-in desks –8 new gates for non-Schengen flights –July 2012 Phase III of the airport development and modernization
INFRASTRUCTURE DEVELOPMENT Main objectives (2): Reconfiguration of the International Arrivals Terminal and Domestic Terminal building into the new Arrivals Terminal –2 500 sq.m. –52 new check-in desks –January 2012 Car parkings – sq.m., 459 lots –October 2009 Other works and access roads –5.000 sq.m. Phase III of the airport development and modernization
INFRASTRUCTURE DEVELOPMENT Passengers terminals final capacity: Passengers total capacity: 4500 pax/peak hour 86 check-in desks, 24 boarding gates, 4 baggage belts (international / Schengen) 18 check-in desks, 8 boarding gates, 2 baggage belts (domestic / non-Schengen) Over pax/year Phase III of the airport development and modernization
Phase III of the airport development and modernization project INFRASTRUCTURE DEVELOPMENT
Phase III of the airport development and modernization project
INFRASTRUCTURE DEVELOPMENT Phase III of the airport development and modernization project