SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

Randy A. McClay, P.E., CSP Exran Consulting
Steel Construction.
AS9102 First Article Inspection Report
ASME Certified Yankee Dryer King Hardware May 3rd, 2010.
Pipe Supports and Hangers
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Pressure Safety Requirement – Assist Visit 10CFR Part 851 Review February 12, 2015 Team Audrey Daly Dave Meekins Will Oren George Rawls Steve Smith.
NE 127 – Codes, Standards, and Regulations American Welding Society INSTRUCTOR: Chattanooga State CC.
Subpart R Steel Erection
COMPANY PROFILE +66 (0) , +66 (0) , +66 (0) , +66 (0) /65 Moo 4 Tumbol Tubma Amphur Muang Rayong 21000
POLICY & PROCEDURE NCPWB WELDER PERFORMANCE QUALIFICATIONS
First Article Inspection Report
Johnson Street Bridge Replacement Project Technical Briefing April 8, 2015.
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
 Project Delivery  Design Considerations  Lessons Learned.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
NSTX Supported by NSTX Centerstack Upgrade Project Meeting P. Titus March American Welding Society Stainless Steel Edition.
The Good, the Bad, and the Ugly 2 May 2008 Sacramento, CA Alan Macnab
For the benefit of business and people
Weld Inspection Basics
Asphalt Quality Assurance Program
First Article Inspection
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Jim Merrill, Welding Engineer, Law Crandell
Construction Safety Council. by David G. Allie Subpart R - Steel Erection ( ) Tiered buildings not adaptable to temporary floors - Safety.
Appendices Subpart R Steel Erection
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
TIS Review 13 Dec Bill Elliott IR ABSORBER STATUS1 Bill Elliott LBNL Presented at the TIS SAFETY REVIEW 13 Dec Berkeley,CA brookhaven - fermilab.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
Allen Hughes State Materials Office
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
SFOBB East Span Seismic Safety Project Dan Ambuhl, Specifications Engineer, Caltrans.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 November 30, 2005.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Submittals. Submittals key to quality management of project Document or product turned in by construction team to verify that what they plan to purchase,
There are 2 Types of Bridge Inspectors – Class B and Class A.
Sign Structures Updates: Helpful Tips for Inspectors
Documentation.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Duties and Responsibilities
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
Design of Beam-Column Connections in Steel Moment Frames
Steel Fabrication & Erection of Belle Chasse Primary School ET-493 Final Proposal Spring 2015 Instructor: Chris Koutsougeras Advisor: Edward Rode’ Derek.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
GOVERNMENT OF TAMIL NADU HIGHWAYS DEPARTMENT HIGHWAYS RESEARCH STATION Training program for newly recruited Assistant Engineers.
Welcome to.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Structural drawing.
QC Document Update Todd Shields, INDOT.
First Article Inspection
Structural Drawing Chapter 19.
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
First Article Inspection
Installation Binder / IRR – an example
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Roof Control Jeopardy.
Dennis Harwig and Bill Mohr, EWI
Prime Factors for Successful Preservation Treatments
SNS PPU Helium Vessel Design and Assembly
Fiber Reinforced Polymer Systems
Presentation transcript:

SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans

SFOBB East Span Seismic Safety Project Steel Structures Special Provisions Welding Steel Audits Steel Structures (SAS)

SFOBB East Span Seismic Safety Project Applies to all Structural Steel Contractor is responsible for QC --Designate QC Inspector - CWI CT is responsible for QA Welding

SFOBB East Span Seismic Safety Project Quality Control Manager (QCM) --Responsible for quality of welding --Represents Contractor and subcontractors --May be an employee of the Contractor --Must be CWI --Submits, receives and approves all reports and correspondence Welding Quality Control

SFOBB East Span Seismic Safety Project Quality Control Plan (QCP) –Documentation of qualifications of all welding personnel and weld processes –Welding NDT methods and frequencies –Method of identification and tracking of each weld –Documentation of CT certification of UT personnel Welding Quality Control

SFOBB East Span Seismic Safety Project Documentation Submittals –Welding Report (within 7 days of welding) –Reports of all visual inspection and NDT Reports –Documentation of evaluation of NDT and reexamination of repaired welds –Daily welding production log Welding Quality Control

SFOBB East Span Seismic Safety Project Applies to all structural steel –General steel meeting –Contractor’s self audit (Audit Form in Information Handout) –CT audit (requires 50 working days) –Maximum 3 audits allowed –Documentation submittals--facility list, self audit submittal Steel Audit

SFOBB East Span Seismic Safety Project Steel Structures (SAS) Typical Structural Steel –Girders, plates, connections –Full scale mock-ups

SFOBB East Span Seismic Safety Project Steel Structures (SAS) Non Typical Structural Steel –Hinge Pipe Beams –Castings Portions of saddles –Modular Joint Seal Assemblies –Circular Segmented Bearings –Travelers

SFOBB East Span Seismic Safety Project Steel Structures (SAS) Requires fabricators and suppliers AISC certification Category Cbr, Major Steel Bridges, with Endorsement F, Fracture Critical Members Requires erectors AISC certification Category CASE, Certified Advanced Steel Erector, with Endorsement F, Fracture Critical Members

SFOBB East Span Seismic Safety Project Steel Structures (SAS) Working Drawing Fabrication submittal --Design geometry and fabrication geometry lines --Details of temporary and permanent fabrication --Distortion control plan per AWS --Material and weld designations and shop fabrication processes

SFOBB East Span Seismic Safety Project Working drawings fabrication (cont’ed) Orthotropic Box and Pipe Beam --Method of rib or pipe beam fabrication --Details of fabrication jigs --Location of tack welds and the sequence of all welding --Methods of repair of elements that exceed specified tolerances --Fabrication schedule

SFOBB East Span Seismic Safety Project Erection Plan Working Drawings --Details and limits of each section to be erected --Details of attachments to each section for transportation and lifting --Methods of transportation and lifting of each section --Methods of aligning adjacent sections during erection

SFOBB East Span Seismic Safety Project Erection Plan Working Drawings (cont’ed) --Details of temporary work platforms and other aids for field welding --Locations and methods of tack welds and final welds --Supplemental calculations indicating the stress on the permanent structure due to attachments and erection and estimates of final dimensions of the in-place condition

SFOBB East Span Seismic Safety Project Fabrication --Full size mock-ups are required for tower saddle, tower diaphragm, box panel with closed ribs and pile to footing connection --Examined visually and by UT or RT and MT --Sectioned to produce two macroetch samples for each weld and evaluated per AWS

SFOBB East Span Seismic Safety Project Assembly Tower sections --Ends of each lift section shall be milled to meet dimensional requirements. Each end shall be in a horizontal plane when standing on end. --Sections shall be abutted in the shop to ensure proper fit

SFOBB East Span Seismic Safety Project Assembly Orthotropic box --Shall be fabricated in subassemblies as shown on the plans --Subassemblies and preassembled sections shall be within the dimensions and tolerances shown on the plans, except for camber --Preassembly is required--three contiguous sections checked for matching, alignment and camber --,

SFOBB East Span Seismic Safety Project Shop Welding Dimensional Tolerances --Contractor to submit dimensional control procedure and the use of dimensional control templates for approval --Dimensional tolerances shall conform to AWS, and as modified by the plans and special provisions. --Box shall be checked against steel templates --Box members shall be within 4 mm of theoretical location,

SFOBB East Span Seismic Safety Project Welding of Closed Ribs to Box shell plate --Minimum 80% penetration of rib thickness --Weld procedure trials using the SAW automated welding method performed on a rib prototype 10 m long, stop/restart 2 m --Rib panel checked for straightness and production tolerances --Welds are 100% UT tested, rib is split in two and macroetched in 21 locations minimum --,

SFOBB East Span Seismic Safety Project Welding of Closed Ribs to Box shell plate Weld Evaluation Criteria --Minimum 80% weld penetration --No gross notches or burn-through at the rib inside surface --Tack welds shall be consumed --Acceptable macrosections will be considered qualified welds and will be used as standards of acceptance of production welds --,

SFOBB East Span Seismic Safety Project Welding of Closed Ribs to Box shell plate Monitoring Production Welds --Each welding machine tested every 4 hours --Test specimens shall consist of run-off extensions of production test panels --Test specimen shall be macroetched --If weld quality found unacceptable, welding parameters must be adjusted and two additional successful specimen trials must be done --,

SFOBB East Span Seismic Safety Project Field Welding --Same requirements as shop welding --Contractor to provide suitable enclosures to permit field welding in inclement weather per AWS and project requirements,

SFOBB East Span Seismic Safety Project Field Welding Pile to pile footing connection --Full scale wood mock-ups required of the pile to pile footing connection --Full scale steel mockups required of the pile to footing sleeve connection to demonstrate hole drilling, slot cutting, connection plate fitting, welding and inspection --Submittal of installation and welding sequence procedure for each mock-up

SFOBB East Span Seismic Safety Project Field Welding Pile to pile footing connection (cont’ed) --Procedure must describe equipment and details of installing the seal, field cutting slots in the piles and sleeves, installing the connection plates and performing all welding --Engineer to witness fit-up and welding of each mock-up

SFOBB East Span Seismic Safety Project Field Welding Pile to pile footing connection (cont’ed) --Mock-up assembly to be MT and UT tested --Macroetch specimens taken from pile to pile sleeve connector plate. Each specimen shall demonstrate the required weld size and weld profile --Results of the mock-up installation and welding sequence procedure shall be evaluated and final procedure developed