Protect and restore Deer Creek watershed Protect and Restore Deer Creek Watershed Nez Perce Tribe Fisheries/Watershed BPA Project #28044.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

Investigate the Life History of Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Basin Project Brian Jonasson Oregon Department.
Walla Walla Basin Fish Habitat Enhancement Project CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION.
Nez Perce Tribe Department of Fisheries Resource Management CBFWA Presentation September 22, 2004 Clearwater Subbasin Focus Watershed Program
Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
Confederated Tribes of the Umatilla Indian Reservation Umatilla River Basin Anadromous Fish Habitat Enhancement Project Project No Presented.
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Rehabilitate Newsome Creek Watershed BPA Project #
Lolo Creek Watershed Project #
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Project Introduction Consists of 1,760 deeded acres timber, sagebrush, and wet/dry meadow habitats. Includes Big, Lake, and McCoy Creeks.
Project Introduction Consists of 9,040 acres of deeded land and 52,000+ acres of state and federal lands. Encompasses 16.6 miles of the South Fork and.
Fluvial Bull Trout Migration and Life History Investigations, Upper Salmon River Subbasin New Project Proposal, No Sponsored by: Shoshone-Bannock.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
Protect & Restore The North Lochsa Face Analysis Area Watersheds (# ) Nez Perce Tribal Fisheries/Watershed Jack J.S. Yearout.
LOWER SALMON RIVER Tributary Protection and Enhancement.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Upper Toppenish Watershed Restoration Project ( ) Yakama Nation Division of Natural Resources.
Lower Snake River Compensation Plan Hatchery Evaluations – Salmon River Project No Nez Perce Tribe Department of Fisheries Resources Management.
Assessment of Bull Trout Populations in the Yakima River Watershed.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Grande Ronde River Restoration Project - La Grande, OR Union Soil and Water Conservation District, Union County, City of La Grande and U.S. Army Corps.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Acquire South Fork Asotin Creek Property A proposal from the Rocky Mountain Elk Foundation.
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
Moffatt Thomas Lower Boise River Wetlands Restoration Project Sponsor:Pioneer Irrigation District Presenter: Scott L. Campbell Legal Counsel for Pioneer.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
Restoration of Columbia River Floodplain Functions to Steigerwald Lake
Restoring Life History Diversity to Bonneville Cutthroat Trout and Bluehead Sucker in the Weber River Paul Burnett – Trout Unlimited Ben Nadolski – Utah.
Kalispel Tribe Resident Fish Program Hatchery - Wayne Gould Habitat- Michele Andersen.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Fundamentals of River Restoration and Salmonid Fisheries OWEB, 1999, Fundamentals of River Restoration and Salmonid Fisheries OWEB, 1999, Fundamentals.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
LOW-FLOW MONITORING IN SONOMA CREEK AND TRIBUTARIES In June 2000, Sonoma Ecology Center staff initiated a low-flow monitoring program in Sonoma Valley.
Thomas R. Payne & Associates Update on Flood Storage Fish Study Presented by Paul Schlenger, Bob Montgomery, Jim Shannon June 15, 2011.
Nez Perce Tribe Department of Fisheries Resource Management Nez Perce Tribal Executive Committee Natural Resource Sub-Committee July 1, 2008 Watershed.
Elk Creek Wood Replacement Phase Two Oregon Watershed Enhancement Board, 2009 Katie Halvorson.
Project Activity: Riparian Zone Restoration Scott Compton, Watershed Program Manager Valles Caldera National Preserve.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
Shoshone-Bannock Tribes Fish and Wildlife Department.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Nez Perce Tribe Department of Fisheries Resource Management Nez Perce Tribe / Nez Perce National Forest Partnership Overview February 3, 2011 Watershed.
San Pedro Creek: A Longitudinal Profile Study Andrew Georgeades Anne Jurek Mary Snow.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
The Upper Lochsa and Progress Toward Restoration Rebecca A. Lloyd, NPT Watershed Division.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Coos Watershed Association Watershed Restoration Projects.
Population - 44,301 18% - Aged 65+ Household Median Income- $29,530 Jan.-March 2004 unemployment 14 % Demographics.
Dungeness Watershed Action Plan Olympic National Forest.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Landscape Analysis Project: Craig Mountain Wildlife Management Area For/Range 527 Landscape Ecology.
San Luis Rey Profile 560 Square miles; 342 below Henshaw Dam; Third largest watershed in San Diego County; 242 tributaries adding up to 759 miles of.
The Malheur Subbasin Key Subbasin Facts 40 + Irrigation Dams – Impoundments & Irrigation Projects Primary Land Uses – Agricultural Production and Processing.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Shoreline Master Program (SMP) Update City of Forks June, 2011 Rebekah Gentry Olympic Natural Resources Center.
Fish and Watershed Restoration Efforts in the Ninemile Drainage: Potential, Progress, and Opportunity Clark Fork R.
An Overview of the Flathead Subbasin Planning Process
The Gila River Restoration at Apache Grove
Challenges Facing Riparian Ecosystems
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Stream Connectivity in the Clark Fork Watershed
Restoration Considerations
Acknowledgements Dr. Peter Tschaplinski, MOE
Presentation transcript:

Protect and restore Deer Creek watershed Protect and Restore Deer Creek Watershed Nez Perce Tribe Fisheries/Watershed BPA Project #28044

Protect and restore Deer Creek watershed The Proposal: Protect and Restore Deer Creek Watershed Overall Project Goal: Restore ecosystem functions in Deer Creek Watershed to increase and stabilize key species Restore ecosystem functions in Deer Creek Watershed to increase and stabilize key species

Protect and restore Deer Creek watershed The Proposal: Protect and Restore Deer Creek Watershed Project Objectives: Fence cattle out of 9 miles of creek Fence cattle out of 9 miles of creek Complete watershed analysis to identify fine scale, site specific problems Complete watershed analysis to identify fine scale, site specific problems Recommend restoration actions. Recommend restoration actions.

Protect and restore Deer Creek watershed Deer Creek Watershed Elevations range from 1,080 feet at the mouth to 5,000 feet at the headwaters The watershed is 25,618 acres in size, and extends approximately 17 miles north to the headwater areas within the Craig Mountains. Drainages in lower portions of the watershed are deeply incised with near vertical canyon walls, while those in upland areas are less confined and bordered by wide floodplains

Protect and restore Deer Creek watershed

Land ownership 12,774 acres (50%) Idaho Department of Fish and Game (IDFG) 7,049 acres (27%) Nez Perce Tribe (NPT), 3,673 acres (14%) private 1, 161 acres (4%) Bureau of Land Management (BLM) and 961 acres (3%) Idaho Department of Lands (IDL)

Protect and restore Deer Creek watershed Current land use impacts The land use impacts in the watershed include grazing, timber harvest, and roads. Livestock grazing has been restricted on the majority of the lands in the drainage since Livestock grazing in the upper watershed still continues and is contributing to bank instability, riparian damage, soil compaction, and nutrification (Rabe 2001, unpublished data)

Protect and restore Deer Creek watershed Characterization of the watershed The headwater areas of Deer Creek have been logged and roaded. In 1967, the Eagle Creek fire burned a majority of the watershed, which was subsequently salvage logged (USDI-BLM 2000). Sedimentation from roads is most problematic in the upper portions of the drainage. Estimated road density throughout the watershed is 1-3 miles/mi 2.

Protect and restore Deer Creek watershed Characterization of the watershed The combined effects of grazing, roading, and timber harvest have impaired water quality in Deer Creek. In 1998, Deer Creek was listed by the State of Idaho as impaired under section 303(d) of the Clean Water Act for sediment.

Protect and restore Deer Creek watershed Characterization of the watershed ESA-listed steelhead documented in lower four miles of Deer Creek Rearing habitat for juvenile spring/summer chinook salmon in lower reaches Resident redband/rainbow trout (sympatric), upper limits to distribution are unknown Subadult/adult fluvial forms of bull trout and westslope cutthroat trout may occupy lower reaches Brook trout most prolific above stream mile 7.0

Protect and restore Deer Creek watershed Limiting factors-upper watershed Habitat surveys near the confluence with the West Fork Deer Creek documented low canopy cover, a low pool to riffle ratio, poor width:depth ratio, macroinvertebrate biotic integrity, and the lowest habitat index scores of the four streams studied (China Creek, Eagle Creek, and Wapshilla Creek) sampled (Rabe 1994, unpublished data).

Protect and restore Deer Creek watershed Limiting factors-- upstream from stream mile 7.0 excessive sediment deposition, high summer water temperatures, poor instream cover : A lack of high-quality pool habitat (USI-BLM 2000; Rabe 2001, unpublished data; Rabe 1994, unpublished data):

Protect and restore Deer Creek watershed Limiting factors in lower watershed Water quality Water quality

Protect and restore Deer Creek watershed Early Construction Activities Exclusion fencing for cattle along approximately 9 miles miles of mainstem and tributary riparian area. Exclusion fencing for cattle along approximately 9 miles miles of mainstem and tributary riparian area. Most of this area includes lush wetlands currently disturbed by grazing. Most of this area includes lush wetlands currently disturbed by grazing. Collapsed and unstable streambanks and riparian vegetation is either missing or greatly reduced. Collapsed and unstable streambanks and riparian vegetation is either missing or greatly reduced. Some recruitment of native vegetation is occurring is that is notably stunted because of grazing. Some recruitment of native vegetation is occurring is that is notably stunted because of grazing. Build 3 miles of fence each year for three years Build 3 miles of fence each year for three years

Protect and restore Deer Creek watershed Future activities Active revegetation of the riparian area will be delayed until natural recovery can be gauged. Active revegetation of the riparian area will be delayed until natural recovery can be gauged. Several sections of the mainstem in the upper watershed may need to be reconfigured Several sections of the mainstem in the upper watershed may need to be reconfigured These sections will not be included in the first three years of fencing until their hydrology has been analyzed. These sections will not be included in the first three years of fencing until their hydrology has been analyzed.

Protect and restore Deer Creek watershed Why start with an EAWS? Significant data gaps and missing analyses. Watershed, fish and wildlife habitat databases are now outdated. Comprehensive temperature data and analyses are insufficient. Hydrologic, riparian, and channel processes need to be investigated in some detail.

Protect and restore Deer Creek watershed Why start with an EAWS? The knowledge of disturbance patterns needs to be strengthened. Data on sensitive plants, noxious weeds, and vegetative response units requires updating. Studies and analyses to date have lacked an adequate ecosystem perspective. Inventories of logging roads and mining claims require updating.

Protect and restore Deer Creek watershed Why start with an EAWS? No consensus on next steps No consensus on next steps

Protect and restore Deer Creek watershed Project Objectives: Conduct a fine scale analysis to describe past and current conditions in the watershed Conduct a fine scale analysis to describe past and current conditions in the watershed Prioritize critical areas for restoration and/or protection Prioritize critical areas for restoration and/or protection Provide a means by which the watershed can be understood as an ecological system Provide a means by which the watershed can be understood as an ecological system Improve resolution of the Salmon subbasin summary and assessment Improve resolution of the Salmon subbasin summary and assessment

Protect and restore Deer Creek watershed Project Strategies: Spend one year in data collection efforts Spend one year in data collection efforts

Protect and restore Deer Creek watershed Project Strategies: Spend one year in data collection efforts Spend one year in data collection efforts Spend one year drafting the EAWS Spend one year drafting the EAWS

Protect and restore Deer Creek watershed Project Strategies: Spend one year in data collection efforts Spend one year in data collection efforts Spend one year drafting the EAWS Spend one year drafting the EAWS Work cooperatively with: Work cooperatively with: Nez Perce Tribe Nez Perce Tribe IDFG IDFG IDL IDL BLM BLM Private landowners Private landowners

Protect and restore Deer Creek watershed Thank you. May I answer any questions?

Protect and restore Deer Creek watershed Project Strategies: EAWS six-step process EAWS six-step process Characterization of the watershed Characterization of the watershed

Protect and restore Deer Creek watershed Project Strategies: EAWS six-step process- Characterization of the watershed Characterization of the watershed Identification of issues and key questions Identification of issues and key questions

Protect and restore Deer Creek watershed Project Strategies: EAWS six-step process- Characterization of the watershed Characterization of the watershed Identification of issues and key questions Identification of issues and key questions Description of current conditions Description of current conditions

Protect and restore Deer Creek watershed Project Strategies: EAWS six-step process- Characterization of the watershed Characterization of the watershed Identification of Issues and key questions Identification of Issues and key questions Description of current conditions Description of current conditions Description of reference conditions Description of reference conditions

Protect and restore Deer Creek watershed Project Strategies: EAWS six-step process- Characterization of the watershed Characterization of the watershed Identification of issues and key questions Identification of issues and key questions Description of current conditions Description of current conditions Description of reference conditions Description of reference conditions Interpretation of information Interpretation of information

Protect and restore Deer Creek watershed Project Strategies: EAWS six-step process- Characterization of the watershed Characterization of the watershed Identification of issues and key questions Identification of issues and key questions Description of current conditions Description of current conditions Description of reference conditions Description of reference conditions Interpretation of information Interpretation of information Recommendations Recommendations