Protect & Restore The North Lochsa Face Analysis Area Watersheds (#200003400) Nez Perce Tribal Fisheries/Watershed Jack J.S. Yearout.

Slides:



Advertisements
Similar presentations
COMPARATIVE SURVIVAL STUDY (CSS) of PIT-tagged Spring/Summer Chinook and PIT-tagged Summer Steelhead CBFWA Implementation Review Mainstem/Systemwide.
Advertisements

Restore and Protect Red River Watershed BPA Project #
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Investigate the Life History of Spring Chinook Salmon and Summer Steelhead in the Grande Ronde River Basin Project Brian Jonasson Oregon Department.
Nez Perce Tribal Conservation Enforcement Presentation by Chief Adam Villavicencio for the System-wide Provincial Review July 18, Copyright.
Nez Perce Tribe Department of Fisheries Resource Management CBFWA Presentation September 22, 2004 Clearwater Subbasin Focus Watershed Program
Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
Restore Lawyer Creek Habitat: Targeting Steelhead and Chinook Salmon.
Rehabilitate Newsome Creek Watershed BPA Project #
Lolo Creek Watershed Project #
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Assessment of A-run Steelhead population in the Clearwater Nez Perce Tribe Department of Fisheries Resources Management.
Protect and restore Deer Creek watershed Protect and Restore Deer Creek Watershed Nez Perce Tribe Fisheries/Watershed BPA Project #28044.
Westland-Ramos Fish Passage and Habitat Restoration Project BPA Project No September 23, 2004 Westland Irrigation District.
Imnaha River Smolt Survival and Smolt to Adult Return Rate Quantification (Imnaha River Smolt Monitoring Program) BPA Project Number Nez Perce.
Implement Actions to Reduce Water Temperatures in the Teanaway Basin BPA FY 2002 Columbia Plateau Province Proposal Project ID #
David P. Statler n Nez Perce Tribe n Department of Fisheries Resources Management n Director of Resident Fisheries.
Fall Chinook Acclimation Project (FCAP) Overview Under ESA NMFS lists Snake River fall chinook as threatened in 1992 Co-managers agreed to release 450,000.
Monitoring and Evaluation of Yearling Fall Chinook Salmon Released Upstream of Lower Granite Dam Nez Perce Tribe Department of Fisheries Resources Management.
Fishery Management Overview - Context Sponsored By: Colville Confederated Tribes Presented By: Stephen Smith.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION
LOWER SALMON RIVER Tributary Protection and Enhancement.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Protect and Restore Little Salmon River Project # Nez Perce Tribe Fisheries/Watershed Program By Chad Fealko.
CHARACTERIZE AND ASSESS WILDLIFE-HABITAT TYPES AND STRUCTURAL CONDITIONS FOR SUB-BASINS WITHIN THE BLUE MOUNTAIN PROVINCE Project:
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
Acquire South Fork Asotin Creek Property A proposal from the Rocky Mountain Elk Foundation.
Nez Perce Tribal Hatchery (NPTH) DEPARTMENT OF FISHERIES RESOURCE MANAGEMENT 1 - CENTRAL INCUBATION FACILITY FOR SPRING AND FALL CHINOOK 3 - FALL CHINOOK.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
The Columbia/Snake System
11 Implement Wy-Kan-Ush-Mi Wa-Kish-Wit Project #: Aja DeCoteau, CRITFC Watershed Department Manager.
CSMEP Goal: Improve the quality and consistency of fish monitoring data, and the methods used to evaluate these data, to answer key questions relevant.
Land Use Summit - Overview Background The need and how the Summit came to be. What Happened The program and attendee survey. Results Rural values and long.
Northwest Passage Scenic Byway An All-American Road Presentation to the 14 th Annual Northwest Tribal Transportation Symposium May 31, 2007.
Upper Willamette River Recovery Planning WITHIN OUR REACH New Partnerships for a Healthier Willamette December
Overview of Current Production Programs Across the Columbia River Basin.
TRIBAL DATA NETWORK COLUMBIA RIVER INTER-TRIBAL FISH COMMISSION.
Crystal Springs Hatchery Facilities
L ESSONS L EARNED BY P ROJECT T YPE Acknowledgements: This truly was a cooperative effort between the NPT, USDA-FS and the many contractors who have completed.
Nisqually Watershed Flying for Fish Habitat Tours 2010.
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
Protect & Restore Northeast Oregon/Southeast Washington Project Number ISRP – Geographic Review May 1, 2013.
Nez Perce Tribe Department of Fisheries Resource Management Nez Perce Tribal Executive Committee Natural Resource Sub-Committee July 1, 2008 Watershed.
Monitor and Evaluate Salmonid Production in the Asotin Creek Subbasin - LSRCP (ID #200116)
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Nez Perce Tribe Department of Fisheries Resource Management Nez Perce Tribe / Nez Perce National Forest Partnership Overview February 3, 2011 Watershed.
Nez Perce Tribe Department of Fisheries Resource Management WATERSHED DIVISION FCRPS Biological Opinion Expert Panel “Gap Filling by Habitat Actions”
Involvement in SW Jemez Mountains Landscape Restoration Project (SWJMLRP), under CFLRP March 12, 2015 PUEBLO OF JEMEZ.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
The Upper Lochsa and Progress Toward Restoration Rebecca A. Lloyd, NPT Watershed Division.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Fish and Game Commission Meeting October 8, 2014 Stafford Lehr Fisheries Branch 2014 Proposed Fresh Water Sport Fishing Regulation Changes.
Population - 44,301 18% - Aged 65+ Household Median Income- $29,530 Jan.-March 2004 unemployment 14 % Demographics.
Dungeness Watershed Action Plan Olympic National Forest.
Columbia River Basin Fish Restoration Activities ACCOMPLISHMENTS TO DATE AND UPCOMING ISSUES Bonneville Legal Briefing – October 2015.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) CBFWA – Ken MacDonald ESSA Technologies Ltd. - Marc Porter State Agencies IDFG.
Seattle City Light Stewardship Program Background: SCL stewardship work was contracted with SFEG to be conducted on the City’s lands purchased under the.
Fish and Watershed Restoration Efforts in the Ninemile Drainage: Potential, Progress, and Opportunity Clark Fork R.
Crow/Quartz Creek Instream Large Wood Recruitment
Watershed Restoration on the Lolo NF Benefits for the Clark Fork Watershed Taylor Greenup, Hydrologist, Lolo National Forest Jennifer Mickelson,
Steelhead status in Idaho – 2012 Update
Steelhead status in Idaho 2010 update
Steelhead status in Idaho 2010 update
Leveraging Funding from Other Sources: a Programmatic Approach
Local Chapters. To conserve, protect, and restore North America’s coldwater fisheries and their watersheds.
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

Protect & Restore The North Lochsa Face Analysis Area Watersheds (# ) Nez Perce Tribal Fisheries/Watershed Jack J.S. Yearout

North Lochsa Face Analysis Area

Background Key fisheries species – spring Chinook salmon, steelhead, bull trout, cutthroat trout Project area approx. 128,000 acres 8 sub-watersheds – Pete King, Rye Patch, Canyon, Apgar, Glade, Deadman, Bimerick, and Fish Past land management –Timber harvest –Jammer road systems –Streamside roads

Limiting Factors Sediment High embeddedness levels (38.7%) Landslides from closed or abandoned roads major contributing factor Temperature exceeds state standards

Justification for Restoration Location Stronghold of threatened Snake River Steelhead (Fish Ck.) Prominent tribal fisheries & cultural value Salmon Supplementation Studies research project (Pete King Ck.) Co-Management between CNF & Tribe

Project History 2000 – Completion of road surveys and Road Obliteration Effectiveness Monitoring sites – Partnership Agreement finalized w/ CNF outlining cost share responsibilities Implementation pending upon litigation and finalization of supplemental EIS.

2002 Proposal Objectives Alleviate sediment input from road caused sources by obliterating 20 miles of road M&E of road obliteration implementation & effectiveness M&E of long term watershed conditions (Project # 28045) Dissemination of project information and peer review