Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission.

Slides:



Advertisements
Similar presentations
Monitoring Watershed Restoration Effectiveness Nez Perce Tribe DFRM-Watershed Division Rebecca A. Lloyd, Project Leader.
Advertisements

Wasco County Soil and Water Conservation District 1 WASCO RIPARIAN BUFFER PROJECT Briefing for CBFWA Anadromous Fish Committee by Ron Graves.
CONFEDERATED TRIBES OF THE UMATILLA INDIAN RESERVATION Walla Walla River Juvenile and Adult Walla Walla River Juvenile and Adult Fish Passage Improvements.
Nez Perce Tribal Conservation Enforcement Presentation by Chief Adam Villavicencio for the System-wide Provincial Review July 18, Copyright.
Nez Perce Tribe Department of Fisheries Resource Management CBFWA Presentation September 22, 2004 Clearwater Subbasin Focus Watershed Program
Fish and Wildlife Losses and Hydroelectric System Responsibility January 2004.
Implement the Grande Ronde Model Watershed Program Administration and Habitat Restoration Projects Project Lyle Kuchenbecker, Project Planner.
Lolo Creek Watershed Project #
Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
Assessment of A-run Steelhead population in the Clearwater Nez Perce Tribe Department of Fisheries Resources Management.
Protect and restore Deer Creek watershed Protect and Restore Deer Creek Watershed Nez Perce Tribe Fisheries/Watershed BPA Project #28044.
Ecosystem Diagnosis and Treatment in the Columbia Cascade Province Project Goal: The Columbia Cascade Province will have an implementation strategy that.
A forum for coordinating state, federal, and tribal watershed and salmon monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring.
DRAFT Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop July 23, 2007.
Restore and Protect Red River Watershed Nez Perce Tribe Fisheries Watershed Program.
LOWER SALMON RIVER Tributary Protection and Enhancement.
Lawyer Creek Steelhead Trout Habitat Improvement Project presented by: Lewis Soil Conservation District.
This presentation will probably involve audience discussion, which will create action items. Use PowerPoint to keep track of these action items during.
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
CHARACTERIZE AND ASSESS WILDLIFE-HABITAT TYPES AND STRUCTURAL CONDITIONS FOR SUB-BASINS WITHIN THE BLUE MOUNTAIN PROVINCE Project:
Little Canyon Creek Subwatershed Steelhead Trout Habitat Improvement Project Sponsored by: Lewis Soil Conservation District.
1 Fish & Wildlife Managers Program Amendment Recommendations January 17, 2008.
Restore McComas Meadows /Meadow Creek Watershed Project # Restore McComas Meadows/ Meadow Creek Watershed Project # Nez Perce Tribe Fisheries.
1 Measuring Progress: Monitoring and Evaluation in WRIA 8 WRIA 8 Salmon Recovery Council November 19, 2009 Scott Stolnack WRIA 8 Technical Coordinator.
Planning Commission April 14, 2010
Shoreline Master Program Update Shoreline Master Program Update: Process Overview City of Benton City August 30,
Joint Work Session Skagit County Planning Commission and Shoreline Advisory Committee May 22, 2012.
Preliminary Results of Management Question Survey Jim Geiselman & Jen Bayer March 16, 2006 Pacific Northwest Aquatic Monitoring Partnership (PNAMP)
CSMEP Goal: Improve the quality and consistency of fish monitoring data, and the methods used to evaluate these data, to answer key questions relevant.
Medway Valley Heritage Forest Environmentally Significant Area Phase One - Conservation Master Plan Community Information Meeting July 25, :45 –
1 Landscape Unit Planning Guide Training 2 Agenda for the day 8:30 AM - 4:30 PM - opening remarks - introduction - wildlife tree retention - review principles.
Idaho Rapid Watershed Assessments (RWA) Natural Resources Conservation Service Idaho Soil Conservation Commission Idaho Association of Soil Conservation.
Shoreline Master Program Update. Shoreline Management Act approved by voters in the early 1970’s to: – Encourage water-dependent uses – Protect shoreline.
Briefing to the Caribbean Fisheries Management Council April 23, 2014.
Fish and Wildlife Program’s Columbia River Basin High Level Indicators Tracking Progress in the Council Fish and Wildlife Program October 2009 Ketchum,
Forest Plan Revision Using the 2012 Planning Rule Process Overview Steps and Expectations (I don’t know….but I’ve been told…if the horse don’t pull….you.
Natural Heritage & Urban Forest Strategy (NH&UFS) DRAFT STRATEGY Open House Presentation June 20 th, 2013.
Proposed Approach for Developing Columbia Basin Salmon and Steelhead Goals June 3, 2015.
Protect & Restore Northeast Oregon/Southeast Washington Project Number ISRP – Geographic Review May 1, 2013.
8/29/2006 DRAFT Implementing an Adaptive Management Framework for the Fish and Wildlife Program DRAFT.
A Partnership of U.S. Federal, State and Tribal Fish and Wildlife Agencies with support from the Association of Fish & Wildlife Agencies Shared solutions.
Defining CBFWA’s FY09 Workplan Members January 15, 2009.
Washington State Steelhead Status Review PACIFIC COAST STEELHEAD MEETING JON ANDERSON WASHINGTON DEPARTMENT OF FISH & WILDLIFE MARCH 9-11, 2010.
A forum for coordinating state, federal, and tribal aquatic monitoring programs in the Pacific Northwest Pacific Northwest Aquatic Monitoring Partnership.
1 A Presentation to the NOAA Science Advisory Board Usha Varanasi, Ph.D. Science Director Philip Roni, Ph.D. Research Fishery Biologist Northwest Fisheries.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Columbia River Basin White Sturgeon Framework Lynn Palensky Northwest Power and Conservation Council Portland, Oregon USA July 2013.
REGIONAL COORDINATION High Level Indicators Draft “white paper” to recommend a core set indicators that can be shared among all types of monitoring Protocol.
Fiscal Year 2004 April 10, FY 2002FY 2003FY 2004 EnactedBudgetBudget COLUMBIA RIVER BASIN: Army Corps of Engineers Bureau of Land.
The Upper Lochsa and Progress Toward Restoration Rebecca A. Lloyd, NPT Watershed Division.
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
January 27, 2011 Examples of Recovery Evaluation Objectives in the Western U.S. Delta Stewardship Council Presentation by the Independent Consultant.
Columbia River Basin Monitoring, Evaluation, Research, and Reporting (MERR) Plan DRAFT Nancy Leonard Fish, Wildlife, Ecosystem Monitoring and Evaluation.
Dungeness Watershed Action Plan Olympic National Forest.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
Estuary Actions for Salmon and Steelhead Columbia River Estuary Science Policy Exchange September 10-11, 2009 NOAA 2008 FCRPS Biological Opinion Estuary.
1 The Collaborative, Systemwide Monitoring and Evaluation Project (CSMEP) CBFWA – Ken MacDonald ESSA Technologies Ltd. - Marc Porter State Agencies IDFG.
Coordinated Assessments Project Overview & Next steps January 17, 2012 Presented to: Independent Science Review Panel Tom Iverson, CBFWA.
Wildlife Program Amendments Joint Technical Committees and Members Advisory Group Amendment Strategy Workshop.
North Atlantic LCC Science Needs and Projects Background Vision and Mission 2010 Projects (review, status, next steps) 2011 Science Needs Assessment, Workshop.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Aquatic and Riparian Conservation Strategy
Landscape Conservation Strategy
An Overview of the Flathead Subbasin Planning Process
Confederated Tribes of the Umatilla Indian Reservation Program Project Semiannual Report Project: Future Flows Reporting Period: January through June 2017.
Washington County Parks and Open Spaces
Tucannon River Programmatic Habitat Program (a 30 mile long project)
Presentation transcript:

Clearwater Subbasin Planning or The Long and Winding Road Clearwater Focus Program Idaho Soil Conservation Commission

Clearwater Subbasin in the Basin

Clearwater Focus Program Origin and Structure Authorized by the 1994 NW Power and Conservation Councils Columbia Basin Fish and Wildlife Program, funded by the Bonneville Power Administration. Program is co-coordinated by : Idaho Soil Conservation Commission Nez Perce Tribal Watershed Division

Purpose of the Clearwater Focus Program Coordinate watershed projects to protect, enhance, and restore habitat impacted by the Columbia River hydroelectric system.Coordinate watershed projects to protect, enhance, and restore habitat impacted by the Columbia River hydroelectric system. Facilitate optimal use of funding sources and subbasin expertise.

Land Cover Types

Western Clearwater Subbasin

Eastern Clearwater Subbasin

Ownership and Management

ESA Listed Fish Species in the Subbasin Fall Chinook, to Lolo Creek West Coast Steelhead Bull Trout

ESA Listed Animal Species in the Subbasin Gray Wolf American Peregrine Falcon Bald Eagle Grizzly Bear

ESA Listed Plant Species Spaldings Catchfly Macfarlanes Four OClock Water Howellia Ute Ladies Tresses

Habitat Project Areas

SCC Coordination Objectives The Road Were On Subbasin Assessment Subbasin Management Plan & Inventory Implementation Project Support

Policy Advisory Committee People on the Highway Idaho Association of Counties/Idaho County Idaho State: IDEQIDFGIDL Nez Perce Tribe Executive Committee Soil and Water Conservation Districts Clearwater and Nez Perce National Forests NOAA Fisheries U.S. Fish and Wildlife Service Potlatch Corporation

The Funding Trail Rockin Down the Highway CBFWA MMG endorsed contract modifications March 2000 Council approved contract modifications April 5, 2000 Bonneville contracts September 2000

Add Provincial Review Along the Road March 2001 Draft Subbasin Summary May 2001 Final Subbasin Summary August 2001 Aquatic Assessment August 2001 Provincial Review October 2001 Terrestrial Assessment

Planning Phase Hit the Road Again PAC began the planning process in January 2002 after Provincial Review activities were complete. The Technical Guide for Subbasin Planners was available for this phase. Guidelines were not mandatory.

The Vision Transcendental Highway PAC developed a vision statement and 9 guiding principles for planning The vision for the Clearwater Subbasin is a healthy ecosystem with abundant, productive, and diverse aquatic and terrestrial species, which will support sustainable resource-based activities

Plan Completed Dancing on the Highway The Final Draft Clearwater Subbasin Plan was presented to the Northwest Power and Conservation Council in Coeur dAlene on November 14, 2002

The First ISRP Junction Pavement Cracks The ISRPs 43-page review of the draft Clearwater Subbasin Plan was available February 19, 2003 – Some of the points: Plan is not complete enough to be consistent with the Councils Program In current form does not constitute a viable subbasin plan

More at the First ISRP Junction Breakdown Lane Strategies are not fully and clearly defined nor are they prioritized Linkages (internal consistency) between assessment/management plan/inventory are not explicitly described Aquatic and Terrestrial resources need to be described more quantitatively.

More at the First ISRP Junction Wreck on the Highway Other than these the ISRP loved the draft Clearwater Subbasin Plan Actually, the ISRPs evaluation inspired additional subbasin plan review criteria be adopted to the Councils program

Contingency Planning Crawling from the Wreckage Clearwater PAC decided to respond to ISRP comments and requested the Council not start the adoption process The logic path went something like: Gee with so many comments, certainly we can improve the plan

Amending and Rewriting On the Road Again Response fix-it loop began July 2003 Prioritized and selected subset of ISRP deficiencies to address Clearwater Subbasin Plan formally submitted for adoption process November 19, 2003

The Second ISRP Junction Sideways Down The Highway The ISRPs 25-page review of the Clearwater Subbasin Plan was available February 6, 2004 – Some points: There were fewer pages because the ISRP referred to their previous review often While an improvement over the 2002 draft, it does not differ substantively from that draft …………

Adoptability Framework Bright Side of the Road Councils central staff developed a framework for adoptability and used it to evaluate the Clearwater Subbasin Plan Framework based on Councils program language and the Power Act; later used to review other subbasin plans

Where is the Clearwater Plan Today Side of the Road Clearwater Planners responded to central staff Adoptability Framework review Clearwater Subbasin Plan was categorized as between the Green Group and the Blue Group in basin plan review process Await next phase of process

Production of Clearwater Plan Hillbilly Highway 34 PAC Meetings 24 Subcommittee Work Sessions 5 NOAA Specific Meetings 11 Public meetings 23 Drafted Component Releases 8 Drafted Whole Plan Releases 114 Individuals Participated in Process

Issues that Popped Up Malfunction Junction(s) Assessment & Summary Production Models for data synthesis Subbasin Planning vs Recovery Planning Public participation Additional program language review criteria & new adoptability criteria ISRP – Twice

Whats Next in the Clearwater Further up the Road Implementation projects continue as ongoing until plan adoption and call for new projects – the system to be designed Continue to pursue project funds from multiple sources Continue subbasin plan implementation via other processes and funding

What a Long Strange Trip it has Been Questions and/or Comments

Potential Management Units Groups of 6 th Field HUCs, contiguous or not, clustered to characterize areas with similar themes that may influence restoration or recovery planning. Individual project planning will require site specific information. There are 22 PMUs delineated in the Clearwater.

Attributes Delineating PMUs Species (4) - Distribution, Life History, Hatchery Influence, Exotic species Landscape Level (4) - Ownership Accessibility, Protection, Land Use Habitat (5) – Habitat & H2O Quality, Limiting Factors, Temperature, Hydrology Disturbances (10) – Roads, Mines, Sediment, Surface Erosion, Landslide, Etc

Distribution and Relative Status of Steelhead in the Subbasin Layer

Road Density GIS Layer

Surface Erosion Hazard Layer

§303(d) Listed Streams

Landslide Hazard Layer

Potential Management Units

Watershed Scale

Big Canyon Creek Disturbances Potential Management Unit 6 –Surface Erosion Hazards – Very High –Landslide Hazard – Moderate to High –Road Densities – Moderate to High Potential Management Unit 7 & 8 –Surface Erosion Hazards – Very High –Road Densities – Moderate to High

Big Canyon Watershed & PMUs Limiting Factors –Temperature –Base Flow –Sediment –Watershed Disturbance –Habitat Degradation Restoration Issues –Temperature –Sediment –Prairie Grasslands –Ponderosa Pine