Duane L. Penney, Inc. 10 Key Points to Conduct a Landfill Evaluation.

Slides:



Advertisements
Similar presentations
For DBEs OSHA Effective Safety and Health Programs Speaker: Brian Bothast of OSHA.
Advertisements

Safe Systems The Safe System of Work By Konrad Burgoyne DTP-SSOW Issue 2 – 27 January 2012 Dataplate Training Copyright © Dataplate
TurnKey Project Management Services Capabilities Briefing.
Struck By/Caught Between 29 CFR 1926 Objectives In this course, we will:  Recognize potential struck by/caught between scenarios  Identify and recognize.
2014 Chip Seal Training Contract Administration Issues.
Loading and Hauling.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Earthwork Operations & Equipments
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
What is NPDES? “National Pollutant Discharge Elimination System”
FHWA Sustainable Highways Self- Evaluation Tool Tracking Environmental Commitments Recycle and Reuse Materials Construction Equip. Emission Reduction Construction.
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
“A driver initiated program” Lance Morgan Dave Conklin.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Transportation Infrastructure Technical Assistance Survey (oil counties)
Position Opening Page 1 Job Classification: Mobile Equipment Operator I-II Opening Date: October 27, 2014 Location: 67th Ave Closing Date: November 7,
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Excavation Review 1.  OSHA began because, until 1970, there were no national laws for safety and health hazards.  On average, 12 workers die every day.
Dump Point Safety Prepared by
Contractor Safety Management
Wastewater P2. Environmental Concerns  Heavy metals from sanding waste  Oil, grease, and coolant from vehicles  Toxic chemicals from cleaners, strippers,
1 Getting Beyond Compliance With Safety, Health and Environment Management Disclaimer: These safety materials, resources and PowerPoint ® presentations.
ISO Standard is based on the management model of plan – do - check – act. Today we all be discussing the elements of the standard that deal with.
State Debris Management Plan California the “Disney Land of Disasters”
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Module 7: Construction Phase
ISO OPERATIONAL CONTROL
EnE 301: ENVIRONMENTAL ENGINEERING
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
How Landfill s affect US by hailey marr What is a landfill? F A landfill is an engineered depression in the ground used to store wastes. F Like a bathtub.
EUROPE CONTRACTING. EUROPE CONTRACTING Company Presentation  International Activity Activity in Romania Projects in Romania Quality Management Health.
LINER AND COVER CONSTRUCTION BASICS Presented by: Curt Ahrendsen, Principal American Environmental Consulting AEC.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Colorado Rocky Mountain Chapter of Solid Waste Association of North America SWANA Annual Conference Friday, October 3, 2008.
Field Visit MODULE 8: Walkthrough of a Healthcare Waste Treatment Facility.
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
Lecture 2 Introduction to Earthmoving
Planning for Earthwork Construction
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
2 3 4 Office equipment can include:  Computers and computer peripherals  Telephone, facsimile  Photocopies  Presentations equipment  Furniture.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Accident Prevention Manual for Business & Industry: Engineering & Technology 13th edition National Safety Council Compiled by Dr. S.D. Allen Iske, Associate.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
TRENCHING & EXCAVATION
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Waste Management and Research Center Waste Management and Research Center l Formed in 1984 l IL Dept of Natural Resources l Located at University of Illinois.
PRESENTATION ON FOUR WEEK SUMMER TRAINING AT PWD GORAKHPUR
PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.
Commercial, Industrial, and High-Risk Runoff 6/13/20161 Commercial, Industrial and High Risk Runoff.
Chicago Area Facilities (CAF) Ground Disturbance and Excavation Procedure.
Powered Industrial Trucks: Forklifts—Overhead Transparencies © 1998 Comprehensive Loss Management, Inc. 1 Powered Industrial Trucks.
Operations Update Report
Numfon Eaktasang ,Ph.D Thammasat University
Health and safety organization on construction site
Goodyear Napanee Contractor Safety
CONSTRUCTION METHODS & TECHNOLOGY
General Contract Management Structure
General Contract Management Structure
INDOT Storm Water Management
General Contract Management Structure
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

Duane L. Penney, Inc. 10 Key Points to Conduct a Landfill Evaluation

Sanitary landfills are complex and require technical and operational expertise to maintain a balance of compliance, economics and safety. It may be a good idea to conduct a complete evaluation of your landfill. The following is a checklist that will help you begin the process of developing your landfill evaluation.

K EY P OINT #1 P ERMITS AND R EGULATIONS R EVIEW OF ALL LANDFILL MONITORING AND OPERATIONAL PERMITS E VALUATE COMPLIANCE WITH ALL PERMIT REQUIREMENTS AND REPORTING DEADLINES E VALUATE MONITORING REQUIREMENTS FOR REGULATORY UPDATES AND POSSIBLE VARIANCES R ECORD KEEPING AND DOCUMENTATION OF PERTINENT INFORMATION O RGANIZED AND WORKING FILE SYSTEM

K EY Point #2 C USTOMER C ONTROL AT THE G ATE R EQUIRED SIGNAGE IN PLACE S CALES CALIBRATED AND CERTIFIED C HARGING BY THE TON OR YARD T ICKETS BEING ISSUED FOR DOCUMENTATION AND TRACKING G ATE KEEPER TRAINED ON PROCESS AND PROCEDURES R EQUIRED INFORMATION SIGNS IN PLACE T ARE WEIGHT PROGRAM IN PLACE FOR VEHICLES

K EY P OINT #3 A CCESS FOR C USTOMERS R OADS GRADED, SMOOTH AND SAFE FOR VEHICULAR TRAFFIC R OADS ALL WEATHER SURFACE FOR INCLEMENT WEATHER R OADS MAINTAINED AND SLOPED FOR RUNOFF WITH FUNCTIONAL DITCHES D IRECTIONAL SIGNS IN PLACE S PEED LIMITS SIGNS IN PLACE L ITTER PICKED UP AND CONTROLLED

K EY P OINT #4 W ORKING F ACE O RGANIZATION AND S AFETY K EEPING VEHICLES WITH DUMP BEDS THAT RAISE AWAY FROM OTHER VEHICLES T RUCKS MAINTAIN A SAFE DISTANCE FROM CARS AND PICK - UPS K EEP HEAVY EQUIPMENT A SAFE DISTANCE FROM VEHICLES T IPPING AREA LEVEL F OLLOWING OPERATIONS PLAN FOR DAILY ACTIVE AREA O PERATORS TRAINED IN HAZARDOUS WASTE IDENTIFICATION

K EY P OINT #5 H EAVY E QUIPMENT U TILIZATION, A PPLICATION, P ROCUREMENT AND M AINTENANCE H AVING THE RIGHT EQUIPMENT FOR THE JOB E MPLOYEES TRAINED AND CERTIFIED TO OPERATE HEAVY EQUIPMENT K NOWING THE PRODUCTION AND CAPABILITIES OF THE EQUIPMENT D AILY EQUIPMENT INSPECTION FORM R EPAIRS AND SERVICES COMPLETED AND DOCUMENTED, ACCORDING TO SPECIFICATIONS P ROCESS USED FOR MAJOR REPAIRS OR TO PURCHASE AND EVALUATE REPLACEMENT EQUIPMENT M AINTENANCE PROGRAM IN PLACE AND BEING FOLLOWED

C OMPACTION C OMPACTION EQUIPMENT EVALUATION M AXIMIZING YOUR AIRSPACE C OMPACTORS AND DOZERS AT THE WORKING FACE M EASURING YOUR COMPACTION A NNUAL FLYOVER OR PHYSICAL SURVEY L EVEL OF STANDARD C OMPACTION EQUIPMENT METHODS K EY P OINT #6

K EY P OINT #7 F ILL S EQUENCE A CCESS AND ROADS TO NEW CELL T HREE TO FIVE YEAR PLAN FOR FILL SEQUENCE C ONTIGUOUS CELLS M AXIMIZING VEHICLE TRAFFIC FOR COMPACTION P LAN YOUR FILL SEQUENCE WITH EXCAVATION PLAN S CHEDULING INTERMEDIATE COVER OR FINAL COVER WITH CELL EXCAVATION

K EY P OINT #8 E XCAVATION P LAN S OIL BALANCE FOR THE LIFE OF THE SITE T RACKING USAGE OF SOIL T YPES OF SOIL FOR LINER OR COVER ( CLAY VERSUS OTHER TYPES OF MATERIALS ) E QUIPMENT USED TO HAUL AND APPLY SOIL FOR DAILY COVER E XCAVATION PLAN AND FILL SEQUENCE PLAN D ISTANCE, METHOD AND COSTS TO EXCAVATE AND HAUL SOIL

K EY P OINT #9 M ETHOD TO A PPLY D AILY C OVER A LTERNATIVE DAILY COVER S PRAY ON APPLICATION U SE DOZER TO SPREAD SOIL FOR DAILY COVER S CRAPER TO HAUL AND DUMP H AUL TRUCKS AND TRACK HOE T RACK AIRSPACE CONSUMPTION WITH COVER MATERIALS

K EY P OINT #10 C ELL C ONSTRUCTION AND L ANDFILL C OVER P LAN THE CELL CONSTRUCTION WITH THE FINAL COVER TOGETHER IF POSSIBLE TO SAVE MOVING THE SOIL TWICE K EEP CLAY AREAS SEPARATE FOR FUTURE CLAY LINER C OMPETITIVELY BID CONTRACTOR SERVICES P LAN DESIGN AND APPROVALS WELL IN ADVANCE OF CONSTRUCTION SEASON P ROTECT YOUR WORK FROM WEATHER C ELL CONSTRUCTION AND EXCAVATION C OSTS PER ACRE FOR CELL CONSTRUCTION AND FINAL COVER M ETHODS USED FOR FINAL COVER