Green Recycling Network Toward a Greener Tomorrow... Today!

Slides:



Advertisements
Similar presentations
Making Greenways Greener: Developing a Sustainable Trail in Ramsey County Ramsey County 2007 Lower Afton Road Trail Project By Commissioner Victoria Reinhardt.
Advertisements

Cara - Waste Management That Doesn't Cost The Earth WASTE MANAGEMENT - INDUSTRY BEST PRACTICE Dr. Peter Coulahan Cara Group Safety Manager A PRESENTATION.
Richard A. Ludt Waste Management Administrator Interior Removal Specialist, Inc. LEED ® AP.
September 24, »Utilizing funds from Moving Ohio Forward Demolition Program »Requires a local match »Program managed by Hamilton County Land Reutilization.
ANSI/ASHRAE /USGBC/IES/ Standard AND ITS REQUIREMENTS COMPARED TO LEED V 3 Presented by: Rachael Green Huitt-Zollars; USGBC North Texas Chapter.
A Free, Confidential & Non-Regulatory Program Smart Waste Management alternatives for Iowa business & industry Reduce Reuse Recycle.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Waste Management in Hospitality Industry Paul Cetola - LEED AP Allied Waste Services.
BRUSH and BULK COLLECTION MODIFICATIONS SOLID WASTE SERVICES Department of Public Works City of Temple September 2006.
C&D & MRFs Willamette Resources, Inc. Wilsonville, OR Armando Arellano, LEED AP BD+C, O+M Willamette Resources, Inc. Wilsonville, OR Armando Arellano,
FHWA Sustainable Highways Self- Evaluation Tool Tracking Environmental Commitments Recycle and Reuse Materials Construction Equip. Emission Reduction Construction.
Construction and Demolition Waste Management at UVM
1 DEBRIS MANAGEMENT OVERVIEW PRESENTER: GREG KELLER, Disaster Recovery Branch Grants Administrator/Public Assistance Officer (614)
Presented to SWAC February 16, 2012 City of Cleveland Automated Waste Collection And Curbside Recycling Program.
Performance Dashboard Recycling Performance Period Total September 2012 – September % of Campus Waste was Recycled during the performance period.
Waste Strategy & Implementation Plan. Background Population of approx. 140,000 Approx. 67,000 households 50% of properties high-rise/ tenemental Current.
Unique Building Maintenance Services Corp. 353 West 39 th St. New York, NY Phone: (212) Fax: (212)
University Of Utah Enhanced Recycling Program. Why Recycle? Environmental Stewardship Environmental Stewardship Sustainability Leadership Sustainability.
Waste Reduction In Rhode Island Hotels and Restaurants Presented by: Timothy Byrne February 24, 2010.
Albuquerque Recycling Now & In the Future Mayor Martin J. Chávez __ Ed Adams, P.E., Chief Administrative Officer Irene García, Chief Operations Officer.
„Business opportunities in waste treatment” Conference -Tel Aviv
San Juan County Solid Waste Program Rate Workshop 12/10/02.
Introduction The Institution Recycling Network 7 South State Street Concord, NH John Gundling, CWM Specialist.
Bethany Ramey Trombley Architect, LEED AP ID+C September 10, 2010 UT’s Hearst Student Media Center LEED GOLD Renovation What Starts Here Changes The World.
Construction Waste & Recycling.  Construction waste is one of largest waste streams in U.S. It takes up 25%- 45% waste in national landfill.  According.
Material and Waste. Materials Management Planning of material use, material reuse, material reduction and recycling begins in the first stage of a project.
Commercial Waste Reduction Coordinator NEWMOA Conference, Sept 2005
Rachel Weaver Program Manager Maryland Energy Administration
Construction and Demolition Waste Reduction Management and Practices University of Santo Tomas College of Architecture.
Materials and Resources. 1.Materials and Resources Goals LEED NC Prerequisites & Credits Intent & Strategies LEED EBOM Credits 2.Indoor Environmental.
Miami Dade Resources Recovery Facility Operated By: Montenay Power Corporation.
Slideshow B19: Reduce, Reuse, Recycle. What can we do to help?
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
John Gundling. AGENDA  Eco One Solutions  Offered Services  Environmental Impact  C&D, The Connecticut Example  Achieving Exemplary Performance.
OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring and Reporting 2009 CSP Grant OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring.
GLOBAL Commercial Solutions Cost Segregation Overview.
Deconstruction: A Local Government Model Wayne Fenton Orange County Public Works, Hillsborough, NC.
California Venue and Event Recycling Legislation Review of AB 2176 Model Ordinance For Waste Reduction at Venues and Events.
Armstrong World Industries Ceiling Tile Recycling Neal McDwyer Recycling Manager Hi I am Anita Snader from Armstrong World Industries, Commercial Ceilings.
Roadmap to a Sustainable Waste Management Future Waste Diversion Strategies in the Unincorporated Communities of Los Angeles County Throughout the Region.
Recycling and Reuse Policy for C&D Waste Justin Green Program Director Build It Green!NYC.
WasteCap Resource Solutions, Inc.. WasteCap Resource Solutions Nonprofit 501(c)(3) Providing waste reduction and recycling assistance for the benefit.
Reclaimed Inputs FSC-STD Version 1-0 Supplementary standard to CoC FSC-STD Version: 02 Oct 2008.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review September 29, 2014.
California Integrated Waste Management Board March 16, 2004 San Jose, CA City of San Jose Diversion Programs.
Town of Cape Elizabeth Recycling Workshop September 11, 2007.
Construction and Demolition Waste Management at UVM.
Proposed Demolition Processing Pilot Project. Background Northwoods Pilot Project – Results presented at MPCA Conference – 2000 Re-Use sheds constructed.
Take the Risk out of Sustainability Willis Construction Risk Management Conference September 2013.
Prepared for Enterprise Community Partners. Enterprise Community Partners | 2GREEN & HEALTHY LIVING: Waste & Recycling Why Recycle? Each American generates.
DOLLARS AND SENSE SALVAGE Spawning Economic Development from Material Recovery.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
Presented by Katelyn Wright, Greater Syracuse Land Bank Executive Director Mike Gable, Construction Junction Executive Director Winnie Branton, Esq., Branton.
Board Workshop: Overview Of CIWMB Waste Characterization Studies and Tools May 9, 2006.
40 by 2020 “Pay As You Throw” A Phased In Approach.
Recycling C&D Waste Instead of Landfilling. What CAN Be Recycled? Dirt Cardboard Drywall HDPE (5 gallon buckets) Clean white wood Metal Brick block and.
Minimizing Waste – The Harvard Blackstone UOS Project John Gundling, LEED AP The Institution Recycling Network 7 South State Street Concord, NH
SNL/NM Pollution Prevention Critical Mass Achieved: C&D Waste Recycling at Sandia National Laboratories OFEE Symposium June 3, 2008 Ralph Wrons P2 Program.
DEMOLITION WASTE RECYCLING RCBC 2016 Conference | May 2016 PRESENTERS: Suzanne Bycraft: Manager, Fleet & Environmental Programs Linh Huynh: Waste Reduction.
Deconstruction in Milwaukee Challenges and Solutions Kathryn Berger Senior Program Officer Milwaukee LISC.
Getting to Open Space. RELOCATION OF STRUCTURE The primary purpose of this option is to relocate structurally sound homes out of flood hazard areas. This.
Innovative Construction and Demolition Initiatives Mark Maxwell Emily DeCremer.
Process Economics Factors that affect profitability
WASTEMENEGEMENT IN BUILDINGS
Construction Debris Best Management Practices
PRESENTATION TO.
Fauquier County’s Journey of Construction and Demolition
Nova Scotia: Thinking Outside the Landfill
Site Based Preconstruction - Demolition
Solid Waste Grant Program Information Session June 4, 2019.
Presentation transcript:

Green Recycling Network Toward a Greener Tomorrow... Today!

Outline A brief introduction Markets primer Greening office renovations Deconstruction case study Best practices Future

Deconstruction The Deconstruction process is cost effective relative to traditional demolition because we avoid costly land disposal by leveraging off the expertise of our affiliated, integrated companies. Thus, no matter the job or the mix of materials, clients get great green results even when a project involves a diverse mix such as salvage, drywall (including painted), unusable furniture, carpet, ceiling tile, and even mixed debris.

Deconstruction Deconstruction’s approach allows maximum diversion of materials from landfills disposal as the goal no matter the client or certification being sought. This standardized approach, coupled with market development capabilities focused on finding outlets for problem materials and with highly trained crews capable of consistently beating expected timelines, allows outstanding results every time (typical diversion rates routinely exceed 90%).

So where does it all go?

Market: aggregate

Market: cardboard / paper

Market: carpet / pad

Market: ceiling tile

Market: metal

Market: plastic

Market: wallboard

Market: wood

Market: salvage (residential)

Market: salvage (commercial)

Deconstruction: greening office renovations Selective demolition; construction in reverse More labor intensive than traditional demolition Has highest diversion capability Costlier than demolition? NO! More time consuming? NO! How? PLANNING!

Case study

Getting started

Following the hierarchy

Cleaning house

Creating value

Project results Completed 1 week AHEAD of schedule Approach saved owner > 50% of budget Consignment contract returns $$ Clean space drastically reduces cost of remediation and final demolition Avoided cost of temporary shoring Landfill diversion rate exceeded 75%

Recent office fit-out results Slightly more expensive than typical due to building constraints and drywall logistics, however…. Total diversion = 90.1% 6.3 tons salvage (doors, lights, ceiling tile); 28.6 tons recycled (drywall, carpet, metal); 3.84 tons went to landfill.

Best practices Specify Design for recycling Innovate Look to the future

Get what you want: specify DEMOLITION WASTE MANAGEMENT SPECIFICATIONS 1. 1.THIT IS A REQUIREMENT FOR THIS PROJECT THAT THE GENERAL CONTRACTOR RECYCLE, REUSE AND/OR SALVAGE AS MUCH MATERIAL AS POSSIBLE. ALL CONSTRUCTION DEMOLITION OF EXISTING BUILT CONDITIONS SHALL BE RECYCLED AS NECESSARY TO MEET MINIMUM REQUIREMENT OF AT LEAST 50% DEMOLITION DEBRIS THE PATH FOR ALL DEMOLISHED MATERIALS SHOULD BE FIRST TO REUSE, SECOND TO RECYCLE, AND LASTLY TO LANDFILL. THE BID BREAKDOWN SHALL INCLUDE A WASTE HANDLING PLAN THAT IDENTIFIES HOW THE WASTE STREAMS WILL BE SEPARATED AND MANAGED, AND SHALL INCLUDE THE FOLLOWING CATEGORIES: a. a.WHAT ITEMS WILL BE SALVAGED VS RECYCLED VS LANDFILLED b. b.HOW THEY WILL BE SALVAGED OR RECYCLED c. c.WHAT PERCENTAGE OF TOTAL DEMOLITION IS BEING SALVAGED VS RECYCLED VS LANDFILLED d. d.WHERE WILL THE SALVAGED AND RECYCLED ITEMS BE DIVERTED TO 3. 3.UNLESS OTHERWISE INDICATED, DECONSTRUCTION WASTE BECOMES THE PROPERTY OF THE CONTRACTOR SCHEDULE OF DECONSTRUCTION ACTIVITIES: INDICATE THE FOLLOWING: a. a.DETAILED SEQUENCE OF DECONSTRUCTION AND REMOVAL WORK, WITH STARTING AND ENDING DATES FOR EACH ACTIVITY. b. b.INTERRUPTION OF UTILITY SERVICES IF REQUIRED. INDICATE HOW LONG UTILITY SERVICES WILL BE INTERRUPTED. c. c.COORDINATION FOR SHUTOFF, CAPPING AND CONTINUATION OF UTILITY SERVICES. d. d.USE OF ELEVATOR AND/OR STAIRS. e. e.LOCATIONS OF PROPOSED DUST- AND NOISE-CONTROL TEMPORARY PARTITIONS AND MEANS OF EGRESS. f. f.MEANS OF PROTECTION FOR ITEMS TO REMAIN AND ITEMS IN PATH OF MATERIAL REMOVAL FROM BUILDING DOCUMENT GENERAL CONDITION OF MATERIALS TO BE SALVAGED PRIOR TO REMOVAL. CONDUCT PRE- DECONSTRUCTION CONFERENCE ONSITE. REVIEW METHODS AND PROCEDURES RELATED TO DECONSTRUCTION. DESIGNATE AREA(S) ON SITE FOR SEGREGATED OR COMMINGLED COLLECTION OF RECYCLABLE MATERIALS DOCUMENTATION BY THE DEMOLITION CONTRACTOR IS REQUIRED TO VERIFY ALL REUSED AND/OR RECYCLED MATERIALS. HAUL TICKETS AND RECEIPTS SHALL BE PROVIDED BY THE RECIPIENTS OF SALVAGED AND RECYCLED MATERIALS; RECEIPTS SHALL BE MAINTAINED AND MADE AVAILABLE UPON REQUEST.

Plan for end of life Do markets exist? Are outlets local? Forecast infrastructure changes Examine installation practices

Think outside of the box Reusing just 10 doors at a 5,000 SF office fit- out completely pays for the deconstruction expense! New 10 doors: $10,000 Salvage 10 doors: $2,000 Savings: $8,000 Vs. Vs. Avg. Demo: $7,500

Future: green-to-green facilities

Huge capacity

End product capability

THANK YOU! Contact Information: Scott Shepard O. (703) C. (703)