COSMO General Meeting, Athens, 18 – 21 Sept. 2007 Overview on Data Assimilation WG1 Overview 1 WG1 Overview

Slides:



Advertisements
Similar presentations
13 th SRNWP / 28 th EWGLAM Meeting Zürich, 9 – 12 Oct current status long-term strategy mid-term strategy some ongoing.
Advertisements

COSMO General Meeting Zürich, Sept Stefan Klink, Klaus Stephan and Christoph Schraff and Daniel.
COSMO General Meeting, Cracow, 15 – 19 Sept Overview on Data Assimilation WG1 Overview 1 Developments at DWD
1 00/XXXX © Crown copyright Use of radar data in modelling at the Met Office (UK) Bruce Macpherson Mesoscale Assimilation, NWP Met Office EWGLAM / COST-717.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss The Latent Heat Nudging Scheme of COSMO EWGLAM/SRNWP Meeting,
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Institut für Physik der Atmosphäre On the Value of.
Francesca Marcucci, Lucio Torrisi with the contribution of Valeria Montesarchio, ISMAR-CNR CNMCA, National Meteorological Center,Italy First experiments.
WWOSC 2014 Assimilation of 3D radar reflectivity with an Ensemble Kalman Filter on a convection-permitting scale WWOSC 2014 Theresa Bick 1,2,* Silke Trömel.
Status of WG1 and Science Plan Issues COSMO General Meeting, Sibiu, 2 – 5 Sept Status of WG1 Science Plan Issues Christoph.
Introduction to KENDA KENDA Mini-Workshop., Munich, 28 Feb Introduction to KENDA as COSMO Priority Project Christoph Schraff.
A Radar Data Assimilation Experiment for COPS IOP 10 with the WRF 3DVAR System in a Rapid Update Cycle Configuration. Thomas Schwitalla Institute of Physics.
WG1 Workshop for Strategy Discussion Zurich, 19 Sept 2005 WG1 Overview 1 WG1 Projects and New Activities
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Statistical Characteristics of High- Resolution COSMO.
WWOSC 2014, Aug 16 – 21, Montreal 1 Impact of initial ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model.
ISDA 2014, Feb 24 – 28, Munich 1 Impact of ensemble perturbations provided by convective-scale ensemble data assimilation in the COSMO-DE model Florian.
IV WMO Impact Workshop 2008Alexander Cress Regional impact studies performed in the COSMO community Alexander Cress, Reinhold Hess Christoph Schraff German.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss High-resolution data assimilation in COSMO: Status and.
Data assimilation and observing systems strategies Pierre Gauthier Data Assimilation and Satellite Meteorology Division Meteorological Service of Canada.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss High Resolution Snow Analysis for COSMO
COSMO General Meeting, Offenbach, 7 – 11 Sept Dependance of bias on initial time of forecasts 1 WG1 Overview
Radar in aLMo Assimilation of Radar Information in the Alpine Model of MeteoSwiss Daniel Leuenberger and Andrea Rossa MeteoSwiss.
COSMO General Meeting, Athens, 18 – 21 Sept new list of activities WG1 List of Activities 2007 – WG1 Priority Projects.
COSMO General Meeting, Cracow, 15 – 19 Sept Overview on Data Assimilation WG1 Overview 1 WG1 Overview
Requirements from KENDA on the verification NetCDF feedback files: -produced by analysis system (LETKF) and ‘stat’ utility ((to.
Evaluation of the Latent heat nudging scheme for the rainfall assimilation at the meso- gamma scale Andrea Rossa* and Daniel Leuenberger MeteoSwiss *current.
Outline Background Highlights of NCAR’s R&D efforts A proposed 5-year plan for CWB Final remarks.
Data assimilation and forecasting the weather (!) Eugenia Kalnay and many friends University of Maryland.
Nudging Radial Velocity, OPERA, LHN for COSMO-EU COSMO GM, Sibiu, 2 September Recent developments at DWD
KENDA & WG1 Overview COSMO GM, Rome, 6 September Deutscher Wetterdienst, D Offenbach, Germany.
Assimilation of Satellite Radiances into LM with 1D-Var and Nudging Reinhold, Christoph, Francesca, Blazej, Piotr, Iulia, Michael, Vadim DWD, ARPA-SIM,
Ensemble data assimilation in an operational context: the experience at the Italian Weather Service Massimo Bonavita and Lucio Torrisi CNMCA-UGM, Rome.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz First Experience with KENDA at MeteoSwiss Daniel Leuenberger,
Data Assimilation for Very Short-Range Forecasting in COSMO WMO WS on Use of NWP for Nowcasting, Boulder, 24 – 26 Oct
KENDA (Km-Scale Ensemble-based Data Assimilation) COSMO General Meeting, Offenbach, 7 – 11 Sept KENDA Contributions / input.
GPS GPS derived integrated water vapor in aLMo: impact study with COST 716 near real time data Jean-Marie Bettems, MeteoSwiss Guergana Guerova, IAP, University.
10 th COSMO General Meeting, Krakow, September 2008 Recent work on pressure bias problem Lucio TORRISI Italian Met. Service CNMCA – Pratica di Mare.
Assimilating satellite cloud information with an Ensemble Kalman Filter at the convective scale Annika Schomburg, Christoph Schraff, Hendrik Reich, Roland.
COSMO General Meeting Zurich, 20 – 23 Sept 2005 WG1 Overview 1 WG1 Overview Deutscher Wetterdienst, D
Implementation and Testing of 3DEnVAR and 4DEnVAR Algorithms within the ARPS Data Assimilation Framework Chengsi Liu, Ming Xue, and Rong Kong Center for.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz The new multi-layer snow model Guy de Morsier 1, Jean-Marie.
Assimilation of Satellite Radiances into LM with 1D-Var and Nudging Reinhold, Christoph, Francesca DWD, ARPA-SIM COSMO General Meeting, Athens September.
Page 1 Developments in regional DA Oct 2007 © Crown copyright 2007 Mark Naylor, Bruce Macpherson, Richard Renshaw, Gareth Dow Data Assimilation and Ensembles,
Trials of a 1km Version of the Unified Model for Short Range Forecasting of Convective Events Humphrey Lean, Susan Ballard, Peter Clark, Mark Dixon, Zhihong.
Joint SRNWP/COST-717 WG-3 session, Lisbon Stefan Klink Data Assimilation Section Early results with rainfall assimilation.
Page 1© Crown copyright 2005 DEVELOPMENT OF 1- 4KM RESOLUTION DATA ASSIMILATION FOR NOWCASTING AT THE MET OFFICE Sue Ballard, September 2005 Z. Li, M.
1 INM’s contribution to ELDAS project E. Rodríguez and B. Navascués INM.
Overview of WG5 activities and Conditional Verification Project Adriano Raspanti - WG5 Bucharest, September 2006.
Vincent N. Sakwa RSMC, Nairobi
COSMO General Meeting Bucharest, Sept Klaus Stephan, Stefan Klink and Christoph Schraff and Daniel.
Progress in Radar Assimilation at MeteoSwiss Daniel Leuenberger 1, Marco Stoll 2 and Andrea Rossa 3 1 MeteoSwiss 2 Geographisches Institut, University.
A physical initialization algorithm for non-hydrostatic NWP models using radar derived rain rates Günther Haase Meteorological Institute, University of.
COSMO General Meeting 2008, Krakow Modifications to the COSMO-Model Cumulus Parameterisation Scheme (Tiedtke 1989): Implementation and Testing Dimitrii.
Status of soil moisture production at DWD Interim ELDAS Data coordination meeting Martin Lange, Bodo Ritter, Reinhold Schrodin.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
COSMO General Meeting Zürich, Sept Christoph Schraff Revision of Quality.
Assimilating Cloudy Infrared Brightness Temperatures in High-Resolution Numerical Models Using Ensemble Data Assimilation Jason A. Otkin and Rebecca Cintineo.
Eidgenössisches Departement des Innern EDI Bundesamt für Meteorologie und Klimatologie MeteoSchweiz Ensemble activites and plans at MeteoSwiss André Walser.
© Crown copyright Met Office Review topic – Impact of High-Resolution Data Assimilation Bruce Macpherson, Christoph Schraff, Claude Fischer EWGLAM, 2009.
Joint MAP D-PHASE Scientific Meeting - COST 731 mid-term seminar, May 2008, Bologna. ErgebnissErgebniss : Long-Term Evaluation of COSMO-DE and COSMO-EU.
Studies with COSMO-DE on basic aspects in the convective scale:
QPF sensitivity to Runge-Kutta and Leapfrog core
BACY = Basic Cycling A COSMO Data Assimilation Testbed for Research and Development Roland Potthast, Hendrik Reich, Christoph Schraff, Klaus.
Recent developments in Latent Heat Nudging at DWD
Daniel Leuenberger1, Christian Keil2 and George Craig2
EUMETSAT fellow day, 17 March 2014, Darmstadt
COSMO General Meeting 2009 WG5 Parallel Session 7 September 2009
PP Kenda : Status Report christoph.
Comparison of different combinations of ensemble-based and variational data assimilation approaches for deterministic NWP Mark Buehner Data Assimilation.
Selected Priority Projects
Latest Results on Variational Soil Moisture Initialisation
Presentation transcript:

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 1 WG1 Overview Deutscher Wetterdienst, D Offenbach, Germany

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 2 Priority Project 1SIR filter project leader ad interim:Christoph Schraff (DWD) scientific guidance:Werner Wergen (DWD) task 0:Cosmin Barbu, Victor Pescaru (INM) Task 0.2 (implement & test SIR filter for KdV equation):stopped The number of accounted FTE is subject to discussion in the STC: Rumania:either 0 FTE (if FTE means: trained FTE) or 0.3 FTE (any FTE) Germany:0.1 FTE Task 1 Meeting 14 June 07: Schüttemeyer (Uni Bonn, 2-y PostDoc) evaluate COSMO-DE-EPS for SIR (ensemble spread in first 1 – 3 hrs, ensemble size / drift, indication of non-Gaussianity) initial evaluation should be finished by end of 07 Other news SAC/STC decision: long-term strategy of COSMO for DA to be re-discussed (2 meetings with external experts, 5 Sept (P.J. van Leeuwen), 18 Sept (Chris Snyder)) SIR project is being revised / replaced

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 3 Workshop on strategy for convective-scale data assimilation Offenbach, 5. Sept Participants: COSMO SAC, STC, SPM, WG1 (Tsyrulnikov, Bonavita), DWD (Wergen, Rhodin), Uni Bonn (Prof. Simmer), van Leeuwen Recommendations Recommendations (from discussion after van Leeuwen’s talk on SIR) we want EPS, therefore we need EnDA (Ensemble-based Data Assimilation) (this, and having too little resources rules (for it) out 4DVAR) keep the methodology / algorithm open (SIR, LETKF, …) set up a modular system / framework for ensemble DA –modular means that others (universities..) can use it –components of the system can be replaced by alternatives –Nudging play a role e.g. in the SIR approach look into how non-Gaussian (prior pdf & obs pdf) and non-linear the system is, how important convective scale details in the initial state are (in the work plan: exploit ensembles) put also sufficient resources into improving the model physics at the convective scale

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 4 New PP: Km-scale Ensemble-based Data Assimilation (KENDA) Strategy Strategy: 2 approaches –Sequential Importance Resampling (SIR) filter (van Leeuwen, 2003) –can handle major challenges on convective scale (non-Gaussian distributions, highly non-linear processes & obs operators, flow-dep & unknown balance, (model errors ?) ) –not yet applied to NWP, practical challenges: –ensemble size, ens drift, ens spread, compression of obs information –localisation approach alleviates these challenges, introduces new ones (need to glue members together) –more basic research required, should rely mainly on resources from co-operating universities and research institutions –Local Ensemble Transform Kalman Filter (LETKF, Hunt et al., 2007) –Gaussian approximation –applied successively to NWP, less problems expected to get it working –devote resources from weather services in COSMO

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 5 New PP: Km-scale Ensemble-based Data Assimilation (KENDA) Discussion with input from Chris Snyder 18 Sept 2007 on EnKF –no new obstacles seen for the EnKF –to get a system to evaluate, need 2 people (with good background) for 2 years –do EnKF first without radar data (quality control problems), gain experiences, detect bugs / flaws in the scheme, later include radar data

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 6  talk by Reinhold Hess Priority Project 2Use of 1dVar Satellite Retrievals Project leader: Reinhold Hess (DWD) SEVIRI(MSG)Francesca di Giuseppe, Elementi, Marsigli (ARPA-EMR) ATOVS(NOAA1x)(Blazej Krzeminski) (IMGW), Hess, Schraff (DWD) Model / Nudging issues:Christoph Schraff (DWD)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 7 Nothing done on: Assimilation of dual Doppler wind GPS-ZTD-derived integrated water vapour (IWV) Production and use of cloud analysis Further tuning of nudging Use of lake temperature analysis

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 8 DWD: – LHN switched off in pre-op. trials during winter due to bright band problem – COSMO-DE with LHN operational since April 2007 – too strong LHN forcing due to microphysics changes  grid point search revised – benefit slightly enhanced with new version of LHN (throughout forecast) – assessed benefit from revisions done in 2005 / 2006 to cope with prognostic precip 1.1.1Latent Heat Nudging Klaus Stephan (DWD), Daniel Leuenberger (MCH) Christoph Schraff, Stefan Klink (DWD)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 9 ETS FBI scores for hourly precipitation 15 – 30 August 2006 (16 days) threshold = 0.5 mm/h assimilation (conventional) LHN, diagnostic precip. conventional LHN, prognostic precip. revised LHN, prognostic precip. free forecasts ( UTC runs) forecast hour time [UTC] Frequency Bias Equitable Threat Score [%] LHN and prognostic precipitation

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 10 Problem 1: unrealistic pressure perturbations : greatly reduced LHN, old grid point searchLHN, new grid point search mm / 24h radar mm / 1h reduced snow fall velocity, modified snow geometry & size distribution, modif. auto conversion rate  more drifting of precipitation (snow), less drizzle, less orographic precipitation new microphysics changes  new revision of grid point search  stronger violation of basic assumption of LHN (vertically integr. latent heating  precip rate) due to larger temporal delay + horizontal drift

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 11 Problem 2: overestimation of precipitation (amount + area) reduced by ≥ 50 % new revision of grid point search LHN, old grid point searchLHN, new grid point search Mean = 2.8 mm / 24h radar Mean = 7.2Mean = – 30 August 2006: radar old search new search

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 12 ASS free forecast ASS free forecast LHN noLHN scores with latest version of microphysics & LHN 15 – 30 August, 00 and 12 UTC runs (32 forecasts) threshold : 0.1 mm / h LHN noLHN ETSFBI LHN noLHN threshold : 1.0 mm / h ETS LHN noLHN ETS threshold : 5.0 mm / h threshold : 0.1 mm / h thr. : 0.1 mm / h

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 13 DWD: – LHN switched off in pre-operational trials during winter due to bright band problem – COSMO-DE with LHN operational since April 2007 – too strong LHN forcing due to microphysics changes  grid point search revised – benefit slightly enhanced with new version of LHN (throughout forecast) – assessed benefit from revisions done in 2005 / 2006 to cope with prognostic precip MetCH: – LHN real-time test suite for June – Aug 07 with COSMO-2 using Swiss radar data – verification in comparison to pre-opr. COSMO-2 without LHN – preliminary results (!), evaluate only 18-UTC forecast runs (not affected by exp. set-up error) – positive impact of LHN on surface parameters throughout forecast, particularly for 2-m temperature and cloudiness – very clear positive impact on precipitation in some cases ARPA-SMR: started work on 1DVAR retrievals from rain rates 1.1.1Latent Heat Nudging Klaus Stephan (DWD), Daniel Leuenberger (MCH) Christoph Schraff, Stefan Klink (DWD)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 14 Examples of forecast improvement RadarRadar Ass.No Radar Ass h precipitation forecast ( , UTC) h precipitation forecast ( , UTC) RadarRadar Ass.No Radar Ass. Radar assimilation with LHN at MeteoSwiss

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 15 the problem: the resolution of the radar data has been increased and the SAR method is very sensitive to errors in radial velocity input data  1 year ago: good progress reported, the SAR method worked for single radar data, but now, most of the data pre-processing for the SAR has to be re-tuned or refined –introduce additional control procedures for unfolding the radial velocities (e.g. based on calc. gradient of consecutive radial velocity samples & comparison with Nyquist velocity, or referencing radar data to background wind field if available from a local sounding or analysis cycles etc.) –refine interpolation of radar wind + reflectivity from radar coordinates to cartesian grid –input data: 3 consecutive scans of 3-d reflectivity and radial velocity at 10’-intervals  sensitivity of 3-d wind retrieval (particularly of vertical wind) to errors in input fields: very strong even to low levels of noise in radial velocity (less to reflectivity errors) applying the method to the composite (1x1 km resolution) covering the whole of Poland is not straightforward because of data gaps due to limited doppler range (100 km radius); filling these gaps resulted in the necessity of running the analysis cycle with 1-km resolution. This is done with the ARPS model D Simple Adjoint Wind Retrieval Jerzy Achimowicz (IMGW)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 16 DWD: VAD radar wind profiles: –monitoring performed, 8 out of 16 DWD radars are ok, quality variable –height assignment error will be corrected –neutral to slightly positive impact in assimilation experiments MCH: – Wind Profiler, VAD, SODAR, radiometers: new monitoring tool based on observation increments allows to detect anomalies & potential problems in the way observations are assimilated –VAD soon used passively for regular monitoring 1.1.4Wind Profiles Michael Buchhold (DWD); Oliver Marchand, Christophe Hug (MCH)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 17 GPS tomography: –comprehensive monitoring (14 months) of quasi-operational tomography profiles (at CSCS) against Payerne radiosonde and COSMO fields done  results: tomographic refractivity profiles have rather large errors unless COSMO forecasts are included as background info –start working on assimilating humidity profiles derived from tomography retrievals –new PhD (Perler) at ETH started working on tomography method itself 1.2Multi-Sensor Humidity Analysis (incl. GPS-obs) Daniel Leuenberger (MCH) BIAS – wet bias below 1500 m, large dry bias around 2000 m –Summer: 10 – 15 ppm (~ g/kg) or ~35% –Winter: 5 ppm (~ 0.75 g/kg) or 20% –(much) larger than NWP model (+12h / +24h fc) STD – Summer: up to 12 ppm (~1.8 g/kg) or 10% – 30% in PBL –Winter: up to 7 ppm (~1 g/kg) or 20% – 40% in PBL –slightly smaller than NWP model (+12h / +24h fc)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 18 COSMO-7, + 12-h fc COSMO-7, + 24-h fc GPS tomo GPS tomo, with model constraint BIAS STD 0 UTC Nov + Dec 12 UTC0 UTC July + Aug 12 UTC wet bias at 1000m dry bias around 2000m improved with model c. larger than in model forecasts slightly smaller than in model forecasts improved with model constraintimprove tomography algorithm or do bias correction verification against Payerne radiosonde

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview Assimilation of Screen-level Observations PBL Analysis Jean-Marie Bettems, Oliver Marchand, Andre Walser (MCH), Andrea Rossa + collaborators (ARPA-Veneto), Antonella Sanna (ARPA-Piemonte) main objects: data selection, extrapolation to 10 m, vertical + horizontal structure functions Diploma work at MCH (Lilian Blaser): 9 case studies, standard assimilation parameters –10-m wind ass.: analysis impact: positive at surface, also for upper-air wind speed forecast impact: neutral, except 1 positive case (+8 h) –2-m temperature & humidity additionally (1 convective case): clear positive impact on analysis of surface parameters, negative for upper-air wind speed –surface pressure (1 winter case): slight negative impact on 10-m wind, not due to geostrophic correction –need to select representative stations, need appropriate vertical structure functions (impact of screen-level obs reaching high) up to now: only case studies done

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview Assimilation of Screen-level Observations PBL Analysis Antonella Sanna, M. Milelli, D. Cane, D. Rabuffetti (ARPA-Piemonte) Sensitivity study (1 case with floodings, 2.8 km resolution) on assimilation of non-GTS data and soil moisture initialisation (PREVIEW framework): –clear positive impact from ass of high-res 10-m wind and 2-m temperature data and with nudging parameters adjusted to fit denser obs network –no benefit from replacing IC soil moisture by FEST-WB (hydrological model for floods) 5 June 2002, 12 UTC diurnal cycle T 2m 5 June 2002, 12 UTC - 18-h precipitation sum analysis12-h forecast T -profiles CTRL: interpol. ana SET2: standard nudging SET3: + nudge T 2m, v 10m adjusted parameters SET4: + init. soil moisture

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview Assimilation of Scatterometer Wind Heinz-Werner Bitzer (MetBw), Alexander Cress, Christoph Schraff (DWD) nudging of scatterometer wind data as buoy observations technically implemented, taking into account all quality control / bias correction steps developed for use in GME idealised case studies: model rejects largest part of 10-m wind info unless mass field is explicitly balanced  derive surface pressure analysis correction in geostrophic balance with 10-m wind analysis increments (implies need to solve Poisson equation): implemented, model now accepts data first real case study computed QSCAT 19 June 2007, 6 – 9 UTC 48N 50N 15 W Opr (no QSCAT) – Exp (QSCAT) PMSL 19 June 2007, 9 UTC hPa

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview Assimilation of Scatterometer Wind Heinz-Werner Bitzer (MetBw), Alexander Cress, Christoph Schraff (DWD) m/s 10-m wind gusts analysis (21 June 2007, 12 UTC) + 48-h, no QSCAT+ 48-h, with QSCAT minor impact, central pressure error reduced from – 5 hPa to – 3 hPa

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 23 3D-VAR for HRM: 1.FGAT innovations (for better use of asynoptic data) 2.Increase of DA cycle: 6 -> 3-hourly 3.Increase of DA spatial resolution: 28 -> 14 Km NMC covariances from 6-month T+24 – T+48 forecasts for T, u, v, q, p s little done on EnKF for hybrid 3DVAR-ETKF system, but developing LETKF for testing Use & verification of interpolated 3D-VAR analyses as initial condition for COSMO model implementations: –7-km COSMO-MED:works well, slightly better than ARPA-SMR version with nudging (insufficient explicit large-scale balance in nudging ?) –2.8-km COSMO-ITA:interpolation from 14 Km analysis provides unbalanced I.C. (evident in p s verification, spin-up problems in precipitation) (with nudging, implicit balance by model seems effective)  use nudging for 2.8-km COSMO-ITA 1.73DVAR / EnKF for HRM Massimo Bonavita, Lucio Torrisi, Antonio Vocino (CNMCA)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 24 aim:replace additional model runs by parameterized regressions to the determine the gradient of the cost function in the variational scheme (absolutely required for GME (long term dry drift), welcome for COSMO model) 1.8.1Soil Moisture Initialisation Martin Lange (DWD) Cost function penalizes deviations from observations and initial soil moisture content Analysed soil moisture depends on T 2m forecast error and sensitivity  T 2m /  w

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 25 Sensitivity of 2m temperature on soil moisture (with plants) Assumption: Root density constant with soil depth ! model quantities: known r x : resistances dz k,root : depth of the part of layer k that contains roots tuning parameter  needs to be determined by fitting to training data sets Variation of initial soil moisture at selected grid points in the whole range between plant wilting point and field capacity (for days with radiative conditions) Compare sensitivity of T 2m to soil moisture with parameterisation  Evaluation with Terra-2L 1.8.1Soil Moisture Initialisation Martin Lange (DWD)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 26 All grid points Lhfl (11:00-12:00) > 200 W/m 2 Preliminary studies show good correlation between parameterisation and variational method for radiation conditions in the full range between plant wilting point and field capacity No further need for additional model runs ! dT2m (12:00) / dw 2 (0:00) (variational) dT2m / dw 2 (12:00) (param.) dT2m / dw b (param.) dT2m / dw 2 (variational) Date: tune  so that highest correlation is along diagonal, validate against other data sets (other days) 1.8.1Soil Moisture Initialisation Martin Lange (DWD)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 27 bias T2m, LM domain avg 12:00 15:00rmse T2m, LM domain avg 12:00 15:00 noSMA opr (var SMA) new: param SMA Parameterisation implemented for multi-layer soil model Terra-ml (L1–3, L4–5 are aggregated to top and bottom layer) Model experiment May-June Soil Moisture Initialisation Martin Lange (DWD) even better than operational COSMO-EUslightly better than opr. COSMO-EU parameterisation of soil moisture analysis developed and successfully tested results are comparable or even better than current expensive opr. scheme, differences in soil moisture increments need to be investigated and understood method: efficient and appropriate for all operational models (at DWD)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 28 refinement on scheme for snow mask derived from MSG –validation of MSG snow mask at high resolution (HRV channel) –reduction of time scale to reflect aging of info in / from snow mask (7d  < 1d) –extraction of snow albedo –fractional snow cover derived from MSG, including quality flags, in near-real time at 2 km resolution snow analysis in production for COSMO-7 and for COSMO-2 –improved interpolation scheme implemented, introducing a local dependency of snow depth with height (derived from in-situ observations where their density is high enough) technical and scientific documentation have been written Snow Cover Analysis Jean-Marie Bettems (MCH), M. de Ruyter (ETH)

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 29 Case study : Alps ECMWF snow anaDWD snow anaNew MCH snow ana SLF snow ana (avalanche research) quality flag (white is high), dep on: time of last update (cloud-free pixels) snow mask

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 30 Thank you for your attention

COSMO General Meeting, Athens, 18 – 21 Sept Overview on Data Assimilation WG1 Overview 31 T+12 perturbed forecast T+12 ensemble mean forecast ( - ) + = Transform matrix Control analysis Perturbed analysis 0.9 Pert Pert Pert Pert Pert 5 Ensemble Transform Kalman Filter (ETKF) Slide by Neil Bowler, UK MetOffice

18 cm normalised soil moisture (radar composite area) 0,5 cm Aug Dec COSMO–EU opr: SMA, no LHN COSMO–DE (pre-)op: no SMA, LHN except Jan-Mar COSMO–DE test: LHN Jan – Mar 0,5 cm 18 cm 2 cm and 6 cm soil layers: very similar to 0.5 cm layer

162 cm normalised soil moisture (radar composite area) 54 cm 162 cm 54 cm Aug Dec COSMO–EU opr: SMA, no LHN COSMO–DE (pre-)op: no SMA, LHN except Jan-Mar COSMO–DE test: LHN Jan – Mar

validation of soil moisture at Lindenberg remarkably small errors COSMO–DE Lindenberg Obs

COSMO-7 exceeds COSMO-EU precipitation due to soil moisture initialisation Running monthly mean precipitation and evaporationDaily soil moisture top and bottom layers