CBC 7 Report to June C4. Discussions in Meeting Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan.

Slides:



Advertisements
Similar presentations
1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
Advertisements

Chapter 8: Capacity Building Presented by Co Chair Mr. John Briceño CCAD Central American Countries 11/29/2003.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
© GEO Secretariat OAT CB Building Individual Capacity in Earth Observation Andiswa Mlisa OAT Coordinator CBC-14 Salzburg Austria, Sept 2011.
Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
Group on Earth bservations Group on Earth bservations UR&OSG GEO-4 Tokyo April USER REQUIREMENTS & OUTREACH (UR&O) Progress and Next Steps.
GEO Work Plan Symposium 2011 Days 2 & 3 ID-01 Data Sharing.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
Report from the 7th GEO S&T Committee Meeting Gilles OLLIER – Policy Officer « Earth Observation » EUROPEAN COMMISSION Research Directorate General - Environment.
UIC Report to the GEO-VI Plenary: Accomplishments, Activities, and Recommendations November, 2009 The UIC Co-Chairs Ellsworth LeDrew, IEEE Carsten.
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
IGOS-P 15 and GEO Achievements planning meeting in May 2008 at UNESCO, Paris Report to 4 th C4, 17&
Earth Sciences Sector Canada Centre for Remote Sensing The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Francesco Pignatelli,
Draft Report on STC-7 Geneva 22/23 May Udo Gärtner, co-chair STC.
C4 and EXCOM 12 Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
ADC Meeting Summary Geneva, May 2008 Alessandro Annoni, JRC Jay Pearlman, IEEE Report to Capacity Building Committee May 22, 2008.
4th Committee Co-Chairs Coordination (C4) Meeting Geneva, June 2008 Reflection on the role of the Science and Technology Committee Gilles OLLIER.
GEOSS Monitoring and Evaluation Charles S. Baker (USA) M&E WG Co-Chair Joint meeting of M&E WG and ET January 20, 2010 Geneva, Switzerland 1.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEOSS Common Infrastructure (GCI)
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
GEO Secretariat GEO Capacity Building Workshop on the Role of Remote Sensing in Disaster Management 10 – 12 December 2007, Geneva. Imraan Saloojee GEO.
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
The IGWCO Transition into GEO August 2007 IGWCO Secretariat 7bis, avenue de la paix CH-1211 Geneva 2.
Capacity Building and Developing Countries in GEO (summary of workshop discussions) Hilcea Ferreira INPE-Brazil Andiswa Mlisa GEO Secretariat ( Acknowledgement.
Promoting Awareness & Benefits of GEO EGIDA – WP3.
CB b: Identifying Good Practices, Gaps & Needs.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
Capacity Building Issues ADC-3 Meeting Geneva – 3 March 2007 Errol Levy CBC Co-Chair (European Commission)
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
GEO Work Plan Symposium 2012 ID-01 Advancing the GEOSS Data Sharing Principles.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
GEO ADC meeting, Boulder, Sept Slide # 1 GEO WP – Recommendations on Tasks Management Prepared by: Ivan PETITEVILLE (CEOS, ESA) GEO ADC.
WA Task Report Prepared by Rick Lawford May 29, 2008.
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
Science and Technology Roadmap - current progress 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
Overarching Tasks and Inputs received. OAT and the CB Strategy The objectives outlined in the Capacity Building strategy, therefore, need to be the driver.
Report of the Capacity Building Committee to the ADC-6 meeting.
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Towards a New Phase of GEOSS Implementation : The GEO Work Plan Alexia C. Massacand GEO Work Plan Coordinator
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Foundational Task prioritization: Outcomes of PB meeting
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
AfriGEOSS Initiative: Strengthening Use of EO and Bringing GEOSS to Africa Journey So Far Andiswa Mlisa GEO Secretariat 2nd AfriGEOSS Symposium 13.
GEO Programme Board Report
GEO Capacity Building Coordination Capacity Building in GEO WP 2017 – 2019 Capacity Building Coordination TT GEO Programme Board Meeting 23 – 24 May.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Presentation transcript:

CBC 7 Report to June C4

Discussions in Meeting Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan CB in the Regions

CBC 8 Opportunity for inter-committee coordination 2008 MayJunJulAugSepOctNovDec ADC 19-22, Geneva 21-24, Boulder CBC 3-5, Tashkent 15-17, Athens STC 22-23, Geneva 8-9, Paris UIC 6-8, Toronto 22-24, Boulder C , Geneva 25-26, Boulder ExCom 15-16, Geneva 18, Beijing Plenary 19-20, Beijing 22-24, Boulder

Coordination with Committees - ADC –CB and the GEO Portal: Accepted ADC proposal to establish a joint task team (Alan Edwards, Gordon Bridge, Hilcea Ferreira, Imraan Saloojee) First OB – review existing requirements drafted by CBC Second OB – assess impact –Prioritization of requirements –Feasibility of the current architecture –phasing of requirements –evaluate impact on existing Tasks (and update the GEO wp if necessary) Third OB – start implementation (through existing or new task) –Best Practices Wiki for capturing Good CB practice Hilcea Santos Ferreira Chris Mannaerts –Possible Joint Session in Boulder

Coordination with Committees - UIC US –Linkage with determining CB needs (CB0701b) –UNECA contribute to user requirements in Africa Potential UIC call for participation –Identification of projects provides a linkage with donor engagement task Develop CB requirements from IGOS Theme Reports COPs as a vehicle to determine CB needs Joint Session in Boulder – would require planning between co chairs

GCI and CB IOC Task Force and CBC: Hilcea Santos Ferreira, Gordon Bridge, Alan Edwards CBC members identifying test cases in each GEO region to provide specific user feedback on portal usability e.g. Kenyan Wildlife Services

Work Plan Progress Task progressing well –Most will continue into next work plan –Excellent Progress made with Chlorogin (POGO, EC0607), Building National Capacity (UNEP, CB0701d), Open Source (CB0701e) –Recurring theme: resources for task implementation Resource Mobilisation –Identification of showcase projects from current tasks –Possible Meetings with Resource Providers Task Sheets –Addition of capacity building info Box

2009 – 2011 Workplan: CB Overarching themes/Tasks (OAT) Resource mobilization Promoting education, training and certification (Build Individual Capacity to use EO) Strengthening and building networks (Build Institutional Capacity to use EO) Advancing Earth Observation through infrastructure development (Build Earth Observation capacity through technology transfer) Outreach and institutional reinforcement (Continuous Needs/Gap Assessment)

OAT and the CB Strategy The objectives outlined in the Capacity Building strategy, therefore, need to be the driver of the Work Plan Capacity Building activities The Work Plan should include, realign and possibly redefine priority actions identified in the strategy The Work Plan should address the I3 of Capacity Building namely Infrastructure, Institutional and Individual The current Work Plan largely focuses on developing the cross- cutting dimension of capacity building; a bigger focus is required in the Work Plan, through sub-tasks, on developing societal-benefit-area specific capacity building activities

OAT and current tasks Resource mobilization CB0701a Promoting education, training and certification CB0801; AG0607; WE0605 Strengthening and building networks EC0607; CB0701d; CB0702(will this end in 08 ?) Advancing Earth observation through infrastructure development CB0701e; WA0607; CB0604 Outreach and institutional reinforcement CB0701b; CB0701c;

OAT and suggestions from CBC6 + GEOSec Call Resource mobilization FP7 - establishing a Capacity Building advisory capability in support of Earth Observation (EO) activities Promoting education, training and certification Build Individual Capacity to use EO GMOSS summer schools; GEONETCast training channel GEOBON; ForrestMonitor IRI /Gmoss Summer School Strengthening and building networks Build Institutional Capacity to use EO Implementing CBERS GEO CB Network; Advancing Earth observation through infrastructure development Build Earth Observation capacity through infrastructure development & technology transfer CBERS, SERVIR Africa, Outreach and institutional reinforcement CB Portal; Games Contest User Oriented workshops for GEOSS outreach and feedback

Recommendations to C4 and Excom Promote the identification of CB contact points in GEO Caucuses Proposal to reduce number of committee meetings to 2 –Implications for task sheet updates