Global Design Effort - CFS 07-01-09 ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview.

Slides:



Advertisements
Similar presentations
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
Advertisements

Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
1 STATUS REPORT JINR G. Shirkov, ILCW08, November 17, 2008.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
CERN, February 25, 2010 ILC-HiGrade Annual Meeting Global Design Effort 1 ILC-HiGrade Scientific and Annual Mtng CERN · Geneva, Switzerland February 25,
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
Global Group 4 – Conventional Facilities and Siting V. Kuchler1 of 17 Fermilab R&D Meeting Fermilab R&D Meeting Vic Kuchler Conventional Facilities.
LCFOA Meeting at SLAC Linear Collider Forum of the Americas 1 LINEAR COLLIDER FORUM OF THE AMERICAS CONVENTIONAL FACILITIES OVERVIEW Victor R. Kuchler.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas CFS AD&I Status Report Conventional.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
WBS x.11 Conventional Facilities Americas Region ILC Fermilab ART Meeting1 Conventional Facilities and Siting Global Group Americas Region FY.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
Conventional Facilities and Siting Global Group Global Design Effort CFS EDR Kick-Off Mtg, FNAL Aug 22 – 24, CFS EDR FNAL Kick-Off Planning.
1 of 5 CONVENTIONAL FACILITIES & SITING GROUP PROGRESS OVERVIEW J.L. Baldy, A. Enomoto, V. Kuchler V. KUCHLER GDE Executive Committee Meeting
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Summary: Site Discussion Jonathan Dorfan SLAC Plenary Session, June 6, 2008.
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update December.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
AWLC14 - FERMILAB May 12-16, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, A Enomoto, J Osborne.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Conventional Facilities and Siting Global Group (ARCFS)
Conventional Facility & Siting (CF&S) Overview for the Positron Source
LCWS11 AWG9 PARALLEL SESSION SUMMARY
CLIC / ILC Collaboration for CFS works
AMERICAN LINEAR COLIDER PHYSICS GROUP Impressions of the Dubna Site
ILC GLOBAL SYSTEMS MEETING
Conventional Facilities and Siting Global Group (CFS) SLAC Update December 10, 2007 Acknowledgment: Jerry Aarons, Clay Corvin, and Esther Kweon Fred Asiri.
JLEIC Accelerator R&D Meeting
Presentation transcript:

Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP Status and Overview V. Kuchler, J. Osborne, A. Enomoto

Global Design Effort - CFS ILC Global Systems Meeting 2 Current CFS Efforts Accelerator Integration and Design is a Major Focus of Current Effort Accelerator Integration and Design is a Major Focus of Current Effort Main Linac Tunnel Configuration Alternative Study Main Linac Tunnel Configuration Alternative Study Proposed Dubna Site Soil Boring Report Analysis and Planning for Additional Preliminary Design Efforts Proposed Dubna Site Soil Boring Report Analysis and Planning for Additional Preliminary Design Efforts Rapid Excavation and Tunneling Conference Rapid Excavation and Tunneling Conference

Global Design Effort - CFS ILC Global Systems Meeting 3 Accelerator Integration and Design Coordination and Status Meeting was Held at DESY on May 28 & 29 Coordination and Status Meeting was Held at DESY on May 28 & 29 All Area Systems Provided a Status Report with Respect to the Accelerator Integration and Design Effort All Area Systems Provided a Status Report with Respect to the Accelerator Integration and Design Effort  Current Design Status and Similarities/Differences from RDR Criteria  Revised Area System Designs are in Varying Degrees of Maturity  There are Some Dependencies for Criteria Development Between the Area Systems CFS Video/Webex Meetings will be Used to Meet with Individual Are System Representatives CFS Video/Webex Meetings will be Used to Meet with Individual Are System Representatives A Meeting will be Held at SLAC on July 20 &21 to Develop, with Area System Input, a Preliminary Overall CFS Machine Layout A Meeting will be Held at SLAC on July 20 &21 to Develop, with Area System Input, a Preliminary Overall CFS Machine Layout

Global Design Effort - CFS ILC Global Systems Meeting 4 Main Linac Tunnel Configuration Study FESS Engineering Support has Been Provided to Continue This Effort FESS Engineering Support has Been Provided to Continue This Effort Hanson Engineering is Now Under Contract to Support This Effort Hanson Engineering is Now Under Contract to Support This Effort Work is Continuing and is Scheduled to be Completed in Time for the September GDE Meeting Work is Continuing and is Scheduled to be Completed in Time for the September GDE Meeting If Funding is Provided, JINR Will Provide Input for This Study for Near Surface Enclosure Alternatives If Funding is Provided, JINR Will Provide Input for This Study for Near Surface Enclosure Alternatives

Global Design Effort - CFS ILC Global Systems Meeting 5 Dubna Site Soil Boring Report Meeting was Held at DESY on June 25 & 26 Meeting was Held at DESY on June 25 & 26 JINR and GSPI Representatives Attended the Meeting JINR and GSPI Representatives Attended the Meeting The Soil Boring Report has been Partially Translated into and English Version The Soil Boring Report has been Partially Translated into and English Version A Written Report will be Generated to Record the Results of the Meeting and Future Plans for JINR/GSPI Efforts for Continued CFS Preliminary Design for the Dubna Site A Written Report will be Generated to Record the Results of the Meeting and Future Plans for JINR/GSPI Efforts for Continued CFS Preliminary Design for the Dubna Site

Global Design Effort - CFS ILC Global Systems Meeting 6

Global Design Effort - CFS ILC Global Systems Meeting 7

Global Design Effort - CFS ILC Global Systems Meeting 8 Rapid Excavation and Tunneling Conference Held Every Two Years and International in Nature Held Every Two Years and International in Nature Papers are Presented Describing Underground and Tunneling Projects Worldwide Papers are Presented Describing Underground and Tunneling Projects Worldwide  Transportation Tunnels for Auto and Train Traffic  Hydroelectric Generation  Potable Water Distribution for both Drinking and Irrigation  Micro Tunneling for Utility and Infrastructure Distribution  Construction Methods for Shaft, Tunnel and Caverns  Geotechnical Investigation Methods  Project Management Techniques Sponsor Display Area Provides Opportunities for Interaction with Equipment Manufacturers and Product and Service Companies Sponsor Display Area Provides Opportunities for Interaction with Equipment Manufacturers and Product and Service Companies