Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008.

Slides:



Advertisements
Similar presentations
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
Advertisements

GEOSS Architecture Implementation Pilot Water Information Services with GEOSS Interoperability Arrangements George Percivall Open Geospatial Consortium.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
CBC 7 Report to June C4. Discussions in Meeting Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
AR – Issues for Attention Tactical and Strategic Guidance documents – what is the agreed approval/ publication process? –Strategic Guidance will.
Work Plan Development Guidelines and Schedule.
UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
SIF Status to ADC Co-Chairs
Core Task Status, AR Doug Nebert September 21, 2008.
Standards and Interoperability Forum: Status, Issues & Plans GEO Architecture and Data Committee Kyoto, Japan 9 February 2009 Siri-Jodha Singh Khalsa.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
Report: GEOSS Common Infrastructure (GCI) Co-ordination team (CT) Alan Edwards Transitional Co-chair (European Commission) On behalf of the GCI-CT 18 th.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
C4 and EXCOM 12 Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
GEOSS Data Sharing Principles Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
ADC Meeting Summary Geneva, May 2008 Alessandro Annoni, JRC Jay Pearlman, IEEE Report to Capacity Building Committee May 22, 2008.
GEOSS Monitoring and Evaluation Charles S. Baker (USA) M&E WG Co-Chair Joint meeting of M&E WG and ET January 20, 2010 Geneva, Switzerland 1.
GEOSS Common Infrastructure (GCI)
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to GEO Committees February 2008.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
Architecture Priorities. Why do stakeholders perceive that the architecture does not meet needs? Users are not seeing what they expect The interaction.
Architecture and Data Management Strategy (Action Plan) Ivan 1 DeLoatch, USGS, ADC Co-chair Alessandro Annoni, EC, ADC Co-chair Jay Pearlman, IEEE, ADC.
GEOSS Common Infrastructure: A practical tour Doug Nebert U.S. Geological Survey September 2008.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to ADC Committee May 21, 2008.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
ID-01 report 17 September 2014 IDIB meeting, Enschede Michel Schouppe
Alan Edwards European Commission & GEOSS Data Sharing Task Force Co-Chair 5 th GEO Project Workshop London, UK 8-9 February 2011 The GEOSS Data Sharing.
GEO Architecture and Data Committee Task AR Architecture Implementation Pilot George Percivall Open Geospatial Consortium GEO Task AR Point.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
AIP-2 Kickoff Workshop End-to-end use case: Discovery, access, and use with variations Doug Nebert GEOSS AIP-2 Kickoff September 2008.
ENV proposal meeting, Geneva, Sep. 24, GCI Presentation Joost van Bemmelen, ESA
GEOSS Common Infrastructure Internal Structure and Standards Steven F. Browdy (IEEE)
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
WGISS-40, Harwell, Oxfordshire, UK, Sept. 28-Oct. 2, 2015 GEO/CWIC Interactions Ken McDonald/NOAA CWIC Session, WGISS–40 October 1, 2015.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Initial Operating Capability Task Force (IOCTF) Status Briefing September 21, 2008.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
GEO Standards and Interoperability Forum SIF First Organizational Meeting 27 July 2007 Barcelona, Spain.
Report of the Architecture and Data Committee (ADC) R.Shibasaki (ADC, Japan)
Task XX-0X Task ID-01 GEO Work Plan Symposium April 2014 Task ID-01 “ Advancing GEOSS Data Sharing Principles” Experiences related to data sharing.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Core Task Status, AR Doug Nebert September 22, 2008.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
Implementing GEOSS architecture with-and-for Users George Percivall Open Geospatial Consortium Task lead AR-09-01B.
GEOSS Common Infrastructure Access to Priority Earth Observations Data “ Sprint to Plenary” Group on Earth Observations Eighth Plenary Session - GEO-VIII.
ISWG / SIF / GEOSS OOSSIW - November, 2008 GEOSS “Interoperability” Steven F. Browdy (ISWG, SIF, SCC)
ISWG / SIF / GEOSS OOS - August, 2008 GEOSS Interoperability Steven F. Browdy (ISWG, SIF, SCC)
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 AR Interface implementations for GEOSS George Percivall
GEOSS Common Infrastructure Slides prepared by Alessandro Annoni, JRC Jay Pearlman, IEEE and GEO Secretariat.
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
Introduction to the GEOSS Registries: Components, Services, and Standards Doug Nebert U.S. Federal Geographic Data Committee June 2007.
CEOS Response to GEOSS Water Strategy
ESA-FAO GEOPortal STATUS & PLANS
Report: GEOSS Common Infrastructure (GCI) Co-ordination team (CT) Alan Edwards Transitional Co-chair (European Commission) On behalf of the GCI-CT 18th.
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
GEOSS Data Sharing Principles
Core Task Status, AR Doug Nebert September 22, 2008.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
GEOSS Future Products Workshop March 26-28, 2013 NOAA
Air Quality Data Systems and the GEOSS Architecture
Presentation transcript:

Report of the Architecture and Data Committee (ADC) for the C4 Meeting Ivan B. DeLoatch, ADC Co-chair June 2008

ADC Co-Chairs Meeting, 19 & 22 May Coordination with other committees –UIC wishes to improve their participation in process; need to strengthen committee interaction –Desire to not add many new tasks to plan –All tasks need a strong POC and leads Report on last C4 Meeting Report on latest ExCom Meeting GEO Portal (GCI) Process –ExCom requirements include: higher level document, decision on evaluation phase beginning and length –Task Force oversees IOC phase process to yield a report to be used for understanding the baseline of GCI and its operation –Kick-off May(June), mid-term review October 2008, final review within a year –ADC chairs recommend immediate preparation of Terms of Reference for the Task Force

Recommendations for IOC Task Force TOR Objective: Provide an evaluation of and recommendations for the GEOSS Common Infrastructure (GCI) to the Executive Committee and its desired functionalities towards long term support, sustainability and concept of operations for GEOSS ADC recommends evaluation should be based on: –User feedback and outcomes from the Tasks –Existing work –GCIs link with registered Components (information systems) –Interactions with GCI IOC participants and service providers

IOC Task Force TOR, continued ADC Co-Chairs identified the following key technical issues to be addressed with regard to GCI components: –Long-term cost implications –Possible contractual requirements –GCI core systems operations, maintenance (hardware/software and telecommunications) and extensibility –Proprietary versus open source software concerns –Single versus multiple portals and clearinghouses –Access procedures –User interface conventions –User community requirements –Other issues when and as appropriate

IOC Task Force, continued The Task Force should select a Chairman for the duration of the IOC Mid-term and Final Reports should be submitted to the Executive Committee ADC nominees for IOC Task Force: –Alessandro Annoni (European Commission) –Ivan DeLoatch (United States) –Jay Pearlman (IEEE) –Ivan Petiteville (CEOS) –Ryosuke Shibasaki (Japan)

Request from ADC At the C4 meeting, update/report on GEONETCAST is requested to include information about usage patterns and volume (Michael Williams to provide)

User Requirements Registry Being established by UIC in technical consultation with the ADC members Will store information about user types and their requirements for specific observations (quality, method, frequency, resolution, etc.) Intended to be matched with existing observation information registered with GEOSS to identify either popularity or gaps in availability Discussion points on governance: –How should entries be collected/loaded? –Who should be responsible for this process? –How open/controlled should the system be? –What quality or consistency controls should be expected?

Capacity Building Portal The Capacity Building Committee requested support from the ADC to formulate and integrate a capacity building portal within the structure of the GCI. The virtual portal brings to the user capacity building tools and information relevent to the search being conducted in the GEOPortal. ADC and CBC are establishing a joint working team to refine the requirements and develop implementation options for review by the committees. For ADC, the team will be lead by AR (George Percival). Briefings of recommendations are expected at the September committee meetings.

Best Practices Wiki Rather than a Registry, the wiki environment was recommended by the ADC as a host for the documentation of best practices and methods within GEOSS IEEE is operating this GEOSS resource, available online now (wiki.ieee-earth.org)

Status of Invitations to Collaborate In June, the GEO Secretariat distributed a general request to the membership to register Component systems and Services with the GEOSS Registries –Critical to building up sufficient resources to make GEOSS a credible capability –Critical in providing operational experience in the operation and use of the Registries GEOSec also issued an invitation for collaboration in an Initial Operating Capability phase of GEOSS for the coming year, focused on the establishment of an IOC Task Force composed of members from all GEO Committees

Status of Key ADC Documents GEOSS Strategic Guidance and Tactical Guidance documents are now available through the GEO website, as linked from the home page registration link The Tactical Guidance Document will be updated to reflect evolving developments in the GCI and the GEOSS practices

Task-Level GEOSS Roadmap Graphical presentation of the relationship of various GEO Tasks to one another with respect to time and shared outputs/inputs Proposals from the UIC-ADC regarding the Roadmap were: –Harmonize with Outcome Performance Indicators proposed by US and Canada –Participate in Outcome Performance Indicators workshop in Europe. –Identify a POC from UIC for further coordination on the Roadmap.

Data Sharing Principles Following the update of the White Paper and the draft implementation guidelines for Data Sharing in GEOSS, an implementation strategy is being developed. The White Paper will be sent to GEO Principals for expert feedback from Members and Participating Organizations. Agreement on the adoption of the Data Sharing Principles is anticipated at or before the 2009 GEO Plenary

Architecture Task Information Sensor Web workshop hosted in Geneva prior to ADC meeting. Main case studies have dealt with flood and fire with a demonstration capability planned by end of the year Architecture Implementation Pilot (AIP) is proceeding with a Phase 2 activity with a focus on registering and integrating high-quality, high-availability sustainable EO services –Call for participation (July 2008) –Kick-off meeting (Sept , Boulder CO) –Interim reporting (November 2008, Beijing) –Wrap-up (February 2009)

Architecture Task Information cont. AR oversees the primary, operational architecture for the GEOSS Common Infrastructure (GCI). These include: –Registries (Standards, Special Interoperability Arrangements, Component, Services, User Requirements) –Web Portal –Best Practices Wiki A high level of interaction with the IOC Phase activities, IOC Task Force, and the Architecture Implementation Pilot is anticipated Standards and Interoperability Forum (SIF) has been meeting regularly to process standards nominations to the Registry system

Other Items September Meeting of ADC will be in Boulder. Within the same week are ADC, CBC, UIC, C4 the AIP and CEOS WGISS. Schedule and meeting information is available on the web. Stronger inter-committee coordination is recommended through more frequent telephonic meetings of the C4 with the agenda being issues driven. A continued public outreach is necessary to build the inventories in the registries. Branding implications of GEOSS remain an unresolved issue.

GEO Meetings in Boulder, Colorado ADC (co-chairs and full) UIC C4 CEOS WGISS Architecture Implementation Pilot Kick- Off Meeting

Questions ?????