International Federation of Consulting Engineers

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Overview and Short Comparison between FIDIC’s Red Book & New Red Book
Contracts – important issues
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
FIDIC Workshop WS 12, Beijing Conference
CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS ( ) (FEB 2007)
WELCOME TO THE INDUSTRIAL COMMISSION SELF-INSURANCE SEMINAR.
Security of Payment workshop Andrew Robertson Important Disclaimer: The material contained in this publication is comment of a general nature only and.
Subcontractors بسم الله الرحمن الرحيم Islamic university in Gaza Collage of Engineering Postgraduate program Construction Management Prepared by: Eng.
Dr. Lic. Herfried Wöss, LL.M. (Exeter), MCIArb. © The relationship between Arbitration and the Dispute Adjudication Board under the FIDIC Silver Book (EPCT)
Completion Outstanding work and Remedying Defects In order that the Works and Contractor's Documents, and each Section, shall be in the condition required.
International Federation of Consulting Engineers Evgeny Smirnov European Bank for Reconstruction and Development.
The use of FIDIC Contracts and Agreements in the Nordic market Kaj Möller (SWE), FIDIC Exec. Committee member 2011 – Liaison with the FIDIC Contracts.
International Federation of Consulting Engineers
International Federation of Consulting Engineers Speaker:Sarwono Hardjomuljadi Dr, Ir, MSc, MSBA, MPA, MDRBF, MDBF, ACIArb, ACPE Special Adviser to the.
International Federation of Consulting Engineers Session 10: Integrity/Corruption Dr. Jorge Díaz Padilla.
International Federation of Consulting Engineers Speaker:Sarwono Hardjomuljadi Dr, Ir, MSc, MSBA, MPA, MDBF, ACIArb, ACPE Special Adviser to the Minister.
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
Contractor Management and ISO 14001:2004
Time for a new standard - AS General Conditions of Contract
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT 20. Claim, Disputes and Arbitration [Construction Contract Administration]
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
LOGO October The Employer FIDIC 1999 dasdas Supervisor: Dr.Kamalain shaath Done by: Mahmoud Abu Kmail Construction Contract Administration ENGC.
CONSTRUCTION CONTRACTS DOCUEMENTS
“Lessons Learnt” workshop on 18 th June 2015, Sofia Project Implementation Support Service Agreement (PISSA) TA BG BSF S1 – Procurement & FIDIC.
The international contract of the purchase and sale
CURRENT PROPOSALS FOR FURTHER INTRODUCTION OF DISPUTE BOARDS WITHIN THE CONSTRUCTION INDUSTRY IN ROMANIA.
International Federation of Consulting Engineers FIDIC FIDIC Contracts and Infrastructure Development Athens, 28 March 2012 Dr William Godwin Barrister,
Contract price & payment
CH1 INTERNATIONAL TRADE CONTRACTS
تقديم وسائل تسوية المنازعات Presentation of dispute settlement means.
International Federation of Consulting Engineers Yukinobu Hayashi Association of Japanese Consulting Engineers (AJCE) Nippon Koei Co., Ltd.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Key Provisions in Standard Contract Conditions Presented by Simeon A. Sahaydachny Kyiv, 20 April
Date: 16 April 2010 Adapting FIDIC Standard Forms for Local Conditions and Regulations TCDPAP Annual Conference - '‘New Approaches and Solutions for Consultancy.
Copenhagen, 5th March 2009 dansk byggeri - Export Section1 By Frank Kehlenbach Director of EIC.
Center of Islamic Finance COMSATS Institute of Information Technology Lahore Campus 1 Adopted from open source lecture of Meezan Bank. Customized for best.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT – 4123/EN Supply, Replacement and Repair of Crane Rails.
Law and Administrative Rule Updates. To cover: Statutes Rules –Certified Negotiator –Confidential Information –Other Changes to 60A-1.
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
CONSTRUCTION CONTRACTS DOCUEMENTS
Energy for the Future Belene Nuclear Power Plant Project Status.
1 General Issues in International Construction. Summary: 1 International Performance Characteristics (lecture 19 and Appendix 7). 2 International Contracts.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Rhonda Anderson, RHIA, President  …is a PROCESS, not a PROJECT 2.
FIDIC guidelines for EPC / Turn Key System of Contracting
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
By Khalil T. Hasan Construction Solutions ( Joint Operation/Administration of multiple FIDIC Forms – A Case Study.
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
EFCA Annual Conference 2016, 02–04 June 2016, Sofia, Bulgaria Application of FIDIC CC for EU- Funded Projects in Bulgaria Assen Antov Transport Engineer.
Procurement and Contract Management Training
Introduction to FIDIC - Manuals
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Particular Conditions of Contract & Appendix to Tender
WORLD BANK Harmonized SBD-Works
Drawings Introduction to FIDIC - Drawings -.
INTERCONNECTION GUIDELINES
Particular Conditions of Contract & Appendix to Tender
International Federation of Consulting Engineers
Red Flags Rule An Introduction County College of Morris
THE EMPLOYER Right, of access to the site.
International Federation of Consulting Engineers
International Federation of Consulting Engineers
Construction Contract Administration
Presentation transcript:

International Federation of Consulting Engineers Speaker: Frank Kehlenbach (Director of EIC)

The EIC Contractor‘s Guides EIC Contractor‘s Guides on the FIDIC „New Books“ were produced between 2000 and 2003 and the EIC Guide on the DBO Contract in 2009. The EIC Guide on the “MDB Harmonised Construction Contract” was published in April 2011. March 2000 March 2002 March 2003 May 2009 April 2011 2 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

The EIC Contractor‘s Guides International Construction Law Review, October 2011 (Introduction) They [the EIC Contractor’s Guides] are valuable as they are the product of a responsible and reputable international organisation. They also through a light on the approaches to be adopted in drafting international construction contracts... As in the past, EIC’s comments are balanced. They indicate what it regards as improvements and what it believes to be retrogressions. 3 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

EIC acknowledges that there are no more deviations between FIDIC MDB 2010 and the World Bank’s GCC March 2012 Sub-Clause 1.1.6.10 [Notice of Dissatisfaction] This definition is only to be found in FIDIC-MDB, not in WB-GCC Sub-Clause 1.15 [Inspections and Audit by the Bank] WB-GCC adds 2nd sentence with reference to Sub-Clause 15.6 Sub-Clauses 4.2 [Performance Security], 14.2 [Advance Payment] and 14.9 [ Payment of Retention Money] FIDIC allows Contractor to select “reputable” financial institution, WB-GCC insists on “an entity and from within a country... approved by the Employer” Sub-Clause 15.6 [Corrupt or Fraudulent Practices] FIDIC-MDB requires that Employer’s determination is based on “reasonable evidence”, WB-GCC refers to Contractor and/or also “any of its personnel, agents, Subcontractors, subconsultants, services providers, suppliers and/or employees” Sub-Clause 20.6 [Arbitration] FIDIC-MDB refers to ICC Rules as the 3rd and last option, WB-GCC only refers to Contract Data as 1st option and UNCITRAL Rules as 2nd option Saturday, 22 April 2017 4 MDB Harmonized Contract Conference 2012

New provisions / titles in the FIDIC MDB Edition Sub-Clause 1.15 [Inspections and Audit by the Bank] Sub-Clauses 6.12 – 6.24 [Social Clauses] Sub-Clause 15.6 [Corrupt or Fraudulent Practices] Sub-Clause 17.7 [Use of Employer’s Accommodation / Facilities] Sub-Clause 15.5 [Employer’s Entitlement to Termination for Convenience] Sub-Clause 19.7 [Release from Performance under Law] Sub-Clauses 20.2 et sqq. [Appointment of the Dispute Adjudication Board] 5 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

Improvements on FIDIC 1999 Editions The MDB Harmonised Construction Contract accommodates some comments of the EIC Contractor’s Guides, such as Rate of profit is pegged at 5% of the Cost Both parties are required to keep the contract details confidential Obtaining building permit is responsibility of the Employer 28-days notification period applies also to Employer’s Claims Time limit for Engineer’s determination is 28 days Employer shall provide the necessary special or temporary rights-of-way Introduction of „pay-when-paid“ clause re. Nominated Subcontractor 6 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

Improvements on FIDIC 1999 Editions The MDB Harmonised Construction Contract accommodates some comments of the EIC Contractor’s Guides, such as Ownership of Plant & Material has been revised Commencement of the Works only upon fulfilment of certain conditions precedent Additional right to refuse a Variation (“economic imbalance”) Repayment deduction does not commence until 30% of the Accepted Contract Amount less Provisional Sums has been certified DAB can be activated if the Engineer fails to respond within deadline 7 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

EIC criticism towards FIDIC 2010 MDB Harmonised Contract The MDB Harmonised Construction Contract has also introduced some problematic concepts with regard to: Role of the Engineer Employer has now an unilateral right to change authority of and to replace the Engineer No authority to agree or determine extension of time Limited authority to instruct a Variation No authority to approve a Variation submitted by Contractor No authority to specify the amount payable in each of the applicable currencies Whilst these provisions are understandable from the Employer’s perspective, these limitations can lead to difficulties in practice 8 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

EIC criticism towards FIDIC 2010 MDB Harmonised Contract The MDB Harmonised Construction Contract has also introduced some problematic concepts with regard to: Performance Security Employer has now a discretionary right to make a claim Corrupt and Fraudulent Practices Employer has now an unilateral right to terminate the Contract Limitation of Liability is watered down compared to the FIDIC 1999 forms and includes now a reference to Sub-Clause 15.4 [Payment after Termination] International Arbitration The arbitration clause distinguishes between “foreign contractors” (international arbitration applies) and “domestic contractors“ 9 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

Conclusion: A positive outlook EIC welcomes the various technical improvements introduced by FIDIC and the MDBs which make the FIDIC 2010 MDB Harmonised Contract Edition a more balanced contract than the two precursors in 2005 and 2006 Users should, however, be very conscious that MDB Sub-Clauses 3.1, 3.4, 4.2, 17.6 and 20.6 (and the new Sub-Clause 15.6) deviate significantly from the FIDIC 1999 “Red Book” standard and may represent an opportunity for abusive behaviour towards the Contractor EIC is prepared to join forces with FIDIC and EFCA in order to make the 2010 version a truly “harmonised” FIDIC MDB Edition which is also used by the European Commission and other European bilateral donor agencies 10 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

EIC Contact Address: EIC Secretariat Kurfuerstenstrasse 129, D - 10785 Berlin, Germany Phone: ++49 (0)30 /21286-244 Fax: ++49 (0)30 /21286-285 E-mail: eicontractors@compuserve.com Internet: www.eicontractors.de 11 Saturday, 22 April 2017 MDB Harmonized Contract Conference 2012

International Federation of Consulting Engineers President Geoff French, UK Vice-President Pablo Bueno, Spain Secretariat FIDIC World Trade Center 2 Geneva Airport Box 311 CH-1215 Geneva 15 Switzerland Tel: +41 22 799 49 00 Fax: +41 22 799 49 01 fidic@fidic.org www.fidic.org Managing Director Enrico Vink