GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights.

Slides:



Advertisements
Similar presentations
CBC 7 Report to June C4. Discussions in Meeting Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan.
Advertisements

Overview of Capacity Building Committee Activities GEO Capacity Building Committee Meeting Brussels – 14 September 2006 Errol Levy DG Research – European.
DS-01 Disaster Risk Reduction and Early Warning Definition
GEO Work Plan Symposium 2011 Global Biodiversity Observation (DS-14)
GEO Work Plan Symposium 2011 Day 3 DS-11 Global Forest Observation.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
27 September, 2004 GEO Special Session on Governance Analysis of Comments on Governance of GEOSS International Cooperation Subgroup Co-Chairs Patricio.
GEO Work Plan Symposium 2011 Task DS – 13 Global Ecosystems Monitoring.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
Report from the 7th GEO S&T Committee Meeting Gilles OLLIER – Policy Officer « Earth Observation » EUROPEAN COMMISSION Research Directorate General - Environment.
The GEOSS Science and Technology Stakeholder Network: A spin-off of the EGIDA Project Hans-Peter Plag, Ian McCallum, Steffen Fritz, Shelley Jules-Plag,
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
UIC Report to the GEO-VI Plenary: Accomplishments, Activities, and Recommendations November, 2009 The UIC Co-Chairs Ellsworth LeDrew, IEEE Carsten.
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
IGOS-P 15 and GEO Achievements planning meeting in May 2008 at UNESCO, Paris Report to 4 th C4, 17&
GEO Forest Observation Community of Practice: Identifying Critical Earth Observations Michael Brady, Canadian Forest Service/GOFC-GOLD GEO User Interface.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
GEO Work Plan Symposium 2011 Days 2 & 3 DS-04 - Oceans.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
GEO Work Plan Societal Benefit Areas tasks Report from Brainstorming session GEO European Projects Workshop 3-4 September, 2008 Brussels, Belgium.
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
IGOS Water Cycle Theme CEOP Science Goal Predictability Improvement: Regional Water Cycle Variability & its Impacts on Water Resources under the Same Global.
Preface Foreword Executive Summary 1. The Cryosphere Theme 2. Applications of Cryospheric Data 3. Terrestrial Snow 4. Sea Ice 5. Lake and River Ice 6.
World Climate Research Programme Participation of WCRP (and GCOS) in GEO G.Sommeria.
Introduction to Breakout Session 2.2 Essential Variables for GEO SBAs (Chair: Antonio Bombelli) Coordinator of the GEO Task CL-02 “Global Carbon Observations.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
The Group on Earth Observations (GEO) 2015 Work Plan Symposium Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 5 May 2015.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
© GEO Secretariat IGWCO UNESCO CEOS GEOWOW Univ. of Tokyo GEOSS African Water Cycle Coordination Initiative and Capacity Development.
1 ID-03 Science and Technology in GEOSS C1 Engaging the Science and Technology (S&T) Community in GEOSS Implementation Hans-Peter Plag IEEE.
Water resources at the IAEA and some recent initiatives.
IGCP 565: The workshop series and recommendations Hans-Peter Plag Nevada Bureau of Mines and Geology and Seismological Laboratory, University of Nevada,
IGOS Symposium Programme Committee Telecon
Slide # 1 “Task-level GEOSS Roadmap” Chu Ishida, JAXA Yoichi Nakamura, Mitsubishi Research Institute, Inc. Feb. 6-7, 2008 ADC Full Committee Meeting #6.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
STATUS REPORT ON WA TASK DESCRIPTION: “Organize workshops on water observations, encompassing space-based, airborne, and in-situ observing systems,
Third IGOS Cryosphere Workshop October 2006 Noordwijk, The Netherlands Sponsored by:
The Components of the Water Task (Linkages and Performance Indicators)
What is GEO? launched in response to calls for action by the 2002 World Summit on Sustainable Development, Earth Observation Summits, and by the G8 (Group.
Climate and Cryosphere (CliC): Legacy for 2013 and Beyond Jeff Key NOAA/NESDIS Chair, CliC Observation and Products Panel (Agenda item )
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
GEO ADC Co-Chair meeting, Tokyo, Japan, 13 May 2007 Slide # 1 Cross-GEO Coordination Report of C4 Meeting and follow-up discussion Ivan Petiteville, CEOS.
GEO 2014 Work Plan Symposium Opening Remarks Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 28 April 2014.
WA-06-05:  Title: Initiate the creation of a coordination mechanism within GEO for global in-situ water observations, including ocean observations, and.
Report of the Capacity Building Committee. Capacity Building Strategy in GEO. An integrated approach based in three complementary elements: Infrastructure.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda 11 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th –
© GEO Secretariat Collaboration with Partner Organizations – GEO/GEOSS ICG-WIGOS Geneva, Switzerland 18 March 2013 Barbara J. Ryan Director, GEO Secretariat.
WA Task Report Prepared by Rick Lawford Presented by Ted Engman February 13, 2008.
WA Task Report Prepared by Rick Lawford May 29, 2008.
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
Earth Observation Summit 2003 NOAA Science Advisory Board Gregory W. Withee Assistant Administrator for Satellite and Information Services March 18, 2003.
Report of the Capacity Building Committee to the ADC-6 meeting.
Group on Earth Observations (GEO) Cold Regions Work Plan Item WA-01-C3 Barbara J. Ryan Secretariat Director Lanzhou, China 13 March 2013 EC Panel of Experts.
CEOS Response to GEOSS Water Strategy
The GEOSS Water Strategy
The Group on Earth Observation The water related activities Vanessa Aellen Technical Expert for Water 16 may 2017, Tuscaloosa.
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
IGWCO CoP Overview Richard Lawford
Links with GEO.
EV Workshop, June 11-12, 2015, Bari, Italy
Freshwater from Space Discussion -Next Steps
Presentation transcript:

GEO Work Plan Symposium 2011 Days 2 DS-05 Highlights

DS-05 Integrated Water-cycle Information Definition Develop an operational and sustained global network of in-situ observation sites. Increase the availability of information products and services for monitoring changes in the water cycle, including clouds and precipitation, appropriate for both research and integrated water resource management. Increase the availability of data and information, including quantity and quality of both surface and groundwater, to support a water cycle decision making system. Develop routine, reliable production of watershed and human health indicators from satellite data, surface and subsurface data, and data assimilation capabilities (Water Target) Increase knowledge of environmental flow requirements of river baseflow and peak flow, as well as human requirements for irrigation and power plant cooling water and domestic usage (Ecosystems Target) … Discussed: Some wordsmithing will be done

VariableRanking in the Cross-SBA List in US-09-01a Status of Observations Possible Follow- on Precipitation#1 In good shape in most areas GPM needs support IGWCO happy to help with US-09-01a follow-on Soil Moisture#2 SMOS & SMAP beneficial. Surface obs need help Surface Humidity U. Air Humidity #6 #17 IGWCO has looked to GEWEX to lead Intercomparison of products. Vegetation Cover (Evapo- transpiration) #7ET is not included as an GCOS ECV ET workshop recently held River flow Observations #19 WMO has advanced HARON proposal NASA/CNES has a mission proposal under development Results of a recent US-09-01A survey of data needs in GEOs nine Societal Benefit Areas

Deliverables (we like objective better) 1.Integrated water-cycle information service Priority Actions: - Data product development -Data System development and implementation -Demonstration and capacity building -User engagement -Leads: Japan, USA, Canada, EC, WMO, IGWCO COP Support: WCRP, ESA, UNESCO, the Netherlands, Germany, France, World Bank, Columbia, Brazil, Argentina, Peru, China, IEEE, Austria,

Deliverables Component 1: Data product Development Component 2: Data Systems Development and coordination Component 3: Demonstration projects and education Component 4: User engagement and operational services -Precipitation -Soil Moisture -Evaportran- spiration -Runoff/ Surface Water -Groundwater -Development of Interoperable Data services - Global Water Cycle Portal - Water ML -Africa - Asia -Latin and Caribbean America -Water for the World -Assessment of benefits of EO -Indicators of the status of water resources --Global Water Cycle Integrator Part of IN-06 STC ADC CBC UIC

Deliverables 2. Global water quality information system Priority Actions: –Algorithms to interpret satellite data –Develop enabling processing platforms and tools –Select test cases and carry out demonstrations –System implementation –Build an integrated model system bringing together a global hydrologic model and GEMS in-situ wq data - Develop a sediment program. Leads: USA, Australia, Germany, Estonia, UNEP Contributors: Canada, IEEE, WMO, UNESCO

Deliverables 3. Cryosphere information system Priority Actions: –If we have a Cryosphere information system in GEO it will only be developed after the upcoming WMO Executive meeting Potential Leads: Canada, IEEE, USA Comments: The approach should emphasize the integrated nature of the information (GTOS comment)

Related Work Plan Progress The February 2011 Second African Water Cycle Initiative Symposium agreed to initiate two transboundary basin studies to demonstrate the value of GEO principles for water management in Africa. The water cycle activities have engaged 1000s of people in discussions about GEO; have brought research funds to advance issues/ products of interest to GEO; and have led to the registration of 240 products and services in the GCI, etc. The Evapotranspiration workshop has launched an effort to make ET an ECV.

Related Work Plan Progress CEOS Water Cycle portal, which builds on CEOP and DIAS is ready to go operational Soil moisture data center has developed a global mapping capability. Precipitation (#1 GEO Variable) activities focused on key scientific issues (measurement of snow and drizzle), extending homogeneous global data sets for trend analysis and preparing for GPM. User engagement activities using simulations to assess drought preparedness have provided assessments of information requirements. Water quality COP established and has developed a plan for satellite applications to water quality mapping.

Re-organization of Sub-tasks in the new work plan Sub-Tasks to be integrated with other activities: WA-06-02A Sub-Tasks to be moved: - WA-06-02C will move to climate activities - WA B and WA-06-02D will move to DS-01 Remainder of the 10 other WA sub-tasks will be folded into DS-05 Deliverables 1 and 2 with WA-08-01G going to the deliverable 2 and the other 9 (including 3 of the top 7 variables from the US-09-01A survey) will be submerged into one deliverable.

Inclusion of New Proposals Deliverable 1: ET to address the needs identified in the user survey and take advantage of major user interest in western USA Integration of GTN-H data centers and CEOS Water Cycle Data Portal and Service (Builds on CEOP and DIAS) Water ML Assessment of benefits of EO in the water sector Indicators of the status of water resources Global Water Cycle Integrator

Inclusion of New Proposals (if any) Deliverable 2: Sediment and Biogeochemical Sources, Fluxes and Sinks (Germany, Bonn University) Sustaining Arctic Observing Networks (USA, USGEO) Incorporated into IN-02 It could support Deliverable 3 in a secondary way (if there is a Deliverable 3!)

Resources Available for Implementation (current status and in planning) EC: Plans to have calls that will address DS-05 and other DS issues. Currently supporting EGIDA, GEO-WOW, etc Japan: MEXT plans to continue support for data system development and Arctic observing systems. CB also is being supported by Japanese agencies. USA – supports all aspects of Deliverables 1 and 2. Germany – supports some aspects of Deliverables 1 and 2 Others supporting meetings: Columbia, Brazil, China, Canada, WMO, UNESCO, etc Methods of access: Write proposals, co-op funded projects and people, proposals to ODAs.

Issues and Gaps Concerns raised: Use of terms such as system and operational (thought to reflect different perspectives on ownership of activities) New work plan appears to confuse links to strategic targets. Coordination mechanisms beyond GEO for DS-05 activities is unclear (Issue for the IGWCO COP).

Issues and Gaps Cryosphere – how do we address the regions of the world where climate change is producing the strongest signals? (Norway, others supportive of GEO initiative in this area) The current structure appears to have consigned GEO activities of three of the variables most in demand by users to a sub-element of a deliverable within one of the tasks. (Not a good example of wanting to communicate how GEO is addressing the needs of the public)

Possible Measures to fill Gaps Work on Cryosphere issues in the background with several options and be ready to roll out one of the options after WMO commitments are clearer. Loss of visibility for US-09-01A priorities. May be too late but it has been suggested we redefine the global water cycle as a Task not a deliverable. Measurement of progress (very little discussion) Possible solution: Conduct of a IGOS-P type theme assessment of global water cycle activities one decade later.

Discussion