Canadian Group on Earth bservations GEO 5 Meeting Ottawa, Canada.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

GEO-5 – Ottawa, 30 November 2004 Arrangements for GEO-6 and Earth Observation Summit III Errol Levy European Commission GEO Secretariat.
Advanced Piloting Cruise Plot.
After Baptism, What Then?. Things To Remember... You are a new creature 2Co 5:17; Ro 6:3-4 You are a babe in Christ 1Co 3:1-2; He 5:12-14 You are in a.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
Documents for GEO & EO Summit II 1.Statement/Communiqué to be agreed by EO Summit II 2.Framework Document to be agreed by EO Summit II 3.GEO Report to.
The GEO Secretariat Progress Report to GEO-2 November 2003 Helen M. Wood Secretariat Director.
The GEO Secretariat Progress Report to GEO-3 February 2004 Helen M. Wood Secretariat Director.
Group on Earth bservations Group on Earth bservations UR&OSG GEO-4 Tokyo April USER REQUIREMENTS & OUTREACH (UR&O) Progress and Next Steps.
27 September 2004, Governance in Brussels Governance in the 10-year Implementation Plan Ivan B. DeLoatch, Toshio Koike, Robert Scholes, and David Williams.
GEO-4 Actions and Timetable Helen Wood Secretariat Director April 2004 GEO Co-Chairs.
28 September 2004, GEO Special Session on Governance Arrangements for GEO-6 and Earth Observation Summit III Errol Levy (GEO Secretariat /European Commission)
Slide 1 Meeting GEO Architecture & Data Committee Seattle July 2006 Report from the Science & Technology Committee Gilles OLLIER European Commission.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
2010 fotografiert von Jürgen Roßberg © Fr 1 Sa 2 So 3 Mo 4 Di 5 Mi 6 Do 7 Fr 8 Sa 9 So 10 Mo 11 Di 12 Mi 13 Do 14 Fr 15 Sa 16 So 17 Mo 18 Di 19.
Richmond House, Liverpool (1) 26 th January 2004.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
DOROTHY Design Of customeR dRiven shOes and multi-siTe factorY Product and Production Configuration Method (PPCM) ICE 2009 IMS Workshops Dorothy Parallel.
July 11, 2013July 18, 2013July 25, 2013August 1, 2013 August 8, 2013August 16, 2013August 29, 2013September 5, 2013 September.
EU market situation for eggs and poultry Management Committee 20 October 2011.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1 Breadth First Search s s Undiscovered Discovered Finished Queue: s Top of queue 2 1 Shortest path from s.
THE WORK AT ANTIOCH. I. WORKED ACCORDING TO ABILITY, Acts 13:1-3 A. "Ministered," v. 3; Eph. 4:11-13; 1 Pet. 4:11; 1 Cor. 12: 14-22; Matt. 25:15, 21,
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Presenteren wij ………………….
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
VPN AND REMOTE ACCESS Mohammad S. Hasan 1 VPN and Remote Access.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Essential Cell Biology
Calendario 2008 MON TUE WED THU FRI SAT SUN January.
Weekly Attendance by Class w/e 6 th September 2013.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Event, March th 2013 Pressure. Event, March th 2013 Temperature.
CpSc 3220 Designing a Database
Overview of Documents for Third Earth Observation Summit
Presentation transcript:

Canadian Group on Earth bservations GEO 5 Meeting Ottawa, Canada

Canadian Group on Earth bservations Boundary Conditions IPTT timeline International Geoscience and Remote Sensing Symposium (IGARSS) September 20-24, Anchorage, Alaska, GEO Experts to offer panel International Astronautical Conference October 4-8, Vancouver, British Columbia, Canada; GEO Co-Chairs in Plenary Session Availability of co-chairs

Canadian Group on Earth bservations 1.Preferred location - Ottawa. 2.September – not a valid option IPTT / IGARSS 3.Shouldering the meeting on the IAC (Oct 4 – 8) not possible 4.Oct 11 – 13 - co-chairs / Sept 30 – Oct 1 venue 5.Advancing the meeting would put strain on the IPTT 6.Late September (27 to 28 th ) - venue

Canadian Group on Earth bservations Current proposal Oct 18 - October 21 October 18; GEOSEC/ IPTT prep October 19; GEO 5 October 20; GEO 5 October 21; IPTT follow-up Decision pending

Canadian Group on Earth bservations ASONDJFMAMJJASONDJ The Path Forward EOS I United States Initial GEO MeetingAugust 1-2 = Document Milestones = GEO Secretariat Meetings =GEO Meetings planned = GEO Meetings notional = Significant Events - Canadian Workshops EOS II Japan EOS III Brussels GEO-2 Italy November G - 8 GEO 5 Canada G - 8

Canadian Group on Earth bservations Canadian Group on Earth bservations Welcomes You