GEOSS Monitoring and Evaluation Charles S. Baker (USA) M&E WG Co-Chair Joint meeting of M&E WG and ET January 20, 2010 Geneva, Switzerland 1.

Slides:



Advertisements
Similar presentations
Understanding Student Learning Objectives (S.L.O.s)
Advertisements

1 Agenda item 4: Work modalities of the revised ISDR system to support the implementation of Hyogo Framework- Elements to be reviewed in groups- & prepare.
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
GEOSS Mid-term Evaluation Architecture and Data Committee – March 2010 Yana Gevorgyan GEOSS Evaluation Team.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
GEOSS Data Sharing Task Force Report: Implementation Guidelines for the GEOSS Data Sharing Principles Alan Edwards, Co-chair (European Commission) On behalf.
C4 and EXCOM 12 Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Overview of the Summary Plan for the First Evaluation of GEOSS Implementation Craig Larlee (Canada) M&E WG Co-Chair Joint meeting of M&E WG and ET January.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
The Implementation Structure DG AGRI, October 2005
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
A Roadmap to Successful Implementation Management Plans.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Developing and Implementing a Monitoring & Evaluation Plan
SAI Performance Measurement Framework
Directions for this Template  Use the Slide Master to make universal changes to the presentation, including inserting your organization’s logo –“View”
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
Module 12 WSP quality assurance tool 1. Module 12 WSP quality assurance tool Session structure Introduction About the tool Using the tool Supporting materials.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
GEO Strategic Plan : Implementing GEOSS
Decision Making Tools for Strategic Planning 2014 Nonprofit Capacity Conference Margo Bailey, PhD April 21, 2014 Clarify your strategic plan hierarchy.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
GEOSS Midterm Evaluation User Interface Committee – March 2010 John Adamec & Yana Gevorgyan GEOSS Evaluation Team.
Evaluation in the GEF and Training Module on Terminal Evaluations
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
GEO Work Plan Symposium 2012 ID-01 Advancing the GEOSS Data Sharing Principles.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
Gilles OLLIER Head of Sector “Earth Observation” Management of Natural Resources – RTD.I.4 Research Directorate General - Environment - RTD.I EUROPEAN.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
The Data Sharing Working Group 24 th meeting of the GEO Executive Committee Geneva, Switzerland March 2012 Report of the Data Sharing Working Group.
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, GEOSS Midterm Evaluation Team GEO Executive.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, Evaluation Team GEO Executive Committee Meeting.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Midterm Evaluation of GEOSS Highlights and Key Messages from the Evaluation Report Charles Hutchinson Chair, GEOSS Midterm Evaluation Team GEO Executive.
QA4EO Update on the Quality Assurance Framework For Earth Observation Joint GSICS GDWG-GRWG meeting.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Evaluation What is evaluation?
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Reporting, Monitoring and Evaluation
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Programme Board 6th Meeting May 2017 Craig Larlee
GEOSS Data Sharing Principles
Measuring Outcomes of GEO and GEOSS: A Proposed Framework for Performance Measurement and Evaluation Ed Washburn, US EPA.
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Return to First Principles
Evaluation in the GEF and Training Module on Terminal Evaluations
Presentation transcript:

GEOSS Monitoring and Evaluation Charles S. Baker (USA) M&E WG Co-Chair Joint meeting of M&E WG and ET January 20, 2010 Geneva, Switzerland 1

2 Requirement for GEOSS M&E 10-year Implementation Plan (2005): Item 7: Technical Approach, Capacity Building and Outreach: To monitor performance against the defined requirements and intended benefits. Item 5: Funding and Measuring Progress GEO will develop performance indicators for GEOSS. Resolution of the Third Earth Observation Summit (2005): Resolve to conduct a mid-term assessment of GEO by Cape Town Declaration (2007): We resolve to meet again before the end of 2010 to review progress, conduct a mid-term assessment and give further guidance on the implementation of GEOSS.

3 At GEO-V in Bucharest, Plenary agreed to Establish M&E WG Task ExCom with defining M&E WG TOR Task ExCom with moving process forward Open M&E WG to membership

4 Accomplishments to Date: M&E WG meetings First meeting in March 2009 Second meeting in July 2009 M&E Briefings to ExCom First briefing in June 2009 Second briefing in September 2009 M&E Briefing to GEO VI Plenary GEO-VI accepted M&E documents in Nov 2009 Nominations for Evaluation Team received

M&E Documents Produced 1.M&E WG Terms of Reference 2.M&E Framework Document 3.Summary Plan for the First Evaluation 5

6 Terms of Reference Define Purpose of M&E WG Define Objectives of M&E WG –Develop M&E Framework –Develop Evaluation Plan Define Approach and Functions of M&E WG –M&E process to be internal, non-complex and low cost –M&E to rely extensively on existing tools and instruments –Performance indicators to be uncomplicated, yet viable –M&E to be conducted by individuals designated by GEO members –M&E WG to provide oversight of the M&E process

Monitoring and Evaluation Framework Principles 1.M&E will be conducted within the perimeters of the GEO community; 2.M&E will take into account the non-binding nature of GEO; 3.M&E will make use of existing M&E tools and practices used in GEO; 4.M&E will address the full spectrum of GEOSS implementation activities; 5.M&E will use performance indicators for monitoring; 6.The M&E process will engage the user community; 7.M&E will provide feedback for improvement of future GEOSS planning and implementation; 8.Lessons learned from the conducted evaluation will inform improvements to the subsequent evaluation processes. 7

8 Principle 7. M&E will provide feedback for improvement of future GEOSS planning and implementation

9 Activitie s Outcomes Impacts What progress did we make towards achieving the targets? Evaluation: Did our activities produce intended outputs? Monitoring: Outputs Inputs GEOSS Logic Model

Approach to Monitoring Monitoring will track the progress of Task completion GEO Secretariat will perform monitoring Monitoring will be ongoing and systematic Monitoring will coincide with Work Plan reporting cycle Information will be collected through Task Sheets Task Sheet Template modified, based on M&E WG input, to: –Identify key milestones, with expected dates for their achievement –Identify quantitative indicators of progress, where appropriate –Enable collection of information on the use of portals –Separate planning from reporting information –Link overarching Tasks to Strategic Targets 10

Approach to Monitoring (contd) Work Plan Progress Report Secretariat will score Overarching Tasks (green, yellow, red) Progress Reports will show the score of the Sub-Tasks when necessary to explain the score of an Overarching Task; Secretariat will identify any gaps in the Work Plan (i.e., critical areas requiring work but for which no task is yet underway). Revised GEOSS Roadmap database will provide information for assessing progress toward achieving Targets; Secretariat will give an overall score for each Strategic Target; Distribution of Progress Report should be expanded to ensure that all parties involved in proposing, executing, or reviewing corrective actions are fully informed at all stages of the process. 11

Approach to Monitoring (contd) M&E WG will develop performance indicators for monitoring; Draft set of indicators will be presented to the ExCom for approval in late spring 2010; Upon approval of these indicators by ExCom, Secretariat will expand Progress Report to include a report on each of the indicators. 12

13 Approach to GEOSS Evaluation Establish Evaluation Team to conduct evaluation; New Evaluation Team will be appointed for each evaluation; First evaluation, mid-term assessment, based on Cape Town Declaration; Second evaluation to begin transition to regular cycle of evaluating GEOSS Targets: One GEOSS Transverse Area Target One GEOSS Societal Benefit Area Target Evaluation of unplanned contributing activities; Third and subsequent evaluations to be based on a regular cycle: Two or three Transverse Area Targets per year Three Societal Benefit Area Targets per year Future ministerial statements included in the scope of evaluations; Complete evaluation report(s) will be offered for factual review by the stakeholders.

14 GEOSS Building Blocks and SBAs

15 Summary Plan for the First Evaluation First evaluation will focus primarily on progress towards realizing priorities identified in the Cape Town Declaration; Other aspects of GEOSS implementation will be evaluated within the context of these priorities; Strategic Targets will be a key reference for clarifying the intended priorities and outcomes for GEOSS; Evaluation Team will make extensive use of Progress Reports and updated GEOSS Roadmap database; Draft evaluation report will be circulated within the GEO community for factual review; The Evaluation Team is solely responsible for the findings, conclusions and recommendations in the evaluation report. ExCom will coordinate response to the recommendations. 15

Cape Town Declaration We confirm our common view that: The sustained operation of terrestrial, oceanic, air-borne, and space-based observations networks is critical for informed decision making; Data interoperability is critical for the improvement and expansion of observational, modelling, data assimilation, and prediction capabilities; Continued research and development activities and coherent planning as essential for future observation systems; Continued cooperation and dialogue will establish GEOSS as a powerful means to support informed decision making; Coordination, at national, regional and global levels, continued investments, scientific and technological advances and innovative approaches to financing will be vital for upgrading and expanding Earth observations and building the capacity of individuals, institutions and systems, particularly in developing countries; We support the establishment of a process with the objective to reach a consensus on the implementation of the Data Sharing Principles for GEOSS to be presented to the next GEO Ministerial Summit. The success of GEOSS will depend on a commitment by all GEO partners to work together to ensure timely, global and open access to data and products; We commit to explore new ways and means for the sustained operations of the shared architectural GEOSS components and related information infrastructure; We commit ourselves to working together to improve the interoperability of and access to observation and associated prediction and information systems towards the continued strengthening of GEOSS and the full realization of the 10-Year Implementation Plan. 16

17 Evaluation Team M&E WG will appoint Chair/Co-Chairs. 17

18 Timeline of Evaluation Activities 18

BACK UP SLIDES 19

20 Guidelines for M&E WG Prepare final draft ToR Recognizing that M&E should be within GEO perimeter Recognizing that M&E should involve user community Recognizing that M&E should be independent of Committees Develop M&E Framework Observe the need for efficiency, simplicity and optimal use of resources Focus initially on monitoring, making use of available tools and instruments Develop a simple procedure for evaluation Recommend improvements to Task Sheets as the key monitoring tool Review and consolidate GEOSS Roadmap Develop parameters, criteria and indicators for evaluation

21 Guidelines for M&E WG contd. Develop Plan for First Evaluation Recognizing particular nature of GEO Recognizing the pilot nature of evaluation Recognizing the need to inform improvements in M&E framework Recognizing challenging schedule

Evaluation Questions What Should be Observed (Evaluation Criteria) Information Required To what extent do the Strategic Targets (and the associated outcomes) adequately reflect the priorities and commitments in the Cape Town Declaration? Strategic Targets include all significant aspects of the priorities and commitments in the Cape Town Declaration. Cape Town Declaration Strategic Targets document Evidence supporting the interpretation of the above documents. To what extent are the Work Plan Tasks reflective of the actions required to achieve the Strategic Targets? All Tasks are necessary to the achievement of the Strategic Targets. Processes are in place to identify gaps in the current Work Plan where additional Tasks are required to achieve Strategic Targets and to solicit offers to fill these gaps. Strategic Targets document GEOSS Roadmap Completed Task Sheets (current and past versions) Evidence regarding the relationship of Tasks to Targets. Evidence regarding work planning and gap analysis processes. To what extent are the Tasks being implemented as intended? Statement of targets and milestones in GEO planning documents in a form that permits objective verification against actual performance Actual performance reflects substantial achievement of performance expectations Completed Task Sheets (current and past versions). Work Plan Progress Reports and other information regarding the status of all Tasks. Information concerning the actual conduct of work planning, Task management, and reporting processes 22

To what extent are expected outcomes of GEOSS being realized? Clearly stated expected results that inform work planning and performance monitoring Achievement of near-term outcomes in some domains, although likely of limited scope Statement of expected outcomes for GEOSS in a form that depicts the logical relationships between GEOSS Tasks and the expected outcomes at various levels and/or time scales and between the expected outcomes and the ultimate intended impacts of GEOSS Evidence that statements of GEOSS outcomes influence the selection of Tasks Information regarding processes for the monitoring and assessment of outcomes related to GEOSS Evidence regarding the achievement of near-term GEOSS outcomes Are there significant unplanned benefits or unintended negative consequences of GEOSS? Documentation of unplanned benefits of GEOSS Absence of any significant negative unintended consequences. Information concerning the existence and magnitude of unintended consequences of participation in GEO, GEO Tasks or of GEOSS operations 23