The GEO 2009-2011 Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)

Slides:



Advertisements
Similar presentations
Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník, Czech Hydrometeorological Institute Role of WMO in Natural Disaster Risk Reduction Ivan Obrusník,
Advertisements

LIVING WITH RISK : AN INTEGRATED APPROACH TO REDUCING SOCIETAL VULNERABILITY TO DROUGHT ISDR AD HOC DISCUSSION GROUP ON DROUGHT ISDR TF April 2003.
Page 1 GEO/CEOS-SIT Call to Action Ken McDonald WGISS Vice-Chair.
© GEO Secretariat The GEO WORK PLAN Draft Version 2 TOWARD CONVERGENCE Osamu Ochiai, GEO Secretariat CEOS/WGISS Meeting, Annapolis, USA,
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
DS-01 Disaster Risk Reduction and Early Warning Definition
GEO Work Plan Symposium 2011 Days 2 & 3 ID-01 Data Sharing.
GEO Work Plan Symposium 2011 Global Biodiversity Observation (DS-14)
GEO Work Plan Symposium 2011 Day 3 DS-11 Global Forest Observation.
Capacity Building Mandate We, the participants…recognize the need to support: …A coordinated effort to involve and assist developing countries in improving.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
Standards and Interoperability Forum: Status, Issues & Plans GEO Architecture and Data Committee Kyoto, Japan 9 February 2009 Siri-Jodha Singh Khalsa.
GEO Work Plan Symposium 2011 Infrastructure May 5, 2011.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee March 2009.
GEO Work Plan Symposium 2011 Task DS – 13 Global Ecosystems Monitoring.
ID-04 Building Communities and Increasing Awareness & ID-06 (proposed) Building a user-driven GEOSS.
© GEO Secretariat Work Plan Development Toward Convergence Capacity Building Committee Meeting September 2006 Brussels Imraan Saloojee.
Report from the 7th GEO S&T Committee Meeting Gilles OLLIER – Policy Officer « Earth Observation » EUROPEAN COMMISSION Research Directorate General - Environment.
The GEOSS Science and Technology Stakeholder Network: A spin-off of the EGIDA Project Hans-Peter Plag, Ian McCallum, Steffen Fritz, Shelley Jules-Plag,
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
GEO Forest Observation Community of Practice: Identifying Critical Earth Observations Michael Brady, Canadian Forest Service/GOFC-GOLD GEO User Interface.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
GEO Work Plan Symposium 2011 Days 2 & 3 DS-04 - Oceans.
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
GEO Work Plan Societal Benefit Areas tasks Report from Brainstorming session GEO European Projects Workshop 3-4 September, 2008 Brussels, Belgium.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
© GEO Secretariat Capacity Building Committee experience of resource mobilisation Alan EDWARDS EUROPEAN COMMISSION Research Directorate General Environment.
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
Multidisciplinary interoperability To build Operating Capacity Initial (IOC): extend current GEO IP3/AIP-2 interoperability systems in Forest, Biodiversity,
© GEO Secretariat GEO Overview GEO Secretariat September 2007.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
GEO Cold Regions: from Regional to Global effort --- As the interface between SAON and GEOSS Yubao Qiu Vancouver, Canada 29 March 2013.
Task ID-05 IDIB report ID-05 Catalyzing Resources for GEOSS Implementation C1 - Resource Mobilization for Capacity Building C2 - Resource Mobilization.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
Plenary Session P4: GEOSS Strategic Targets and Their Alignment to Millennium Development Goals and Global Sustainability Research GEOSS Science and Technology.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
GEO Strategic Target on Climate (Carbon) Facilitate a comprehensive global carbon observation and analysis system in support of decision-making, including.
Strategic Targets: GEOSS Implementation by 2015 GEO Monitoring & Evaluation Working Group Geneva, January 2010 Douglas Cripe GEO Secretariat.
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
Energy Expert Meeting Aug 06 Contents Who is GEO? What is GEOSS? What is GEO Added-Value? GEO & Energy Management.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
GEOSS Evaluation Task Analysis John Adamec GEOSS ET Meeting, Geneva, Switzerand March 22-25, 2010.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
What is GEO? launched in response to calls for action by the 2002 World Summit on Sustainable Development, Earth Observation Summits, and by the G8 (Group.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Preparation of the 2010 GEO Ministerial Summit GEO Science and Technology Committee Preparation of the 2010 GEO Ministerial Summit Gilles OLLIER Head of.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
FP7* support to GEO activities Update for 5 th GEO ADC Meeting A Edwards Washington, D.C., U.S.A September 2007 * FP7 is the European Community’s.
GEO 2014 Work Plan Symposium Opening Remarks Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 28 April 2014.
Introduction to GEO/GEOSS and GEO Cold Region Yubao Qiu GEO Secretariat 26 October 2012 Beijing, China.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
© GEO Secretariat GEO Work Plan Overview Document 20 GEO-VIII Plenary November 2011.
ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014.
The GEOSS Portfolio for Science and Technology Produced by ST (PoC: Hans-Peter Plag,
Douglas Cripe, GEO Secretariat 3rd African Water Cycle Coordination Initiative Workshop 4-5 February 2013 El Jadida, Morocco Introduction to GEO.
© GEO Secretariat Welcome Note on Behalf of GEO S&T Stakeholders Workshop Bonn, Germany 28 August 2012 Barbara J. Ryan Director, GEO Secretariat.
Slide 1 GEO-GLAM The GEO led Initiative for GLOBAL AGRICULTURAL MONITORING GEO Agriculture Community of Practice 1.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Towards a New Phase of GEOSS Implementation : The GEO Work Plan Alexia C. Massacand GEO Work Plan Coordinator
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Capacity building coordination Mark Noort HCP International Andiswa Mlisa GEO secretariat GEO WP Symposium Geneva, Switzerland May 4th, 2016.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Building a User Driven GEOSS Masami Onoda, GEO Secretariat Workshop at 34th ISRSE, Sydney, Australia 10 April, 2011.
Presentation transcript:

The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)

GEO Group on Earth Observations GEOSS Global Earth Observation System of Systems

GEO is an Intergovernmental Group –79 Nations –European Commission –56 Participating Organizations With a Single Objective: GEOSS –To establish a global, coordinated, comprehensive and sustained system of Earth observation systems

GEOSS Components

GEO Portal (ESRI, Compusult, ESA)

Work Plan

GEO Work Plan – What is it? Agreed framework for implementing the GEOSS 10-Year Implementation Plan ( ) Set of practical Tasks carried out by various GEO Members and Participating Organizations Living Document – Annually updated

GEO Work Plan History 2009 WP WP WP Cape Town Summit

Work Plan – How did it come about? Followed recommendations from GEO-IV Plenary & Cape Town Ministerial Summit Built upon Work Plan Driven by 6- and 10-year GEOSS Targets Included proposals & comments made by GEO community and Committees

Work Plan (1) Two-part structure (2) Overarching Tasks (3) « User-Driven » Approach

(1) Two-Part Structure 1BUILDING AN INTEGRATED GEOSS (GEOSS Fundamentals) ARCHITECTURE DATA MANAGEMENT CAPACITY BUILDING SCIENCE AND TECHNOLOGY USER ENGAGEMENT 2THE 9 GEOSS SOCIETAL BENEFIT AREAS (GEOSS for Society) DISASTERS HEALTH ENERGY CLIMATE WATER WEATHER ECOSYSTEMS AGRICULTURE BIODIVERSITY

(2) Overarching Tasks 44 overarching Tasks that help: Promote synergies & cross-fertilization Move Work Plan to more strategic level Highlight key lines of GEOSS implementation

44 overarching Tasks including… Part 1 : BUILDING AN INTEGRATED GEOSS 1.1ARCHITECTURE AR-09-01: GEOSS Common Infrastructure (GCI) AR-09-02: Interoperable Systems for GEOSS AR-09-03: Advocating for Sustained Observing Systems AR-09-04: Dissemination and Distribution Networks AR-06-11: Radio Frequency Protection 1.2DATA MANAGEMENT DA-06-01: GEOSS Data Sharing Principles DA-09-01: Data Management DA-09-02: Data Integration and Analysis DA-09-03: Global Data Sets 1.3CAPACITY BUILDING CB-09-01: Resource Mobilization CB-09-02: Building Individual Capacity in Earth Observations CB-09-03: Building Institutional Capacity to Use Earth Observations CB-09-04: Capacity Building Needs/Gap Assessment CB-09-05: Infrastructure Development and Technology Transfer CB-10-01: Building Capacity through Outreach and Awareness Raising 1.4SCIENCE AND TECHNOLOGY ST-09-01: Catalyzing R&D Funding for GEOSS ST-09-02: Promoting Awareness and Benefits of GEO in the S&T Community 1.5USER ENGAGEMENT US-09-01: User Engagement US-09-02: Socio-Economic Indicators US-09-03: Cross-cutting Products and Services

44 overarching Tasks including… Part 2: THE 9 GEOSS SBAs 2.1DISASTERS DI-06-09: Use of Satellites for Risk Management DI-09-01: Systematic Monitoring to Support Geohazards Risk DI-09-02: Multi-Risk Management and Regional Applications DI-09-03: Warning Systems for Disasters 2.2HEALTH HE-09-01: Information Systems for Health HE-09-02: Monitoring and Prediction Systems for Health HE-09-03: End to End Projects for Health 2.3ENERGY EN-07-01: Management of Energy Sources EN-07-02: Energy Environmental Impact Monitoring EN-07-03: Energy Policy Planning 2.4CLIMATE CL-06-01: A Climate Record for Assessing Variability and Change CL-09-01: Information for Decision-making & Risk Management CL-09-02: Accelerating the Implementation of GCOS CL-09-03: Global Carbon Observation & Analysis System

44 overarching Tasks including… 2.5WATER WA-06-02: Droughts, Floods and Water Resource Management WA-06-07: Capacity Building for Water Resource Management WA-08-01: Integrated Products for Water Research 2.6WEATHER WE-06-03: TIGGE & Global Interactive Forecast System WE-09-01: Capacity Building for High-Impact Weather Prediction 2.7ECOSYSTEMS EC-09-01: Ecosystem Observation and Monitoring Network (EcoNet) EC-09-02: Ecosystem Vulnerability to Global Change 2.8AGRICULTURE AG-06-02: Data Utilization in Fisheries and Aquaculture AG-07-03: Global Agricultural Monitoring Risk Management 2.9BIODIVERSITY BI-07-01: Global Biodiversity Observation Network (GEO BON)

2010 Update ?

Technical & official comments received from GEO community No major change but rather a series of adjustments Process – Work Plan Update

5 New Sub-tasks Created: * Global Geodetic Observing System (AR-09-03e) * Long-Term Preservation of EO Data (DA-09-01c) * Data Democracy (CB-09-05e) * Atlas of our Changing Environment (CB-10-01d) * Key Observations for Climate (CL-09-02a) Changes – Work Plan Update

5 Existing Sub-tasks Moved Unchanged: * CB-09-02e Earth Observation Game for Youth moved to CB-10-01a * CB-09-03c Building Capacity for Non-technical Decision-makers moved to CB-10-01b * CB-09-04c User Oriented Workshops for GEOSS Outreach moved to CB-10-01c * US-09-03b Forest Mapping and Change Monitoring moved to EC-09-01e (Ecosystems) * US-09-03c Global Soil Data moved to DA-09-03e Changes – Work Plan Update

* Refined Task descriptions * New Task Leads and Points of Contact Following Members and Participating Organizations requests Changes – Work Plan Update

* Updated Guide to Work Plan Management Description of: - Steps required for becoming engaged with Work Plan Tasks - Overarching Task Management - Role of Committees Changes – Work Plan Update

* Available on-line (earthobservations.org) * New Work Plan Information Management System (incl. Task Sheets etc) * Launched on 10 December 2009 * To be expanded 2010 Work Plan Update

Activities InputsOutputsOutcomes Contributions from Members and Participating Organizations GEOSS Roadmap Work Plan Task sheets Reporting Reporting and Monitoring Evaluation Targets Outcome Performance Indicators Fig. 2 GEOSS Logic Model From GEO-V Document 11