DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001.

Slides:



Advertisements
Similar presentations
HIV Drug Resistance Training
Advertisements

WHO - PSM Documentation – Part 2 Workshop on GMP and Quality Assurance of TB products Kuala Lumpur Malaysia, 21 – 25 February 2005 Maija Hietava M.Sci.Pharm.
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section PACKAGING Title Packaging Maintenance and Replacement Guidelines Control.
Transition from Q1- 8th to Q1- 9th edition
Copy Exact Training For SMC Suppliers
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Unitization and Palletizing Requirements Control No.
Departmental Petty Cash Funds Boston University Medical Campus Revised 9/09.
Supplier SQM Participation. 2 | MDT Confidential What is SQM? Stands for Supplier Quality Managment –Formally referred to as SPACE and SPICE Is a system.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Management System
Quality control of raw materials In-process control
Quality Assurance/Quality Control Policy
Review of the Systems Approach Work Plan for the Exportation of Apples from the United States into Taiwan Presented by APHIS July 26 and 27, 2005.
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Expendable Packaging Requirements Control No. PKG-004.
Pollution Prevention Toyota Industrial Equipment Mfg., Inc. December 7, 2011.
VALIDATION METHODOLOGY
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
Mobile Audio/Video Recording Equipment Policy and Procedure Number PP
ZHRC/HTI Financial Management Training Session 9: Stores and Supplies Management.
ALCOM Confidential 1 Supplier Controlled - Safe Launch Plan Sep 2013.
1. Session structure Definition Overview Actions Challenges Outputs Exercise Module 8 Prepare management procedures 2.
Important informations
Aloe Vera of America: A Quality IASC-Certified Producer of Aloe Vera Presented by Walt Jones.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Resource Management Resource Management 3.03 Understand support services.
Proprietary + Confidential1 Tech Review Guideline Please arrive at your Tech Review ready to present and discuss all of the following information. The.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
Module 12 - part 2Slide 1 of 23 WHO - EDM Basic Principles of GMP Documentation Part 2 Part One, 14.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
DENSO Supplier Labeling Policy
Thanks for giving me an opportunity to share with you our process for controlling media and other supplies. Disclaimer: We are not yet accredited to ISO.
DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Returnable Packaging Requirements Control No. PKG-005.
Quality Control significance in pharmaceutical industry
Supplier Corrective Action Request (SCAR) Supplier Training
Cooling Tower Audit Nathan Maple City of Marion. Why do we undertake an audit and sampling? Regulation 15 South Australian Public Health (Legionella)
Production Part Approval Process
Part Approval / Compliance Data Submission via Jotform.com
Title I Equipment Inventory Requirements
CO Chemical Safety Workshops for Regulated Facilities
Title I Equipment Inventory Requirements
Title I Equipment Inventory Requirements
ROUTE MANAGER TRAINING
Title I Equipment Inventory Requirements
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
<NPI/Engineering Change/Phase Out>
<Labeling and Shipping>
NA Supplier Packaging Standards << Returnable Packaging >>
Section 8 <PC Forms>
Part Approval / Compliance Data Submission via Jotform.com
Resource Management 3.03 Understand support services
SQA01 Guidance Material: FAI Review
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management PP Understand support services
Production Part Approval Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Resource Management 3.03 Understand support services
Title I Equipment Inventory Requirements
Resource Management 3.03 Understand support services
Order procurement Input: customer need Sales: identifies customer need
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
DENSO Production Control Supplier Manual
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Resource Management 3.03 Understand support services
Presentation transcript:

DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Title Packaging Program Responsibilities Control No. PKG-001 Purpose: Packaging Assumptions Returnable Packaging Ownership Policy: Responsibility: Date Issued : Date Revised : To define the responsibilities associated with the DMMI Packaging Program. DMMI will purchase and retain ownership of returnable packaging unless otherwise specified. Returnable packaging Purchase Policy: DMMI Production Control Engineering (PCE) will calculate the quantity of returnable packaging required to support the system from Denso to tier one supplier unless otherwise specified. If the supplier would like more packaging at launch than DMMI will purchase, the supplier may submit a written request to PCE. PCE will purchase the additional packaging and the supplier will be invoiced for the cost. DMMI will retain ownership of this packaging. When returnable containers are implemented, all shipments are expected in the returnable containers. Shipments in expendable packaging will not be allowed if the supplier is not maintaining acceptable inventory levels. 1.DMMI Production Control Engineering (PCE) A) General Responsibilities Provide supplier with DMMI requirements Review the suppliers packaging specifications for component parts Provide suppliers with approved packaging specifications for A-parts Request test shipments as necessary Approve the workability of the packaging within DMMI Investigate and implement cost reductions (1) G:PRD_CTRL/SUPPLIER MANUAL UPDATES 2009/SUPPLIER MANUAL UPDATES 2011/ Packaging Program Responsibilities

DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Date Issued : Date Revised : Title Packaging Program Responsibilities Control No. PKG-001 B) Expendable Packaging Responsibilities Review the suppliers packaging specifications for components and A-parts C) Returnable Packaging Responsibilities Assist in determining ownership of containers Establish system days allocation for DMMI owned containers II DMMI Production Control Logistics A) General Responsibilities Review request for returnable packaging deviations Monitor allocation levels for DMMI owned containers III DMMI Purchasing / Localization A) General Responsibilities Preview and approve packaging cost (2) IV Supplier A) General Responsibilities Review and adhere to DMMI Requirements Monitor packaging condition and ensure quality of pack before use *Clean returnable containers. Include removing dirt, water, debris, residue, worn expendable dunnage, etc.. as required. Routine checks should be made and regular cleaning must occur as needed to ensure part quality and cleanliness during the life of the container. *Load production parts into clean undamaged containers ONLY. *Load packaging into transportation equipment in a manner that maintains part quality. Designate a packaging contact to resolve packaging related issues G:PRD_CTRL/SUPPLIER MANUAL UPDATES 2009/SUPPLIER MANUAL UPDATES 2011/ Packaging Program Responsibilities

DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Date Issued : Date Revised : Title Packaging Program Responsibilities Control No. PKG-001 (3) Investigate packaging improvements Support DMMI packaging cycle counts upon request Provide packaging cost analysis to DMMI purchasing Submit new specification when: (1) Part has design change (ECI) (2) Package changes *(3) Lot size changes (use form FRM-003) (4) Upon request from PCE (5) When new business is awarded Submit new packaging specs 24 weeks prior to mass production, unless business is awarded after the 24 week mark, then PCE will direct. Orders must be shipped in mass production packaging once lot size is established packaging received and packaging specification approved. B) Expendable Packaging Responsibilities Submit sample packs and perform package testing when necessary Utilize approved packaging design for mass production Utilize DMMI standard wood pallets (48’ x 45”) C) Returnable Packaging Responsibilities (1) Supplier Owned Returnables Must be approved by DMMI PCE Department Must meet AIAG standards Must be cleaned and maintained by the supplier Must monitor / maintain system requirements (2) DMMI Owned Returnables Inspect all containers, prior to use, for damage and reject packaging that will not ensure part quality and / or operator safety. G:PRD_CTRL/SUPPLIER MANUAL UPDATES 2009/SUPPLIER MANUAL UPDATES 2011/ Packaging Program Responsibilities

DENSO Denso Manufacturing Michigan Inc. Production Control Supplier Manual Section Packaging Date Issued : Date Revised : Title Packaging Program Responsibilities Control No. PKG-001 *Remove all onetime shipping labels from returnable packaging so new labels can be applied. Monitor production changes and notify DMMI PCL of potential shortages before the situation becomes a crisis Utilize approved designs for mass production Request packaging deviation approval from PCL (24 hours prior to shipment) if required to use an expendable backup system (3) Backup Packaging Maintenance The supplier must maintain a sufficient supply of expendable packaging of the same dimensions and lot size as the returnable container. This is used for pilot programs, special shipments and returnable containers shortages. The supplier must obtain three quotes for Lid, Box, Dunnage (if needed) and pallet. These quotes are to be forwarded to DMMI PCE. G:PRD_CTRL/SUPPLIER MANUAL UPDATES 2009/SUPPLIER MANUAL UPDATES 2011/ Packaging Program Responsibilities (4) End of Procedure * Denotes change