ILRS Analysis Working Group, Orbit Benchmark Study NERC Space Geodesy Facility Graham Appleby Presentation to AWG, 2002 Oct 3-4, HTSI, MD, USA.

Slides:



Advertisements
Similar presentations
Polynomial Inequalities in One Variable
Advertisements

Centre-of-mass correction issues: Toward mm-ranging accuracy Toshimichi OTSUBO National Institute of Information and Communications Technology.
Where do precise orbits and clocks come from? Kristine M. Larson ASEN 6090 Spring 2010.
Principles of the Global Positioning System Lecture 19 Prof. Thomas Herring Room A;
Colorado Center for Astrodynamics Research The University of Colorado ASEN 5070 OD Accuracy Assessment OD Overlap Example Effects of eliminating parameters.
04/22/02EGS G STABILITY OF GLOBAL GEODETIC RESULTS Prof. Thomas Herring Room ;
Introduction to multi-objective optimization We often have more than one objective This means that design points are no longer arranged in strict hierarchy.
Quantity of Water and Wastewater CE 547. Probability Quantity of Water Types of Wastewater Sources of Wastewater Population Projection Deriving Design.
3. Geocentre and scale Comparison of weekly and daily IGS reference frames: the first year Peter J Clarke, School of Civil Engineering and Geosciences,
Astronomical Institute University of Bern 64 th International Astronautical Congress September 2013, Beijing, China Assessment of possible observation.
VieVS User Workshop 7 – 9 September, 2010 Vienna Vie_LSM Kamil Teke and Johannes Böhm.
16 October th International Workshop on Laser Ranging 1 Implementing the Consolidated laser Ranging Data (CRD) Format throughout the ILRS Network.
Missions Working Group report to ILRS General Assembly Friday October 17th 2008 Poznan, Poland Graham Appleby and Peter Shelus GOCE, ESA.
Chapter 13 – Vector Functions
KHz Single Photon Ranging: A Precise Tool to Retrieve Optical Response of Satellites Toshimichi Otsubo Hitotsubashi University 16th International Workshop.
2-3 November 2009NASA Sea Level Workshop1 The Terrestrial Reference Frame and its Impact on Sea Level Change Studies GPS VLBI John Ries Center for Space.
VieVS User Workshop 14 – 16 September, 2011 Vienna VIE_MOD Lucia Plank.
ILRS Workshop, Poznan, Poland, October Status of ITRF Development and SLR Contribution Zuheir Altamimi Xavier Collilieux David Coulot IGN France.
Analysis Working Group Report ILRS General Assembly Meeting Poznań, Poland, Oct. 16, 2008 Erricos C. Pavlis Analysis Coordinator.
Dr. Jie ZouPHY Chapter 42 Atomic Physics (cont.)
Attempts to separate apparent observational range bias from true geodetic signals Graham Appleby, Philip Gibbs, Matthew Wilkinson, Vicki Smith Space Geodesy.
ESTIMATION OF THE ELASTICITY EARTH PARAMETERS FROM THE SLR TECHNIQUE M.Rutkowska Space Research Centre, Polish Academy of Sciences M. Jagoda Technical.
Regular Deposits And Finding Time. An n u i t y A series of payments or investments made at regular intervals. A simple annuity is an annuity in which.
Group practice in problem design and problem solving
Chapter 2 Motion Section 1: Describing Motion
Titelmaster Geometrical and Kinematical Precise Orbit Determination of GOCE Akbar Shabanloui Institute of Geodesy and Geoinformation, University of Bonn.
March 1 & 2, 2005NC&I WG GGOS Meeting/GFZ1 International Laser Ranging Service GGOS Meeting GFZ Potsdam Germany March 1 and 2, 2005.
IGS Analysis Center Workshop, 2-6 June 2008, Florida, USA GPS in the ITRF Combination D. Angermann, H. Drewes, M. Krügel, B. Meisel Deutsches Geodätisches.
1 Self-Assessment of Chapter 1 Limits and Continuity MATH 1591-Calculus I.
Introduction to multi-objective optimization We often have more than one objective This means that design points are no longer arranged in strict hierarchy.
IGS Workshop, June 02, Validation of GNSS Satellite Orbits C. Flohrer, G. Beutler, R. Dach, W. Gurtner, U. Hugentobler 1, S. Schaer, T. Springer.
GOCE Workshop at ESA LP Symposium, Bergen, 29./30.June, 2010 Precise Science Orbits for the GOCE Satellite – Aiming at the cm-level H. Bock 1, A. Jäggi.
Honeywell Technology Solutions Inc AWG Meeting, Washington DC, Oct 3-4, 2002 Comparison of ILRS Station Positions (“AA” & “A” Series, i.e. 1999) Van Husson.
ESOC Navigation Support Office IGS Workshop 2008 Miami ESOC IGS Reprocessing T.A. Springer, F. Dilssner, E. Schoenemann, I. Romero, J. Tegedor, F. Pereira,
Picturing Motion: Dot Diagrams If you related the position of the runner to the background in each frame taken in 1 second intervals, you would conclude.
The use of the Consolidated Prediction Format at Zimmerwald Werner Gurtner Astronomical Institute University of Bern ILRS Workshop 3-7 October 2005 Eastbourne.
International Workshop on Laser Ranging, October 2008, Poznań (Poland) Quality assessment of the ILRS EOP „Daily” Product G. Bianco Agenzia Spaziale.
Combination of long time series of tropospheric parameters observed by VLBI R. Heinkelmann, J. Boehm, H. Schuh Institute of Geodesy and Geophysics, TU.
Application of a North America reference frame to the Pacific Northwest Geodetic Array (PANGA) M M Miller, V M Santillan, Geodesy Laboratory, Central Washington.
Honeywell Technology Solutions Inc AWG Meeting, Washington DC, Oct 3-4, 2002 Benchmarking #1 Software Benchmarking Results V. Husson.
Global VLBI Solution IGG05R01 1 Institute of Geodesy and Geophysics (IGG), Vienna, Austria 2 German Geodetic Research Institute (DGFI), Munich, Germany.
Solving a Trigonometric Equation Find the general solution of the equation.
Autocorrelation in Regression Analysis
Feedback from CH02 HTML files Filenames No spaces in filenames You will be provided with filenames CH02 files should be rockclimbing.html rockclimbingstyle.html.
Objective 12 Order real numbers © 2002 by R. Villar All Rights Reserved.
Vermelding onderdeel organisatie A 3-year series of Earth’s gravity field derived from GRACE range measurements Xianglin Liu, Pavel Ditmar, Qile Zhao,
Workshop, Miami, June 2008 IGS Contribution to ITRF Zuheir Altamimi & Xavier Collilieux IGN, France.
Jason-1 POD reprocessing at CNES Current status and further developments L. Cerri, S. Houry, P. Perrachon, F. Mercier. J.P. Berthias with entries from.
Honeywell Analysis WG (May 22-23, 2000)1 ILRS Station Coordinate Comparison (SINEX Format & Data Integrity) Van Husson.
Determination of the SLR station coordinates and velocities on the basis of laser observations of low satellites Paweł Lejba, Stanisław Schillak Space.
Earth, Atmospheric and Planetary Sciences Massachusetts Institute of Technology 77 Massachusetts Avenue | Cambridge MA V F
1 Validation of Swarm ACC preliminary dataset Swarm 5th Data Quality Workshop, Institut de Physique du Globe de Paris, France, 7 – 10 September 2015 Aleš.
IERS Combination WG and CPP Meeting, April 27, 2005, TU of Vienna, Austria Strategies for Weekly Routine Generation of Combined IERS Products Markus Rothacher.
IERS Directing Board Meeting No.39, BIPM Paris, September 23, 2004 IERS2005: Plan “Integrated Earth orientation parameters, Radio sources, and Site coordinates.
A train traveling at 20 m/s
NSGF prediction service
Picturing Motion: Dot Diagrams
CMP Model Effects on ILRS Products
Writing Linear Equations
Take out Friday’s Practice Worksheet!!!
Finding the Zeros of a Polynomial Function
Self-Assessment of Chapter 1 Limits and Continuity
Solving Quadratic Inequalities algebraically
6.5 Solving Inequalities by Factoring
X SERBIAN-BULGARIAN ASTRONOMICAL CONFERENCE 30 MAY - 3 JUNE, 2016, BELGRADE, SERBIA EARTH ORIENTATION PARAMETERS AND GRAVITY VARIATIONS DETERMINED FROM.
An example of using euler.m
More About Matter Waves
SDMX Implementation: the process
Physics Chapter 6 Equilibrium.
The Search for Lagrange Point 1
Presentation transcript:

ILRS Analysis Working Group, Orbit Benchmark Study NERC Space Geodesy Facility Graham Appleby Presentation to AWG, 2002 Oct 3-4, HTSI, MD, USA

Orbit Comparisons Took analysis groups’ SolA, B and C geocentric ephemerides X and Xdot Formed differences, mainly from nerc, between values of X at each 2-minute epoch Resolved differences into along, across and radial directions. Plotted as functions of time

Orbit benchmark-comments (1) the initial orbits (solA) run off amongst themselves by between zero, 1m and 4m along-track; For ausg-jcet, the differences are essentially zero. For the second stage (solB): some groups (csr, crl, nerc, iaa) appear to solve for all orbital params; others (jcet, asi, ausg) probably only solve for corrections to the initial state vector and initial 4-day along-track accelerations; GEODYN groups agree with each other very well; clear discontinuities at regular (4-day) intervals in the iaa orbits.

Orbit benchmark-comments (2) For solC orbits: GEODYN groups probably not correcting their orbits as a result of the solutions for stations and EOPs; Some good agreements (nerc - csr, crl, iaa; ausg – jcet; nsd – jcet); Some cm-level diurnal periodicities present in some differences.

Comparison of EOPs in SolC.snx For those institutes that submitted SolC.snx files: Simple differencing of Xp, Yp and UTsat from a-priori C04 series given in sinex files Plots of results show: –asi, jcet apply loose constraints –dgfi apply strong constraints